Permit GraphShortlistSan Francisco building permits since 2000

Gregory Kent Motschenbacher David Michael Kievet

License
624683
Contractor
About the Contractors State License Board
State contractor license record
Listed as
authorized agent-others, contractor
Firm
The Boldt Company
Based in
Appleton
On San Francisco permits
Apr 2020 to Apr 2026

19 permits since 2000 (contractor on 19 permits, authorized agent-others on 1 permit): 13 completed, 3 in progress, 2 never finaled, 1 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. Their ranked record as a contractor is on their contractor page. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Architects
Sujendra Mishra (5), Chun-Kei Wong (2), Curtis Chong (2), Donald Toy, Madelyn Mcclellan, Smith Group
Engineers
David Rodriguez (2), Carrie Mitchell, Chris Mcnamara, Emily Guglielmo, Maryann T. Phipps, Matthew Denny, Mohammad Dehghan, Pardeep Jhutti, Tan A. Diep

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Apr 8, 2026Completed
final sign-off Apr 2026
3838 California StThe Boldt Companyto obtain final inspection for work approved under pa#: 202412237339. all work is complete.
Details
Permit
202604089122
Permit issued
Apr 8, 2026
Final sign-off
Apr 15, 2026

to obtain final inspection for work approved under pa#: 202412237339. all work is complete.

Open the permit page

Jan 22, 2026Completed
final sign-off Jun 2026
3838 California StThe Boldt Companyrev 202510107235: deferred submittal: frp slab strengthening at vents and penetrations.
Details
Permit
202512101381
Permit issued
Jun 8, 2026
Final sign-off
Jun 16, 2026

rev 202510107235: deferred submittal: frp slab strengthening at vents and penetrations.

Open the permit page

$25,000
Dec 22, 2025In progress
issued Jan 2026
3501 Cesar Chavez StThe Boldt Companyerection of tower crane model liehberr 550 ec-h litronic. reference to new building site permit application #202004277259s.
Details
Permit
202512091280
Permit issued
Jan 30, 2026

erection of tower crane model liehberr 550 ec-h litronic. reference to new building site permit application #202004277259s.

Open the permit page

$150,000
Oct 10, 2025Completed
final sign-off Apr 2026
3838 California StThe Boldt Company1st flr; revision to pa: 202501228783. changes include added mri chiller + enclosure, add bench in level 1 public lobby + misc changes based on existing site conditions.
Details
Permit
202510107235
Permit issued
Dec 3, 2025
Final sign-off
Apr 15, 2026

1st flr; revision to pa: 202501228783. changes include added mri chiller + enclosure, add bench in level 1 public lobby + misc changes based on existing site conditions.

Open the permit page

$18,000
May 28, 2025Completed
final sign-off Apr 2026
3838 California StThe Boldt Companyrevision to pa#202409100433.revisions include: added exhaust for the nitrogen tank on level 3.added afan coil unit for the processing lab on level 4. level 3 lobby - install new finishes, new ceiling, and lighting.
Details
Permit
202505287408
Permit issued
Aug 14, 2025
Final sign-off
Apr 2, 2026

revision to pa#202409100433.revisions include: added exhaust for the nitrogen tank on level 3.added afan coil unit for the processing lab on level 4. level 3 lobby - install new finishes, new ceiling, and lighting.

Open the permit page

$10,000
May 20, 2025In progress
issued Jul 2025
1580 Valencia StThe Boldt Companyrevision to pa# 202411124847, revised north exit second flr structure to new sloped concrete slab without parapets to received hot rubberized asphalt roofing; revised below grade waterproofing for exterior wall at areas indicated. other scope revision are interior shotcrete wall reduction, new concr
Details
Permit
202505206879
Permit issued
Jul 30, 2025

revision to pa# 202411124847, revised north exit second flr structure to new sloped concrete slab without parapets to received hot rubberized asphalt roofing; revised below grade waterproofing for exterior wall at areas indicated. other scope revision are interior shotcrete wall reduction, new concr

Open the permit page

Apr 11, 2025Completed
final sign-off Apr 2026
3838 California StThe Boldt Company4/fl- revision 202409100433- due to field conditions add fsd to mechanical shafts on 4th floor and update shaft routing
Details
Permit
202504114244
Permit issued
Apr 23, 2025
Final sign-off
Apr 2, 2026

4/fl- revision 202409100433- due to field conditions add fsd to mechanical shafts on 4th floor and update shaft routing

Open the permit page

$10,000
Mar 10, 2025Completed
final sign-off Apr 2026
3838 California StThe Boldt Companyrenovation for imaging department on a portion of the 1st fl. work includes ti with interior non structural partitions, ceilings, casework, equipment & mep. selective demo under a separate permit.
Details
Permit
202501228783
Permit issued
Jul 25, 2025
Final sign-off
Apr 15, 2026

renovation for imaging department on a portion of the 1st fl. work includes ti with interior non structural partitions, ceilings, casework, equipment & mep. selective demo under a separate permit.

