Gordon Pak Kei Wong
- Listed as
- engineer
- On San Francisco permits
- Sep 2022 to Jul 2026
6 permits since 2000 (engineer on 6 permits): 3 completed, 3 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 27, 2026 | In progress issued Sep 2026 | 601 Duboce Av | Jkl Construction Services Inc. | voluntary barrier removal campus improvement, roadway resurfacing, site regrading and signage modiifcations, providing ada compliant access between the medical bldgs and parking garage. reloate/ reinstall an (e) pay station with an install of new canopy outside of the parking garage, minor modificatDetails
voluntary barrier removal campus improvement, roadway resurfacing, site regrading and signage modiifcations, providing ada compliant access between the medical bldgs and parking garage. reloate/ reinstall an (e) pay station with an install of new canopy outside of the parking garage, minor modificat | $80,000 |
| Dec 30, 2025 | In progress issued Mar 2026 | 746 Natoma St | Ward-Tek Inc. | 746-746a natoma st: in-kind repairs to warehouse due to fire, with ada upgrades. to comply with nov#202540188.Details
746-746a natoma st: in-kind repairs to warehouse due to fire, with ada upgrades. to comply with nov#202540188. | $350,000 |
| Mar 14, 2025 | Completed final sign-off May 2026 | 157 West Portal Av | Ibuild Construction & Renovations Inc | fire repairs to first and 2nd levels, in-kind.Details
fire repairs to first and 2nd levels, in-kind. | $491,000 |
| Oct 12, 2023 | In progress filed Oct 2023, not yet issued | 45 Castro St | selective demo in suites 220,212, and 207 to accomdate the proposed tenant improvements. converting (e) consult room and (e) offices in suite 220 to 3 exam rooms, 1 exam/treatment room. remodel (e) suite 212 to 5 neuropsych offices, and admin. modify (e) hvac, plumbing, and electrial systems.Details
selective demo in suites 220,212, and 207 to accomdate the proposed tenant improvements. converting (e) consult room and (e) offices in suite 220 to 3 exam rooms, 1 exam/treatment room. remodel (e) suite 212 to 5 neuropsych offices, and admin. modify (e) hvac, plumbing, and electrial systems. | $900,000 | |
| May 8, 2023 | Completed final sign-off May 2025 | 2238 Geary Bl | Kaiser Foundation Health Plan Inc | room 3w264: replacement of mammogram equip/expansion; room 3w408: modification of accessories w/in the accessible patient toilet on 3/f; architectural/structural/mechanical/plumbing/electrical/finishesDetails
room 3w264: replacement of mammogram equip/expansion; room 3w408: modification of accessories w/in the accessible patient toilet on 3/f; architectural/structural/mechanical/plumbing/electrical/finishes | $300,000 |
| Sep 30, 2022 | Completed final sign-off Feb 2025 | 2820 16th St | Amone Corp | new t.i. build out offices in existing warm shell space. work includes new offices, open meeting rooms and kitchenete area. existing space has approved ada restrooms and hvac.Details
new t.i. build out offices in existing warm shell space. work includes new offices, open meeting rooms and kitchenete area. existing space has approved ada restrooms and hvac. | $264,600 |