Eugene Sakai
- Listed as
- architect, designer, engineer
- Firm
- Studio S Squared Architecture
- Based in
- San Jose
- On San Francisco permits
- Apr 2004 to Feb 2024
25 permits since 2000 (architect on 22 permits, engineer on 2 permits, designer on 1 permit): 16 completed, 2 never finaled, 7 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 21, 2024 | Expired or cancelled withdrawn Jan 2025 | 3076 23rd Av | a ±1,368.50 s.f. vertical & horizontal addition of new living area will result in a 4br & 3ba residence with ±4,622.26 living s.f. with an (e) garage of ±482 s.f. to remain. ground floor will be a 1br 1ba adu & 1br 1ba (main house) on ground floor.Details
a ±1,368.50 s.f. vertical & horizontal addition of new living area will result in a 4br & 3ba residence with ±4,622.26 living s.f. with an (e) garage of ±482 s.f. to remain. ground floor will be a 1br 1ba adu & 1br 1ba (main house) on ground floor. | $400,000 | |
| Dec 29, 2020 | Expired or cancelled cancelled Nov 2024 | 2775 40th Av | remodel & addition to (e) 3br/2ba sfr w/ (e) 2051.3sf living on 9332.2sf lot w/ a 1470.2 addition of (n) living area will result in a 4br/4.5ba rsident with 3521.5 living sf w/ (e) garage of 297sf to be remodeled. an (e) outbuilding of 339.6sf will be renovated with 8.7sf addition.Details
remodel & addition to (e) 3br/2ba sfr w/ (e) 2051.3sf living on 9332.2sf lot w/ a 1470.2 addition of (n) living area will result in a 4br/4.5ba rsident with 3521.5 living sf w/ (e) garage of 297sf to be remodeled. an (e) outbuilding of 339.6sf will be renovated with 8.7sf addition. | $180,000 | |
| Oct 3, 2019 | Completed final sign-off Oct 2021 | 80 Thor Av | Kohlmyer | revision to previously approved pa# 201704254820-s2, revised escape ladder.Details
revision to previously approved pa# 201704254820-s2, revised escape ladder. | |
| Mar 21, 2019 | Completed final sign-off Apr 2022 | 1783 08th Av | R & D Construction Co Inc | remove (e) non-permitted rear ext. stair. add 61.6 living area on (3) flrs each. add stair penthouse & roof deck for 1785 (unit 2). (n) kitchen & (n) bath for 1783 (unit 1).Details
remove (e) non-permitted rear ext. stair. add 61.6 living area on (3) flrs each. add stair penthouse & roof deck for 1785 (unit 2). (n) kitchen & (n) bath for 1783 (unit 1). | $50,000 |
| May 17, 2017 | Expired or cancelled withdrawn Jan 2018 | 183 Bocana St | M F Construction | horizontal addition. remodel & addition of an (e) 4 bedroom, 1 bath sfr with 1305.2 9e) living sq.ft. on 2441 sq.ft. lot. 405 sq.ft. of garage area converted to new living area.Details
horizontal addition. remodel & addition of an (e) 4 bedroom, 1 bath sfr with 1305.2 9e) living sq.ft. on 2441 sq.ft. lot. 405 sq.ft. of garage area converted to new living area. | $350,000 |
| Sep 29, 2016 | Completed final sign-off Apr 2019 | 52 Yukon St | M F Construction | addition and remodel of an (e) 2 bed, 1 bath single family residence with 899 sq ft (e) living. (e) garage level 697.5 sq ft on 2304 lot. 1351.5 sq ft addition of new living area.Details
addition and remodel of an (e) 2 bed, 1 bath single family residence with 899 sq ft (e) living. (e) garage level 697.5 sq ft on 2304 lot. 1351.5 sq ft addition of new living area. | $350,000 |
| Aug 22, 2014 | Completed final sign-off Apr 2017 | 23 Peralta Av | E. Grelli Construction, R & D Construction Co Inc | construction of roof deck & master bedroom deck. removal of 3rd fl kitchen, raise dormers in the back of the house to the height of the dormers in the front of the house. addition of master closet & master bath.Details
construction of roof deck & master bedroom deck. removal of 3rd fl kitchen, raise dormers in the back of the house to the height of the dormers in the front of the house. addition of master closet & master bath. | $350,000 |
| Jul 2, 2014 | Completed final sign-off Jan 2015 | 3251 20th Av | W G Fritz Construction Inc. | #156, 157 & 158- landlord impovements, not for occupancy, demising walls, electrical, mechanical, to create spaces for future tenants in suites #156, 157 & 158Details
