Russel Edward Carrel
- Listed as
- authorized agent-others, contractor
- Firm
- R C Construction
- Based in
- West Sacramento
- On San Francisco permits
- Sep 2012 to Dec 2025
25 permits since 2000 (contractor on 25 permits, authorized agent-others on 1 permit): 14 completed, 4 in progress, 5 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 5, 2025 | In progress issued Dec 2025 | 236 Laussat St | R C Construction | unit #236: bathroom remodel in kind. no changes to walls or openings. (n) tub/shower, vanity, toilet. all (n) light switches. upgrade main panel to 400amp.Details
unit #236: bathroom remodel in kind. no changes to walls or openings. (n) tub/shower, vanity, toilet. all (n) light switches. upgrade main panel to 400amp. | $29,000 |
| Nov 10, 2025 | In progress issued Jan 2026 | 83 Fair Oaks St | R C Construction | unit 91; revision to bpa#: 202506058062. unit 91. convert existing conditioned storage to a media room/office.Details
unit 91; revision to bpa#: 202506058062. unit 91. convert existing conditioned storage to a media room/office. | $500 |
| Jun 5, 2025 | In progress issued Jul 2025 | 83 Fair Oaks St | R C Construction | remodel (6) bathrooms: (2) in unit 91, (2) in unit 83, (2) in unit 87. no structural work. new toilets, vanities and showers. all new fixtures and finishes. remodel (1) kitchen in unit 91 in-kind. no change to walls or openings.Details
remodel (6) bathrooms: (2) in unit 91, (2) in unit 83, (2) in unit 87. no structural work. new toilets, vanities and showers. all new fixtures and finishes. remodel (1) kitchen in unit 91 in-kind. no change to walls or openings. | $120,000 |
| Mar 4, 2025 | In progress issued Jul 2026 | 83 Fair Oaks St | R C Construction | replace 58 windows in-kind. 18 at front, 35 between north nd south, and 5 on back. no change to openings. no structural. replace in kindDetails
replace 58 windows in-kind. 18 at front, 35 between north nd south, and 5 on back. no change to openings. no structural. replace in kind | $70,000 |
| Aug 9, 2024 | Completed final sign-off Feb 2026 | 593 Banks St | R C Construction | retain (e) foundation & concrete slab & add (n) short cross wall foundation @ (n) garage door grade beam & 2 (n) shear wall. above (e) garage utility rm & middle bedrm add 2nd story include (n) stair to 2nd story, 2 bedrms,1 bath & 2 decks.covert gas to electrical: ev charger, cooktop,hp hvac.Details
retain (e) foundation & concrete slab & add (n) short cross wall foundation @ (n) garage door grade beam & 2 (n) shear wall. above (e) garage utility rm & middle bedrm add 2nd story include (n) stair to 2nd story, 2 bedrms,1 bath & 2 decks.covert gas to electrical: ev charger, cooktop,hp hvac. | $200,000 |
| Aug 2, 2023 | Completed final sign-off Nov 2023 | 2858 22nd St | R C Construction | dry rot repair on 2nd floor porch @ rear - less than 50%. (n) ledger board, floor, and stair treads. not visible from street.Details
dry rot repair on 2nd floor porch @ rear - less than 50%. (n) ledger board, floor, and stair treads. not visible from street. | $5,000 |
| Dec 20, 2022 | Completed final sign-off Nov 2023 | 2858 22nd St | Gracon Construction Inc, R C Construction | revison to pa# 2022-0615-6358, add n piers, posts & headers at gridlines 4-7.Details
revison to pa# 2022-0615-6358, add n piers, posts & headers at gridlines 4-7. | $5,000 |
| Jun 15, 2022 | Completed final sign-off Nov 2023 | 2858 22nd St | Gracon Construction Inc, R C Construction | interior remodel of 2 story sfr expand into lower level garage/storage space to increase habitable space by 1,105 sqft add (3) new bedrooms + bathroom add (n) laundry room.Details
interior remodel of 2 story sfr expand into lower level garage/storage space to increase habitable space by 1,105 sqft add (3) new bedrooms + bathroom add (n) laundry room. | $160,000 |
| Jun 17, 2019 | Never finaled issued Jun 2019, no final | 277 32nd Av | R C Construction | revision to 201712156590 change to front stair layout, move back 4 ftDetails
revision to 201712156590 change to front stair layout, move back 4 ft | |
| Jun 19, 2018 | Completed final sign-off Jun 2018 | 32 Terra Vista Av | R C Construction | to obtain final inspection for work approved under pa# 201512145053. all work is complete.Details
to obtain final inspection for work approved under pa# 201512145053. all work is complete. | |
