Permit GraphShortlistSan Francisco building permits since 2000

Ervin Rodriguez

License
1022532
Contractor
About the Contractors State License Board
State contractor license record
Listed as
authorized agent-others, contractor
Firm
E & E General Builder Inc
Based in
San Pablo
On San Francisco permits
Jun 2015 to Mar 2026

66 permits since 2000 (contractor on 66 permits, authorized agent-others on 1 permit): 59 completed, 1 in progress, 3 never finaled, 3 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. Their ranked record as a contractor is on their contractor page. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Dimension Construction Inc, Nor-Cal Overhead
Architects
Michael Larkin (6), Ricardo Galdamez (3), Gyo Max Obata (2), Brent Mcdonald, Robert Boles
Engineers
Ricardo Galdamez (7), Alex Santos, K. Mirza Shirvani, Townsend Brown

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Mar 18, 2026In progress
issued Apr 2026
311 Baden StE & E General Builder Inc152 sq ft ground floor addition in rear of residence. convert 146 sq ft of garage to habitable. 81 sq ft 2nd floor addition in rear of residence. (n) 66 sq ft landing and stairs on 1st floor. electrical work in new and remodeled areas.
Details
Permit
202603187794
Permit issued
Apr 20, 2026

152 sq ft ground floor addition in rear of residence. convert 146 sq ft of garage to habitable. 81 sq ft 2nd floor addition in rear of residence. (n) 66 sq ft landing and stairs on 1st floor. electrical work in new and remodeled areas.

Open the permit page

$120,000
Mar 4, 2026Completed
final sign-off May 2026
2376 46th AvE & E General Builder Incin kind master bathroom remodel.
Details
Permit
202603046905
Permit issued
Mar 4, 2026
Final sign-off
May 28, 2026

in kind master bathroom remodel.

Open the permit page

$35,000
Aug 13, 2025Completed
final sign-off Dec 2025
437 Day StE & E General Builder Incin kind bathroom renovation replace tub toilet vanity sink faucets and afan and scone lights including new tiles
Details
Permit
202508132970
Permit issued
Aug 13, 2025
Final sign-off
Dec 1, 2025

in kind bathroom renovation replace tub toilet vanity sink faucets and afan and scone lights including new tiles

Open the permit page

$23,000
Jul 11, 2025Completed
final sign-off Aug 2026
2376 46th AvE & E General Builder Incnew rear yard deck with stairs. remodel and legalize 815 sqft at 1st floor including 2 bedrooms, 1 bathroom and laundry. install new electrical heat pump to replace furnace. install new electric hybrid water heater. install new marvin doors at rear facade. height of deck shall not be above 10'-0"
Details
Permit
202507110615
Permit issued
Aug 5, 2025
Final sign-off
Aug 27, 2026

new rear yard deck with stairs. remodel and legalize 815 sqft at 1st floor including 2 bedrooms, 1 bathroom and laundry. install new electrical heat pump to replace furnace. install new electric hybrid water heater. install new marvin doors at rear facade. height of deck shall not be above 10'-0"

Open the permit page

$100,000
May 5, 2025Completed
final sign-off Dec 2025
437 Day StE & E General Builder Incin kind guest bathroom remodel, no wall removal or layout changes.
Details
Permit
202505055832
Permit issued
May 5, 2025
Final sign-off
Dec 1, 2025

in kind guest bathroom remodel, no wall removal or layout changes.

Open the permit page

$25,000
Sep 13, 2024Completed
final sign-off Nov 2024
37 Chenery StE & E General Builder Increbuilding (e) planter build a new planter and waterproofing to avoid water into the garage. break front driveway and install linear drain pour (n) concrete to replace concrete driveway with slope porch street
Details
Permit
202409130745
Permit issued
Sep 13, 2024
Final sign-off
Nov 25, 2024

rebuilding (e) planter build a new planter and waterproofing to avoid water into the garage. break front driveway and install linear drain pour (n) concrete to replace concrete driveway with slope porch street