#156, 157 & 158- landlord impovements, not for occupancy, demising walls, electrical, mechanical, to create spaces for future tenants in suites #156, 157 & 158 | $55,000 |
| Jun 13, 2014 | Expired or cancelled expired Nov 2019 | 225 Holly Park Cr | E. Grelli Construction | vertical & horizontal addition & remodel of an existing 1-story over basement, 2 bedroom/1 bath house of 1642 sq ft usable area. a 2203 sq ft addition will create a single family home with a total of 3672 sq ft usable area & a 3-car garage. the house will have 4 bedroom/ 4.5 bath.Details
vertical & horizontal addition & remodel of an existing 1-story over basement, 2 bedroom/1 bath house of 1642 sq ft usable area. a 2203 sq ft addition will create a single family home with a total of 3672 sq ft usable area & a 3-car garage. the house will have 4 bedroom/ 4.5 bath. | $500,000 |
| May 12, 2014 | Never finaled issued May 2014, no final | 3251 20th Av | W G Fritz Construction Inc. | demolition of interior space. non structural. no structural or fire sprinkler changes to be made, not for occupancy.Details
demolition of interior space. non structural. no structural or fire sprinkler changes to be made, not for occupancy. | $6,000 |
| Apr 15, 2014 | Completed final sign-off Oct 2015 | 142 Bonview St | R & D Construction Co Inc | interior remodel of 2025 sq ft house, no new usable floor area. total 3 bedrooms & 2 -1/2 baths. repair (e) deck less than 50%. installation of structural elements in anticupation of a future vertical addition which is not part of this permit.Details
interior remodel of 2025 sq ft house, no new usable floor area. total 3 bedrooms & 2 -1/2 baths. repair (e) deck less than 50%. installation of structural elements in anticupation of a future vertical addition which is not part of this permit. | $100,000 |
| Mar 3, 2014 | Completed final sign-off Dec 2015 | 2699 15th Av | Pjcon Inc | repair of existing 2 story single family residence due to damage resulting from the flood incident on 2/27/2013. no additional floor area or expansion of building envelope to be part of this permit. work to include partial replacement of foundtn; (visible fr street: replace 4 windows on 1/f; add 2Details
repair of existing 2 story single family residence due to damage resulting from the flood incident on 2/27/2013. no additional floor area or expansion of building envelope to be part of this permit. work to include partial replacement of foundtn; (visible fr street: replace 4 windows on 1/f; add 2 | $300,000 |
| Feb 26, 2013 | Completed final sign-off May 2013 | 3251 20th Av | unit 171 & 172- build demising wall for future tenant between unit 171 & 172, not for occupancy, no structural. sprinklers and t.i. under separate permit.Details
unit 171 & 172- build demising wall for future tenant between unit 171 & 172, not for occupancy, no structural. sprinklers and t.i. under separate permit. | $9,994 | |
| Aug 30, 2012 | Completed final sign-off Apr 2013 | 125 College Av | R & D Construction Co Inc | interior remodel-no expansion of envelope, convert 727 sq ft basement (garage) to living space, relocate kitchen, new bathroom, relocate bathroom. modify lightwell roof above stairwell to achieve min code clearance. lower level remodel 727 sq ft upper level remodel, 382 sq ft. add garage door.Details
interior remodel-no expansion of envelope, convert 727 sq ft basement (garage) to living space, relocate kitchen, new bathroom, relocate bathroom. modify lightwell roof above stairwell to achieve min code clearance. lower level remodel 727 sq ft upper level remodel, 382 sq ft. add garage door. | $50,000 |
| May 24, 2012 | Completed final sign-off Mar 2013 | 148 Bonview St | interior remodel of (e) 3 br/2ba, 1418 s.f. legalize 332 s.f of unwarranted basement space, create br/ba. relocate stair. convert 22 s.f of garage area to living space. remodel kitchen & 2 baths. repair / replace (e) windows & siding in kind. replace roof. 3 (n) skylights, replace (1) existing.Details
interior remodel of (e) 3 br/2ba, 1418 s.f. legalize 332 s.f of unwarranted basement space, create br/ba. relocate stair. convert 22 s.f of garage area to living space. remodel kitchen & 2 baths. repair / replace (e) windows & siding in kind. replace roof. 3 (n) skylights, replace (1) existing. | $50,000 | |
