Mike Griffith
- Listed as
- authorized agent-others, contractor
- Firm
- Magnolia Development Inc.
- Based in
- Berkeley
- On San Francisco permits
- Jul 2011 to Sep 2026
43 permits since 2000 (contractor on 43 permits, authorized agent-others on 1 permit): 38 completed, 1 in progress, 3 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. Their ranked record as a contractor is on their contractor page. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Parkin Construction Inc (2), Shoshan Construction Services (2), Doorman Property Management
- Architects
- Stanley Teng (6), Bassel Edward Samaha (3), Harvey J Hacker, Heather Hart
- Engineers
- Donald David (4), Lawrence Chambers (2), Lawrence Wong, M.L. Hicks, Pattrick Vennari
- Authorized agents
- Harvey Hacker, Heather Hart, John Lau
- Designers
- Paul Okamoto
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 28, 2026 | In progress issued Sep 2026 | 38 Idora Av | Magnolia Development Inc. | 2 | $150,000 |
| May 4, 2026 | Completed final sign-off Jun 2026 | 95 Minna St | Magnolia Development Inc. | revision to permits 202508012132, and 202311080438. add extra steel beam and post to west end of steel structure to reinforce accordingly. (see grid line 9, a)Details
revision to permits 202508012132, and 202311080438. add extra steel beam and post to west end of steel structure to reinforce accordingly. (see grid line 9, a) | $3,000 |
| Aug 1, 2025 | Completed final sign-off Jun 2026 | 95 Minna St | Magnolia Development Inc. | minor structural detail revision prior to start of construction per previously pa 202311080438Details
minor structural detail revision prior to start of construction per previously pa 202311080438 | |
| Nov 8, 2023 | Completed final sign-off Jun 2026 | 95 Minna St | Magnolia Development Inc. | to comply with nov # 202295967. structural repairs to sub-sidewalk basement. remove and replace existing concrete sidewalk and waterproofing.Details
to comply with nov # 202295967. structural repairs to sub-sidewalk basement. remove and replace existing concrete sidewalk and waterproofing. | $100,000 |
| Nov 7, 2023 | Completed final sign-off Oct 2024 | 1352 45th Av | Magnolia Development Inc. | revision to pa: 202206176628, as requested by dbi field inspector. revision for steel beam, lower sub-floor at l2 bath, dowls at existing footing, raised header vent discharge, stairway repair, delete 2 rear deck from project. relocate north parapetDetails
revision to pa: 202206176628, as requested by dbi field inspector. revision for steel beam, lower sub-floor at l2 bath, dowls at existing footing, raised header vent discharge, stairway repair, delete 2 rear deck from project. relocate north parapet | |
| Aug 7, 2023 | Never finaled issued Aug 2023, no final | 280 Lily St | Magnolia Development Inc. | scaffolding (20' x 3 x 20') | $12,000 |
| Apr 17, 2023 | Completed final sign-off Oct 2024 | 1352 45th Av | Shoshan Construction Services, Magnolia Development Inc. | facade alteration removed from pa# 2022-0617-6628, historical resource assessment.Details
facade alteration removed from pa# 2022-0617-6628, historical resource assessment. | |
| Apr 6, 2023 | Completed final sign-off Dec 2023 | 237 Grattan St | Magnolia Development Inc. | add bathroom to upper floor master bedroom. remove e fireplace, add closetDetails
add bathroom to upper floor master bedroom. remove e fireplace, add closet | $20,000 |
| Dec 14, 2022 | Completed final sign-off Aug 2023 | 40 De Soto St | Magnolia Development Inc. | down to the stair remodel of the (e) kitchen and family room. included in the remodel are new windows and doors @ the rear facing elevation (yard)Details
down to the stair remodel of the (e) kitchen and family room. included in the remodel are new windows and doors @ the rear facing elevation (yard) | $75,000 |
| Jun 17, 2022 | Completed final sign-off Oct 2024 | 1352 45th Av | Shoshan Construction Services, Magnolia Development Inc. | voluntary structural strengthening. partial tunnel infill legalize extg level 1 bath & bedroom. kitchen remodel. level 2 bath remodel. rear only -new window, new siding, new skylight, new solar pv & thermal.Details