Open the permit page

$45,000
Mar 20, 2024Completed
final sign-off Jun 2024
573 Page StE & E General Builder Incexisting split bath to be made into a bath & half with the addition of a toilet in the main bath & a small sink in the water closet, plumbing will be relocated for the additional toilet & for moving the tub & adding the sink. a nw ceiling fan & 3 can lights are the only electrical change. n0 strctr
Details
Permit
202403208288
Permit issued
Mar 20, 2024
Final sign-off
Jun 17, 2024

existing split bath to be made into a bath & half with the addition of a toilet in the main bath & a small sink in the water closet, plumbing will be relocated for the additional toilet & for moving the tub & adding the sink. a nw ceiling fan & 3 can lights are the only electrical change. n0 strctr

Open the permit page

$20,000
Mar 12, 2024Completed
final sign-off Sep 2024
222 Scott StE & E General Builder Inckitchen remodel (in kind) , no new fixtures, same layout, no structural, 1 bath remodel (in kind) no new fixtures, same layout, no structural.
Details
Permit
202403127594
Permit issued
Mar 12, 2024
Final sign-off
Sep 24, 2024

kitchen remodel (in kind) , no new fixtures, same layout, no structural, 1 bath remodel (in kind) no new fixtures, same layout, no structural.

Open the permit page

$55,000
Jan 4, 2024Completed
final sign-off Jul 2024
107 Loehr StE & E General Builder Increplace front window, break stucco around window to properly flash, check for damage below window and perform necessary repairs. window at front to be wood aluminum clad.
Details
Permit
202401043430
Permit issued
Jan 4, 2024
Final sign-off
Jul 24, 2024

replace front window, break stucco around window to properly flash, check for damage below window and perform necessary repairs. window at front to be wood aluminum clad.

Open the permit page

$6,500
Sep 15, 2023Completed
final sign-off Dec 2023
185 Burnside AvE & E General Builder Increplace the 2 front windows and 1 back of the house located in the kitchen area
Details
Permit
202309156681
Permit issued
Sep 15, 2023
Final sign-off
Dec 4, 2023

replace the 2 front windows and 1 back of the house located in the kitchen area

Open the permit page

$25,000
Aug 29, 2023Completed
final sign-off Jul 2024
1546 Baker StE & E General Builder Incin kind bathroom remodel
Details
Permit
202308295500
Permit issued
Aug 29, 2023
Final sign-off
Jul 5, 2024

in kind bathroom remodel

Open the permit page

$37,500
Aug 22, 2023Completed
final sign-off Jun 2024
14 Beaver StE & E General Builder Incnew full bathroom in bedroom 1.
Details
Permit
202308224927
Permit issued
Sep 22, 2023
Final sign-off
Jun 21, 2024

new full bathroom in bedroom 1.

Open the permit page

$5,000
Aug 16, 2023Completed
final sign-off Sep 2023
1546 Baker StE & E General Builder Incinstallation of approximately 120 sq ft r30 insulation on kitchen ceiling. new sheetrock 5/8" at ceiling and wall located in kitchen area. approx 200 sq ft. apply tape and paste including paint
Details
Permit
202308164527
Permit issued
Aug 16, 2023
Final sign-off
Sep 28, 2023

installation of approximately 120 sq ft r30 insulation on kitchen ceiling. new sheetrock 5/8" at ceiling and wall located in kitchen area. approx 200 sq ft. apply tape and paste including paint

Open the permit page

$6,500
May 24, 2023Completed
final sign-off May 2023
137 Beaver StE & E General Builder Increvision to permit 202302232464: to exclude item# 3 from original permit.
Details
Permit
202305248531
Permit issued
May 25, 2023
Final sign-off
May 26, 2023

revision to permit 202302232464: to exclude item# 3 from original permit.