| Aug 17, 2011 | Completed final sign-off Oct 2012 | 2296 Vallejo St | Donny Chu Construction Inc Dba D C Cons | revision to appl #200804079049: elimination of lower level elevator lobby, no new excavation required, eliminate remodel of ground floor unit. retain existing exterior finishes - roofing, guardrails, siding @ bays.Details
revision to appl #200804079049: elimination of lower level elevator lobby, no new excavation required, eliminate remodel of ground floor unit. retain existing exterior finishes - roofing, guardrails, siding @ bays. | |
| Nov 8, 2010 | Completed final sign-off Oct 2011 | 331 Dorantes Av | Pegasus Building/Castle Construction | add 22.5 sq. ft @ upper floor & convert 1129 sq. ft. of basement area to habitable living space. remodel kitchen, add internal stair, and add lower level bathroom.Details
add 22.5 sq. ft @ upper floor & convert 1129 sq. ft. of basement area to habitable living space. remodel kitchen, add internal stair, and add lower level bathroom. | $50,000 |
| Feb 2, 2010 | Completed final sign-off Mar 2011 | 285 Nevada St | C W Wright Construction Co Inc | revision to previously issed permit 200804048895 & 1202774 to replace raised floor @ ground level w/ concrete slab on grade.Details
revision to previously issed permit 200804048895 & 1202774 to replace raised floor @ ground level w/ concrete slab on grade. | |
| Feb 25, 2009 | Expired or cancelled expired Jun 2010 | 2335 Francisco St | C W Wright Construction Co Inc | revision to 200711027171: garage conversion of 66.5 sf of unconditioned area to conditioned habitable area. replacement of (e) windows at 2nd fl/3rd fl dining room. replace (e) carpet in media with tile.Details
revision to 200711027171: garage conversion of 66.5 sf of unconditioned area to conditioned habitable area. replacement of (e) windows at 2nd fl/3rd fl dining room. replace (e) carpet in media with tile. | $5,000 |
| Apr 4, 2008 | Completed final sign-off Mar 2011 | 285 Nevada St | C W Wright Construction Co Inc | renovate (e) ground floor (950 sf), add new 2nd floor (950 sf), add new 3rd floor (520 sf), new exterior finishes and windows.Details
renovate (e) ground floor (950 sf), add new 2nd floor (950 sf), add new 3rd floor (520 sf), new exterior finishes and windows. | $200,000 |
| Nov 2, 2007 | Expired or cancelled expired Jun 2010 | 2335 Francisco St | interior remodel 2 kitchens 5 bathrooms, replace 15 windows, convert first floor room to a media roomDetails
interior remodel 2 kitchens 5 bathrooms, replace 15 windows, convert first floor room to a media room | $200,000 | |
| Feb 10, 2006 | Completed final sign-off Jul 2007 | 255 Moultrie St | rear extension. new dormers.Details
rear extension. new dormers. | $180,000 | |
| Sep 12, 2005 | Never finaled issued Jan 2008, no final | 81 Aztec St | addition interior connecting stairwell. replace (e)exterior fencing. remodel downstair bedroom, bath, media room & study . remodel upstair bathroom. new 252 sq ft and 1st floor 125 sq ft equal 377 sq ft new total.Details
addition interior connecting stairwell. replace (e)exterior fencing. remodel downstair bedroom, bath, media room & study . remodel upstair bathroom. new 252 sq ft and 1st floor 125 sq ft equal 377 sq ft new total. | $90,000 | |
| Jan 20, 2005 | Expired or cancelled expired Aug 2007 | 344 Silliman St | Ming Wah Construction Co. | add 1818 sq.ft. to ex.1140 sq.ft. by developing unfinished 1st floor & add a new 3rd floor of 500 sq.ft. remodel (e) 1140 sq.ft. 2nd floor & new exterior, interior fiishes provide throughout the house.Details
add 1818 sq.ft. to ex.1140 sq.ft. by developing unfinished 1st floor & add a new 3rd floor of 500 sq.ft. remodel (e) 1140 sq.ft. 2nd floor & new exterior, interior fiishes provide throughout the house. | $250,000 |
| Apr 14, 2004 | Completed final sign-off Jul 2006 | 901 Grant Av | convert 1 unit residential to 2 unit residential at 3rd floor only, which include plumbingDetails
convert 1 unit residential to 2 unit residential at 3rd floor only, which include plumbing | $67,000 |