voluntary structural strengthening. partial tunnel infill legalize extg level 1 bath & bedroom. kitchen remodel. level 2 bath remodel. rear only -new window, new siding, new skylight, new solar pv & thermal. | $360,000 |
| Apr 22, 2022 | Completed final sign-off Mar 2024 | 904 22nd St | Magnolia Development Inc., Parkin Construction Inc | construction phase change to work underway per bpa#201907105517. disabled acess workDetails
construction phase change to work underway per bpa#201907105517. disabled acess work | $6,000 |
| Jun 8, 2021 | Completed final sign-off Apr 2022 | 478 47th Av | Magnolia Development Inc. | this project includes an addition within the extg ground level, including a master bedroom, master bathroom, family room and laundry alcove off the extg stairs and hallway. extg one car garage will remain, as well as the extg stairs from the main living level.Details
this project includes an addition within the extg ground level, including a master bedroom, master bathroom, family room and laundry alcove off the extg stairs and hallway. extg one car garage will remain, as well as the extg stairs from the main living level. | $180,000 |
| Jun 7, 2021 | Completed final sign-off Dec 2021 | 695 Wisconsin St | Magnolia Development Inc. | kitchen remodel on 1st fl. replace patio door to french doors at rear. replace 2 window at rear. enlarge non-loading bearing opening to dining rm. no loading bearing alter. bathroom remodel on 1st fl.Details
kitchen remodel on 1st fl. replace patio door to french doors at rear. replace 2 window at rear. enlarge non-loading bearing opening to dining rm. no loading bearing alter. bathroom remodel on 1st fl. | $50,000 |
| Dec 16, 2020 | Completed final sign-off Aug 2021 | 14 Wilmot St | Magnolia Development Inc. | replacement of (e) retaining wall & fence with (n) retaining wall & fence.Details
replacement of (e) retaining wall & fence with (n) retaining wall & fence. | $10,000 |
| Jul 10, 2019 | Completed final sign-off Mar 2024 | 904 22nd St | Magnolia Development Inc., Parkin Construction Inc | replacement in kind & repair of wood storefront. replace two wood doors with glazed doors. remove metal security screens. relace entire bank of window to duplicate existing.Details
replacement in kind & repair of wood storefront. replace two wood doors with glazed doors. remove metal security screens. relace entire bank of window to duplicate existing. | $20,000 |
| Nov 16, 2018 | Completed final sign-off Nov 2018 | 201 College Av | Magnolia Development Inc. | revision to 201411212287 revise hvac system to radiant heatingDetails
revision to 201411212287 revise hvac system to radiant heating | |
| Jun 28, 2018 | Completed final sign-off Jan 2019 | 1492 Pacific Av | Magnolia Development Inc. | revision to pa #201607212957, revision to shearwall layout and structural details.Details
revision to pa #201607212957, revision to shearwall layout and structural details. | |
| Feb 8, 2018 | Completed final sign-off Apr 2021 | 85 Parker Av | Magnolia Development Inc. | horizontal addition @ rear yard addition & interiror remodel, remove and replace rear yard deck & staris, new windows & plaster siding. bathroom & powder rm remodeled & bath added, relocate laundryDetails
horizontal addition @ rear yard addition & interiror remodel, remove and replace rear yard deck & staris, new windows & plaster siding. bathroom & powder rm remodeled & bath added, relocate laundry | $275,000 |
| Feb 8, 2018 | Completed final sign-off May 2021 | 85 Parker Av | Magnolia Development Inc. | convert the existing 368 square foot freestanding garage at the rear yard to become habitable space & become a library with a half bath. accessory to the main house.Details
convert the existing 368 square foot freestanding garage at the rear yard to become habitable space & become a library with a half bath. accessory to the main house. | $100,000 |
| Nov 6, 2017 | Completed final sign-off Sep 2020 | 646 03rd Av | Magnolia Development Inc. | horizontal addition @ rear yard of 1-fam dwelling. addition includes excavation at lvl 1 to create a family rm, new bath, laundry & rear yard patio. a new interior stair connects 1st & 2nd lvls. lvl 2 includes a remodeled kitchen & powder rm, new deck & interior stairs to rear yard. lvl 3 includes aDetails