Open the permit page

$1,500
May 12, 2023Completed
final sign-off Jul 2023
8 10th StE & E General Builder Incinstallation of 3 canopies 10' x 10' located on the 11th flr which is an open and recreational space of the building. not visible from the street
Details
Permit
202305127727
Permit issued
May 15, 2023
Final sign-off
Jul 7, 2023

installation of 3 canopies 10' x 10' located on the 11th flr which is an open and recreational space of the building. not visible from the street

Open the permit page

$15,000
May 12, 2023Completed
final sign-off Jan 2024
330 Baden StE & E General Builder Increvision to 202001303160 s1: relocation of (e) beam and footing, by 1'-6" to south; new footings for new posts
Details
Permit
202305127672
Permit issued
May 12, 2023
Final sign-off
Jan 16, 2024

revision to 202001303160 s1: relocation of (e) beam and footing, by 1'-6" to south; new footings for new posts

Open the permit page

Feb 23, 2023Completed
final sign-off May 2023
137 Beaver StE & E General Builder Incbasic kitchen remodel no plans. rear bldg
Details
Permit
202302232466
Permit issued
Feb 23, 2023
Final sign-off
May 26, 2023

basic kitchen remodel no plans. rear bldg

Open the permit page

$22,500
Feb 23, 2023Completed
final sign-off May 2023
137 Beaver StE & E General Builder Inccorrection of items #3 and #4 of markoff structural pest control report #221093 dated 12/12/22. rear bldg.
Details
Permit
202302232464
Permit issued
Feb 23, 2023
Final sign-off
May 26, 2023

correction of items #3 and #4 of markoff structural pest control report #221093 dated 12/12/22. rear bldg.

Open the permit page

$1,500
Jan 6, 2023Completed
final sign-off Jan 2024
336 Baden StE & E General Builder Incunderpinning of a 12 ft section of existing retaining wall
Details
Permit
202301069768
Permit issued
Jan 13, 2023
Final sign-off
Jan 16, 2024

underpinning of a 12 ft section of existing retaining wall

Open the permit page

$10,000
Dec 14, 2022Completed
final sign-off Jan 2024
330 Baden StE & E General Builder Incunderpinning a 9- foot section of the extg foundation at 330 baden street and be able to lower the floor and increase the over all height of the room height to a max of 8'x2"
Details
Permit
202212148269
Permit issued
Jan 13, 2023
Final sign-off
Jan 16, 2024

underpinning a 9- foot section of the extg foundation at 330 baden street and be able to lower the floor and increase the over all height of the room height to a max of 8'x2"

Open the permit page

$10,000
Oct 25, 2022Completed
final sign-off Feb 2023
1022 Powell StE & E General Builder Incin kind bathroom remodel
Details
Permit
202210255096
Permit issued
Oct 25, 2022
Final sign-off
Feb 22, 2023

in kind bathroom remodel

Open the permit page

$20,000
May 13, 2022Completed
final sign-off Dec 2022
438 Day StE & E General Builder Incin kind 2 bathrooms remodel at 2nd floor. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0(k)5.
Details
Permit
202205134223
Permit issued
May 13, 2022
Final sign-off
Dec 21, 2022

in kind 2 bathrooms remodel at 2nd floor. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0(k)5.

Open the permit page

$60,000
Nov 17, 2021Completed
final sign-off Nov 2022
37 Chenery StE & E General Builder Inc(e) bathroom will be fully demolish and new walls will be constructed to trace new bath, closet and powder room.interior garage door relocated. while no new sf will be added, approximately 500 sf of existing garage space will be converted into living space. new electrical fixtures and devices will
Details
Permit
202111172664
Permit issued
Jan 20, 2022
Final sign-off
Nov 17, 2022

(e) bathroom will be fully demolish and new walls will be constructed to trace new bath, closet and powder room.interior garage door relocated. while no new sf will be added, approximately 500 sf of existing garage space will be converted into living space. new electrical fixtures and devices will