Open the permit page

$7,000,000
Dec 23, 2024Expired or cancelled
expired Apr 2026
3838 California StThe Boldt Companysuite #102 and #104: soft demo per ab-017. the demolition to include the removal of interior non-structural partitions, flooring,doors, casework and equipment. existing ceiling to remain.
Details
Permit
202412237339
Permit issued
Jan 8, 2025

suite #102 and #104: soft demo per ab-017. the demolition to include the removal of interior non-structural partitions, flooring,doors, casework and equipment. existing ceiling to remain.

Open the permit page

$20,000
Nov 13, 2024Completed
final sign-off Dec 2024
2333 Buchanan StThe Boldt Companyto obtain final inspection for work approved under pa# 202007109986. all work is complete.
Details
Permit
202411134951
Permit issued
Nov 21, 2024
Final sign-off
Dec 3, 2024

to obtain final inspection for work approved under pa# 202007109986. all work is complete.

Open the permit page

Nov 12, 2024In progress
issued Mar 2025
1580 Valencia StThe Boldt Companya make ready scope of re-routing the egress path of existing 1957 building to discharge to second floor lobby for north exit and partial demolition of second floor of existing 1957 lobby.
Details
Permit
202411124847
Permit issued
Mar 5, 2025

a make ready scope of re-routing the egress path of existing 1957 building to discharge to second floor lobby for north exit and partial demolition of second floor of existing 1957 lobby.

Open the permit page

$250,000
Sep 10, 2024Completed
final sign-off Apr 2026
3838 California StThe Boldt Companyrenovation on e) medical office: primary care clinic on 3rd/f, a new medical lab on a portion of 4th/f. work included non structural partitions, ceilings, casework, equipment, & mep
Details
Permit
202409100433
Permit issued
Dec 17, 2024
Final sign-off
Apr 2, 2026

renovation on e) medical office: primary care clinic on 3rd/f, a new medical lab on a portion of 4th/f. work included non structural partitions, ceilings, casework, equipment, & mep

Open the permit page

$1,200,000
May 21, 2024Completed
final sign-off Mar 2025
3838 California StThe Boldt Companyfl 3 and 4: soft demo per ab-017. the demo to include the removal of interior non-structural partitions, flooring, doors, casment, and equipment. exisiting ceiling to remain. (demo at areas per plan)
Details
Permit
202405212631
Permit issued
Jun 13, 2024
Final sign-off
Mar 13, 2025

fl 3 and 4: soft demo per ab-017. the demo to include the removal of interior non-structural partitions, flooring, doors, casment, and equipment. exisiting ceiling to remain. (demo at areas per plan)

Open the permit page

$60,000
Apr 26, 2022Completed
final sign-off Jul 2023
3838 California StThe Boldt Companyste 805: demo of (e) medical space including non-structural partitions, ceilings, doors, floors, casework, & electrical, mechanical systems serving demolished rooms.no ceiling work. ab017
Details
Permit
202204263046
Permit issued
May 12, 2022
Final sign-off
Jul 27, 2023

ste 805: demo of (e) medical space including non-structural partitions, ceilings, doors, floors, casework, & electrical, mechanical systems serving demolished rooms.no ceiling work. ab017

Open the permit page

$50,000
Dec 2, 2021Completed
final sign-off Mar 2022
1580 Valencia StThe Boldt Companysuite #801:minor remodel of an existing medical.remove non-structual wall to combine 2 existing exam room into 1.
Details
Permit
202112023574
Permit issued
Jan 4, 2022
Final sign-off
Mar 30, 2022

suite #801:minor remodel of an existing medical.remove non-structual wall to combine 2 existing exam room into 1.

Open the permit page

$156,000
Jun 30, 2021Never finaled
issued Sep 2021, no final
3838 California StThe Boldt Companyste 805: remodel of (e) medical office suite within an 8 stories building above grade
Details
Permit
202106303538
Permit issued
Sep 16, 2021

ste 805: remodel of (e) medical office suite within an 8 stories building above grade

Open the permit page

$450,000
Jan 26, 2021Completed
final sign-off Jan 2022
1100 Van Ness AvThe Boldt Companythis project consists of adding (2) dc fast charging stations and electrical panel at garage level g2
Details
Permit
202101263327
Permit issued
Apr 6, 2021
Final sign-off
Jan 5, 2022

this project consists of adding (2) dc fast charging stations and electrical panel at garage level g2

Open the permit page

$13,400
Aug 12, 2020Completed
final sign-off Mar 2023
3555 Cesar Chavez StThe Boldt Companyinstallation of subsurgace sanitary sewer and portable water tanks, temporary tree farm and interim parking.
Details
Permit
202008121631
Permit issued
Jun 22, 2021
Final sign-off
Mar 30, 2023

installation of subsurgace sanitary sewer and portable water tanks, temporary tree farm and interim parking.

Open the permit page

$200,000
Apr 27, 2020Never finaled
issued Nov 2023, no final
3501 Cesar Chavez StThe Boldt Companyerect a five story type ib construction building with medical office, retail, amnd parking on 4 below ground levels.
Details
Permit
202004277259
Permit issued
Nov 16, 2023

erect a five story type ib construction building with medical office, retail, amnd parking on 4 below ground levels.

Open the permit page

$27,500,000