horizontal addition @ rear yard of 1-fam dwelling. addition includes excavation at lvl 1 to create a family rm, new bath, laundry & rear yard patio. a new interior stair connects 1st & 2nd lvls. lvl 2 includes a remodeled kitchen & powder rm, new deck & interior stairs to rear yard. lvl 3 includes a | $250,000 |
| Oct 3, 2017 | Completed final sign-off Nov 2017 | 10 28th St | Magnolia Development Inc. | re-do bathroom: new fixtures, tiles and new paintDetails
re-do bathroom: new fixtures, tiles and new paint | $5,000 |
| Aug 21, 2017 | Completed final sign-off Mar 2019 | 333 Greenwich St | Magnolia Development Inc. | compliance w/ mandatory soft story retrofit program, 2016 cebc appendix a-4.Details
compliance w/ mandatory soft story retrofit program, 2016 cebc appendix a-4. | $10,000 |
| Jul 10, 2017 | Completed final sign-off Oct 2017 | 1339 Waller St | Magnolia Development Inc. | remodel bathroom: replace fixtures, new tileDetails
remodel bathroom: replace fixtures, new tile | $10,000 |
| Mar 24, 2017 | Completed final sign-off May 2017 | 7 Laurel St | Magnolia Development Inc. | bathroom remodel - replace toilet, sink, shower tileDetails
bathroom remodel - replace toilet, sink, shower tile | $5,000 |
| Aug 15, 2016 | Completed final sign-off May 2017 | 1000 Fulton St | Magnolia Development Inc. | basement & 1st fl: revision to permit 2013-0403-3731; slightly different configuration to floor plan of bathroom, bedrooms.Details
basement & 1st fl: revision to permit 2013-0403-3731; slightly different configuration to floor plan of bathroom, bedrooms. | $25,000 |
| Jul 21, 2016 | Completed final sign-off Jan 2019 | 1492 Pacific Av | Magnolia Development Inc. | compliance with mandatory soft story retrofit program, 2012 iebc appendix a-4Details
compliance with mandatory soft story retrofit program, 2012 iebc appendix a-4 | $40,000 |
| Jan 22, 2016 | Completed final sign-off Jul 2016 | 3409 Pacific Av | Magnolia Development Inc. | new structural work to garage area, steel, concrete. add bath, reincorporate old staircase, move laundry from upstairs, renovateDetails
new structural work to garage area, steel, concrete. add bath, reincorporate old staircase, move laundry from upstairs, renovate | $160,000 |
| Jan 7, 2016 | Completed final sign-off Apr 2016 | 2107 14th Av | Magnolia Development Inc. | kitchen remodel: move sink, new lights, plugs, and new cabinets, etcDetails
kitchen remodel: move sink, new lights, plugs, and new cabinets, etc | $20,000 |
| Sep 8, 2015 | Completed final sign-off Dec 2015 | 705 Columbus Av | Magnolia Development Inc. | grnd flr: refinish small store - no change in use. new: plumb fixtures/lighting/elect outlets etc/wallboard, patch, paintDetails
grnd flr: refinish small store - no change in use. new: plumb fixtures/lighting/elect outlets etc/wallboard, patch, paint | $25,000 |
| Apr 17, 2015 | Completed final sign-off Aug 2015 | 10 28th St | Magnolia Development Inc. | relocate w/d. cosmetic upgrade to kitchen,all fixtures same location, no walls movedDetails
relocate w/d. cosmetic upgrade to kitchen,all fixtures same location, no walls moved | $20,000 |
| Mar 10, 2015 | Completed final sign-off Jun 2015 | 132 Fillmore St | Magnolia Development Inc. | new configuration to kitchen, master closet, laundry & pantry. enlarge (e) window - not visible from street.Details
new configuration to kitchen, master closet, laundry & pantry. enlarge (e) window - not visible from street. | $40,000 |
| Feb 27, 2015 | Never finaled issued Feb 2015, no final | 765 Mangels Av | Magnolia Development Inc. | replace retaining wall to comply with nov# 201311341Details
replace retaining wall to comply with nov# 201311341 | $1,000 |
| Feb 17, 2015 | Completed final sign-off Nov 2015 | 1928 Mcallister St | Magnolia Development Inc. | interior alteration to existing family room at gr fl level. modify existing bath and laundry area. voluntary seismic improvements at gr flDetails
interior alteration to existing family room at gr fl level. modify existing bath and laundry area. voluntary seismic improvements at gr fl | $150,000 |