Open the permit page

$20,000
Nov 12, 2021Completed
final sign-off Nov 2022
330 Baden StE & E General Builder Increvision to pa# 2021-0628-3325; shared foundation mod to underpinning
Details
Permit
202111122241
Permit issued
Nov 12, 2021
Final sign-off
Nov 16, 2022

revision to pa# 2021-0628-3325; shared foundation mod to underpinning

Open the permit page

Sep 10, 2021Completed
final sign-off Aug 2023
35 Chenery StE & E General Builder Incpartial remodel on 2nd flr, limited to kitchen, living room, hallway area. couple windows on the street side replaced. install (n) post & limited foundation retrofit will be performed in 1st flr garage. mech, elec, plumb will reuse (e) service. remove wall & replace by beam inkind.
Details
Permit
202109108148
Permit issued
Aug 22, 2022
Final sign-off
Aug 10, 2023

partial remodel on 2nd flr, limited to kitchen, living room, hallway area. couple windows on the street side replaced. install (n) post & limited foundation retrofit will be performed in 1st flr garage. mech, elec, plumb will reuse (e) service. remove wall & replace by beam inkind.

Open the permit page

$50,000
Jun 28, 2021Completed
final sign-off Nov 2023
330 Baden StE & E General Builder Incunderpinning of 330 baden st to stabalize foundation as we plan to do work on adjecent home 324 baden st, related to pa #202010106309.
Details
Permit
202106283325
Permit issued
Sep 14, 2021
Final sign-off
Nov 17, 2023

underpinning of 330 baden st to stabalize foundation as we plan to do work on adjecent home 324 baden st, related to pa #202010106309.

Open the permit page

$7,000
May 18, 2021Completed
final sign-off Sep 2021
44 Encline CtE & E General Builder Increplace bricks on front stair (facade only). repair dryrot on lower landing of front stairs.
Details
Permit
202105180508
Permit issued
May 18, 2021
Final sign-off
Sep 17, 2021

replace bricks on front stair (facade only). repair dryrot on lower landing of front stairs.

Open the permit page

$12,000
Mar 25, 2021Completed
final sign-off Dec 2021
37 Chenery StE & E General Builder Inckitchen remodel. replace skylight with dual-pane models. remove several walls. erect new partial roof and walls at kitchen. new electrical outlets. temporary remove (e) pv array on roof and replaced in same location.
Details
Permit
202103257285
Permit issued
Jun 9, 2021
Final sign-off
Dec 13, 2021

kitchen remodel. replace skylight with dual-pane models. remove several walls. erect new partial roof and walls at kitchen. new electrical outlets. temporary remove (e) pv array on roof and replaced in same location.

Open the permit page

$100,000
Feb 19, 2021Completed
final sign-off Nov 2022
324 Baden StE & E General Builder Inc, Dimension Construction Increvision to pa 202009214624. install (n) rear deck less than 10'-0" height. dry rot repair of front stucco stair wall. infill (e) south lightwell 14 sq ft area. addition of 673.5 sq ft at 1st flr with (e) envelope incl 2 baths & nursery rm. install (n) high efficiency furnace and tankless water heat
Details
Permit
202010106309
Permit issued
Oct 29, 2021
Final sign-off
Nov 16, 2022

revision to pa 202009214624. install (n) rear deck less than 10'-0" height. dry rot repair of front stucco stair wall. infill (e) south lightwell 14 sq ft area. addition of 673.5 sq ft at 1st flr with (e) envelope incl 2 baths & nursery rm. install (n) high efficiency furnace and tankless water heat

Open the permit page

$80,000
Dec 21, 2020Completed
final sign-off May 2021
153 Grand View AvE & E General Builder Incin-kind kitchen remodel: remove & replace kitcnbe counter, floor, counter top, no subtrader.
Details
Permit
202012211424
Permit issued
Dec 21, 2020
Final sign-off
May 25, 2021

in-kind kitchen remodel: remove & replace kitcnbe counter, floor, counter top, no subtrader.

Open the permit page

$25,000
Dec 9, 2020Completed
final sign-off Oct 2021
1597 Fulton StE & E General Builder Increplacement of front door entrance located at corner of fulton & lyon st. all materials to match (e) one to preserve the look of building, except replacement door will be half-glazed.
Details
Permit
202012090634
Permit issued
Mar 10, 2021
Final sign-off
Oct 19, 2021

replacement of front door entrance located at corner of fulton & lyon st. all materials to match (e) one to preserve the look of building, except replacement door will be half-glazed.