| May 31, 2018 | Never finaled issued Jun 2018, no final | 277 32nd Av | R C Construction | revision to pa # 201712156590. add a master bath downstairs and upgrade foundation in back of house.Details
revision to pa # 201712156590. add a master bath downstairs and upgrade foundation in back of house. | $25,000 |
| Dec 15, 2017 | Never finaled issued Feb 2018, no final | 277 32nd Av | R C Construction | kitchen & bath remodel, open dining room to hall all on upper floor. bedroom and bath remodel on lower floor. replace exterior rear yard stairs.Details
kitchen & bath remodel, open dining room to hall all on upper floor. bedroom and bath remodel on lower floor. replace exterior rear yard stairs. | $125,000 |
| Jul 8, 2016 | Completed final sign-off Jul 2016 | 2215 Judah St | International Commercial Awning, Inc., R C Construction | renew for final 200705232119. all work is complete.Details
renew for final 200705232119. all work is complete. | |
| Dec 14, 2015 | Expired or cancelled expired Jun 2018 | 32 Terra Vista Av | R C Construction | unit #2: move kitchen to dinning room open consept. remodel bathroom as is. turn old kitchen into bedroom. move window in the bedroom and reframe wall add closet.Details
unit #2: move kitchen to dinning room open consept. remodel bathroom as is. turn old kitchen into bedroom. move window in the bedroom and reframe wall add closet. | $40,000 |
| Nov 16, 2015 | Expired or cancelled cancelled Jan 2020 | 32 Terra Vista Av | R C Construction | unti #1 - new redwood deck extention from 240 sf to 471 sf.Details
unti #1 - new redwood deck extention from 240 sf to 471 sf. | $5,200 |
| Nov 16, 2015 | Completed final sign-off Mar 2017 | 32 Terra Vista Av | R C Construction | unti #3 - new redwood roof deck, 220 sf. replace existing with new. no added sq. ft.Details
unti #3 - new redwood roof deck, 220 sf. replace existing with new. no added sq. ft. | $4,800 |
| Nov 16, 2015 | Completed final sign-off Aug 2016 | 32 Terra Vista Av | R C Construction | unti #2 - new redwood roof deck 220 sf. no added square footage.Details
unti #2 - new redwood roof deck 220 sf. no added square footage. | $4,600 |
| Nov 9, 2015 | Completed final sign-off Aug 2016 | 2215 Judah St | R C Construction | add automatic ada door opener. revision to app#201305247870Details
add automatic ada door opener. revision to app#201305247870 | $3,000 |
| Jul 31, 2015 | Completed final sign-off Mar 2017 | 32 Terra Vista Av | R C Construction | common area- revise pa#201503171134, revise guard and structural revisionDetails
common area- revise pa#201503171134, revise guard and structural revision | |
| Jul 9, 2015 | Never finaled issued Aug 2015, no final | 32 Terra Vista Av | R C Construction | rev. to 201504294958 -adding plans for roof decks for top unit.Details
rev. to 201504294958 -adding plans for roof decks for top unit. | $20,000 |
| Apr 29, 2015 | Completed final sign-off Jun 2015 | 32 Terra Vista Av | R C Construction | unit #1 - move washer/dryer to first floor from garage into a closet in hallway / new countertop in kitchen. replace 7 wood sash at front with new wood sash within existing openings. replace dryrot (2) roof deck with like.Details
unit #1 - move washer/dryer to first floor from garage into a closet in hallway / new countertop in kitchen. replace 7 wood sash at front with new wood sash within existing openings. replace dryrot (2) roof deck with like. | $20,000 |
| Mar 17, 2015 | Completed final sign-off Mar 2017 | 32 Terra Vista Av | R C Construction | dry-rot repair at cantilevered entry porches, including replacement/reinforcement of rotted joists and railings.Details
dry-rot repair at cantilevered entry porches, including replacement/reinforcement of rotted joists and railings. | $15,000 |
| Feb 24, 2015 | Never finaled issued Feb 2015, no final | 401 Hill St | R C Construction | replace post on back sunporch off kitchen.Details
replace post on back sunporch off kitchen. | $200 |
| May 24, 2013 | Completed final sign-off Aug 2016 | 2215 Judah St | R C Construction | to comply with nov 201302191. replace broken frnt door with store front doorDetails
to comply with nov 201302191. replace broken frnt door with store front door | $1,200 |
| Sep 12, 2012 | Completed final sign-off Dec 2012 | 1449 Lincoln Wy | R C Construction | obtain final inspection for work approved under pa# 2009-0819-5142. all work is completeDetails
obtain final inspection for work approved under pa# 2009-0819-5142. all work is complete |