| Nov 21, 2014 | Completed final sign-off Nov 2018 | 201 College Av | Magnolia Development Inc. | (n) fully sprinklered system for building. addition of approx 440 sq ft to (e) house. addition will create an additional story to the house. the (e) house will be remodeled to match it w/ the (n) addition; the stair is also being relocated to maximize the usage of the house.Details
(n) fully sprinklered system for building. addition of approx 440 sq ft to (e) house. addition will create an additional story to the house. the (e) house will be remodeled to match it w/ the (n) addition; the stair is also being relocated to maximize the usage of the house. | $300,000 |
| Aug 29, 2014 | Completed final sign-off Jul 2016 | 3409 Pacific Av | Magnolia Development Inc. | new steel moment frame at garage doorDetails
new steel moment frame at garage door | $40,000 |
| Jun 13, 2014 | Never finaled issued Oct 2016, no final | 1000 Fulton St | Magnolia Development Inc. | installation of roof maintenance walkway on north side of roof with minimum required safety height for railing, accessed by (e) fire escape on east facade, per coa case no. 2013.0490aDetails
installation of roof maintenance walkway on north side of roof with minimum required safety height for railing, accessed by (e) fire escape on east facade, per coa case no. 2013.0490a | $50,000 |
| Apr 3, 2013 | Completed final sign-off May 2017 | 1000 Fulton St | Doorman Property Management, Magnolia Development Inc. | reconf(e)15 rm guest hotel&1 mgr unit to create 4 add'l hotel rms total 19 rms&1 mgr unit.remodel(e)toilet at guest rm 2. provide(n)accessible guest rm.provide primary entrance ramp,(n)common area toilet. rm#6,8&9 remodel toilet & bath. guest rm #10 provide (n) bath. rm#11 remodel bath.Details
reconf(e)15 rm guest hotel&1 mgr unit to create 4 add'l hotel rms total 19 rms&1 mgr unit.remodel(e)toilet at guest rm 2. provide(n)accessible guest rm.provide primary entrance ramp,(n)common area toilet. rm#6,8&9 remodel toilet & bath. guest rm #10 provide (n) bath. rm#11 remodel bath. | $130,000 |
| Feb 7, 2012 | Completed final sign-off Jul 2012 | 2244 Mason St | Magnolia Development Inc. | repair back stairs less than 50%, not visable from street.Details
repair back stairs less than 50%, not visable from street. | $3,000 |
| Aug 16, 2011 | Expired or cancelled withdrawn Dec 2011 | 2244 Mason St | Magnolia Development Inc. | horizontal extension. this is to revise pa #2008-0522-2728 & 2011-0811-2280 to remove mechanical parking lift and to extend ground floor garage to the rear property line with new parking arrangement.Details
horizontal extension. this is to revise pa #2008-0522-2728 & 2011-0811-2280 to remove mechanical parking lift and to extend ground floor garage to the rear property line with new parking arrangement. | $50,000 |
| Aug 11, 2011 | Completed final sign-off Sep 2012 | 2244 Mason St | Magnolia Development Inc. | revision to pa #2008-0522-2728 to remove one mechanical parking lift and to revise the 1st floor structure plan and foundation plan. no exterior work. maintain 6 parking space. relocate water heater.Details
revision to pa #2008-0522-2728 to remove one mechanical parking lift and to revise the 1st floor structure plan and foundation plan. no exterior work. maintain 6 parking space. relocate water heater. | $2,000 |
| Jul 29, 2011 | Completed final sign-off Aug 2012 | 2248 Mason St | Magnolia Development Inc. | to complete work and obtain final inspection for work approved under pa 200809192164Details
to complete work and obtain final inspection for work approved under pa 200809192164 | $100,000 |
| Jul 29, 2011 | Completed final sign-off Aug 2012 | 2244 Mason St | Magnolia Development Inc. | to complete work and obtain final inspection for work approved under pa 200809242527Details
to complete work and obtain final inspection for work approved under pa 200809242527 | $100,000 |
| Jul 29, 2011 | Completed final sign-off Aug 2012 | 2244 Mason St | Magnolia Development Inc. | to complete work and obtain final inspection for work approved under pa 200809192166Details
to complete work and obtain final inspection for work approved under pa 200809192166 | $100,000 |