Open the permit page

$10,000
Dec 1, 2020Completed
final sign-off Dec 2020
5285 Diamond Heights BlE & E General Builder Incbring existing handrails up to code. current ones are dilapidated & not the correct height. located in front of building (main entrance) to comply with complaint 202067001
Details
Permit
202012019929
Permit issued
Dec 1, 2020
Final sign-off
Dec 11, 2020

bring existing handrails up to code. current ones are dilapidated & not the correct height. located in front of building (main entrance) to comply with complaint 202067001

Open the permit page

$4,000
Sep 30, 2020Completed
final sign-off Dec 2020
438 Day StE & E General Builder Increv to 202009214630: in-kind replacement of decayed members wiithin the main entrance staircase & supporting structure. work incluces replacement of a couple beams, columns & wall studs tht have rotted away due to water infiltration.
Details
Permit
202009305513
Permit issued
Oct 20, 2020
Final sign-off
Dec 8, 2020

rev to 202009214630: in-kind replacement of decayed members wiithin the main entrance staircase & supporting structure. work incluces replacement of a couple beams, columns & wall studs tht have rotted away due to water infiltration.

Open the permit page

$5,000
Sep 21, 2020Completed
final sign-off Dec 2020
438 Day StE & E General Builder Increpair in-kind front stairs & landing. replace any damaged siding. less than 5o% repair
Details
Permit
202009214630
Permit issued
Sep 21, 2020
Final sign-off
Dec 8, 2020

repair in-kind front stairs & landing. replace any damaged siding. less than 5o% repair

Open the permit page

$7,000
Sep 21, 2020Completed
final sign-off Nov 2022
324 Baden StE & E General Builder Incremodel (e) bathroom & (e) kitchen. fixture locations to remain the same. remodel (e) finishes in living room & bedrooms.
Details
Permit
202009214624
Permit issued
Sep 21, 2020
Final sign-off
Nov 16, 2022

remodel (e) bathroom & (e) kitchen. fixture locations to remain the same. remodel (e) finishes in living room & bedrooms.

Open the permit page

$70,000
Jul 16, 2020Completed
final sign-off Nov 2020
44 Encline CtE & E General Builder Incin-kind kitchen remodel (~150 sqft). removing and replacing linoleum floor, cabinets and appliances.
Details
Permit
202007160307
Permit issued
Jul 20, 2020
Final sign-off
Nov 10, 2020

in-kind kitchen remodel (~150 sqft). removing and replacing linoleum floor, cabinets and appliances.

Open the permit page

$22,000
Jan 30, 2020Completed
final sign-off Jan 2024
330 Baden StE & E General Builder Incnew 2 story rear yard addition including 2 bedrooms & bathroom. new roof deck @ 2nd floor above 1st floor addition. remodel (e) house interior including kitchen & master bathroom. install new half bathroom. no work proposed @ front facade.
Details
Permit
202001303160
Permit issued
Jan 29, 2021
Final sign-off
Jan 16, 2024

new 2 story rear yard addition including 2 bedrooms & bathroom. new roof deck @ 2nd floor above 1st floor addition. remodel (e) house interior including kitchen & master bathroom. install new half bathroom. no work proposed @ front facade.

Open the permit page

$150,000
Dec 31, 2019Completed
final sign-off May 2020
37 Chenery StE & E General Builder Inc2nd floor bathroom remodel in kind. no structural work
Details
Permit
201912311044
Permit issued
Dec 31, 2019
Final sign-off
May 21, 2020

2nd floor bathroom remodel in kind. no structural work

Open the permit page

$15,000
Dec 26, 2019Completed
final sign-off May 2020
37 Chenery StE & E General Builder Incremove existing stucco located in the front stairs. repair wood damage. remove existing permastone and aluminum siding and restore to original stucco. no other work.
Details
Permit
201912260726
Permit issued
Dec 31, 2019
Final sign-off
May 4, 2020

remove existing stucco located in the front stairs. repair wood damage. remove existing permastone and aluminum siding and restore to original stucco. no other work.

Open the permit page

$7,500
Dec 18, 2019Completed
final sign-off Jan 2020
2821 25th StE & E General Builder Increplace 2 windows in 1 bedroom like for like, same location. not visible from street. comply w/ nov 201979291
Details
Permit
201912189967
Permit issued
Dec 18, 2019
Final sign-off
Jan 8, 2020

replace 2 windows in 1 bedroom like for like, same location. not visible from street. comply w/ nov 201979291

Open the permit page

$2,700
Dec 10, 2019Completed
final sign-off Jun 2020
1955 Franklin StE & E General Builder Incvoluntary structural strengthening at southeast corner of building, (530 sq. ft of floor area) no structureal partiton demo, no (n) conc and no (n) parttions n/a maher
Details
Permit
201912109094
Permit issued
Dec 10, 2019
Final sign-off
Jun 15, 2020

voluntary structural strengthening at southeast corner of building, (530 sq. ft of floor area) no structureal partiton demo, no (n) conc and no (n) parttions n/a maher

Open the permit page

$10,000
Jul 26, 2019Completed
final sign-off Sep 2019
4531 20th StE & E General Builder Increvision to application #201906102985. to correct scope description: should be in kind remodel 2 bathrooms, instead of 1.
Details
Permit
201907267127
Permit issued
Jul 26, 2019
Final sign-off
Sep 6, 2019

revision to application #201906102985. to correct scope description: should be in kind remodel 2 bathrooms, instead of 1.

Open the permit page

Jun 10, 2019Completed
final sign-off Sep 2019
4531 20th StE & E General Builder Incin kind bathroom remodel. plumbing not included.
Details
Permit
201906102985
Permit issued
Jun 10, 2019
Final sign-off
Sep 6, 2019

in kind bathroom remodel. plumbing not included.

Open the permit page

$35,000
Jun 10, 2019Completed
final sign-off Oct 2019
451 Day StE & E General Builder Inctake out existing fixtures (bathrooms) add new tiles & fixtures to 1 bathroom and powder room
Details
Permit
201906102986
Permit issued
Jun 10, 2019
Final sign-off
Oct 21, 2019

take out existing fixtures (bathrooms) add new tiles & fixtures to 1 bathroom and powder room

Open the permit page

$12,000
Apr 1, 2019Never finaled
issued Apr 2019, no final
2130 Pierce StE & E General Builder Incdry rot repair in-kind. siding repair in-kind. remove existing siding, (408 sq ft), replace any 2x that are damaged due to bathroom leaks, insatll new 1/2" structural #1 cdx, insatll new siding to match existing one.
Details
Permit
201904016802
Permit issued
Apr 1, 2019

dry rot repair in-kind. siding repair in-kind. remove existing siding, (408 sq ft), replace any 2x that are damaged due to bathroom leaks, insatll new 1/2" structural #1 cdx, insatll new siding to match existing one.

Open the permit page

$7,000
Feb 4, 2019Completed
final sign-off Mar 2019
10 Lippard AvE & E General Builder Increplace (e) kitchen upper cabinets. adding new cabinets on top of (e) upper cabinets. replace counter top. re-use (e) appliances & fixts.
Details
Permit
201902041992
Permit issued
Feb 4, 2019
Final sign-off
Mar 26, 2019

replace (e) kitchen upper cabinets. adding new cabinets on top of (e) upper cabinets. replace counter top. re-use (e) appliances & fixts.

Open the permit page

$15,000
Jan 11, 2019Completed
final sign-off May 2019
3778 20th StE & E General Builder Incdemolish existing retaining wall along west (right) property line at rear.
Details
Permit
201901110223
Permit issued
Feb 12, 2019
Final sign-off
May 3, 2019

demolish existing retaining wall along west (right) property line at rear.

Open the permit page

$4,000
Dec 6, 2018Completed
final sign-off May 2019
1000 03rd StE & E General Builder Incinterior wall construction per drawing (new closet). sprinkler under separate permit.
Details
Permit
201812067569
Permit issued
Dec 17, 2018
Final sign-off
May 21, 2019

interior wall construction per drawing (new closet). sprinkler under separate permit.

Open the permit page

$5,000
Nov 21, 2018Completed
final sign-off Feb 2019
1000 03rd StE & E General Builder Incinstall 2 new interior door per plan. relocate 2 light switches
Details
Permit
201811216503
Permit issued
Nov 21, 2018
Final sign-off
Feb 11, 2019

install 2 new interior door per plan. relocate 2 light switches

Open the permit page

$5,000
Nov 7, 2018Never finaled
issued Nov 2018, no final
66 Elsie StE & E General Builder Incremoving (e) siding on left top side of bld. replacing 552 sf of siding
Details
Permit
201811075304
Permit issued
Nov 7, 2018

removing (e) siding on left top side of bld. replacing 552 sf of siding

Open the permit page

$19,000
Nov 7, 2018Expired or cancelled
cancelled Jan 2026
110 ChannelE & E General Builder Incremoving (e) doors loated in master bedroom, master bathroom, walk in closet. pre framing for new pocket door in master bedroom & naster bathroom. installing custom cabinetry in kitchen
Details
Permit
201811075302

removing (e) doors loated in master bedroom, master bathroom, walk in closet. pre framing for new pocket door in master bedroom & naster bathroom. installing custom cabinetry in kitchen

Open the permit page

$8,828
Oct 2, 2018Expired or cancelled
withdrawn Oct 2018
72 Elsie StE & E General Builder Incexploratory demo work at rear wood porch and deck. investigation of wood damage. remove interior wall board at select locations. no work to front street facade
Details
Permit
201810022040

exploratory demo work at rear wood porch and deck. investigation of wood damage. remove interior wall board at select locations. no work to front street facade

Open the permit page

$1,000
Sep 6, 2018Completed
final sign-off Nov 2019
720 Junipero Serra BlE & E General Builder Incremodel existing kitchen remove fixtures & appliances & install new ones at same location. 2 bathrooms remove existing fixtures & replace the with new ones, same location
Details
Permit
201809069299
Permit issued
Sep 6, 2018
Final sign-off
Nov 19, 2019

remodel existing kitchen remove fixtures & appliances & install new ones at same location. 2 bathrooms remove existing fixtures & replace the with new ones, same location

Open the permit page

$81,000
Sep 4, 2018Completed
final sign-off Oct 2019
3772 20th StE & E General Builder Increpair garage, remove (e) garage roof, siding and sheathing. maintain (e) exterior walls. install new framing at garage roof and hardiplank cement board siding at exterior garage walls.
Details
Permit
201809049005
Permit issued
Nov 21, 2018
Final sign-off
Oct 23, 2019

repair garage, remove (e) garage roof, siding and sheathing. maintain (e) exterior walls. install new framing at garage roof and hardiplank cement board siding at exterior garage walls.

Open the permit page

$75,000
Apr 30, 2018Completed
final sign-off May 2018
601 Belvedere StE & E General Builder Increinforce all cripple walls where accessible and floor supports including anchor bolts to mudsill and retrofit plates where indicated and metal connectors to the wood frame in conformance with cebc appendix chapter a3.
Details
Permit
201804307712
Permit issued
Apr 30, 2018
Final sign-off
May 29, 2018

reinforce all cripple walls where accessible and floor supports including anchor bolts to mudsill and retrofit plates where indicated and metal connectors to the wood frame in conformance with cebc appendix chapter a3.

Open the permit page

$5,000
Mar 19, 2018Expired or cancelled
cancelled Oct 2020
601 Belvedere StE & E General Builder Incbecause of age and exposure to the elements a complete replacement work of the exterior wooden staircase and landing will be under taken
Details
Permit
201803193994

because of age and exposure to the elements a complete replacement work of the exterior wooden staircase and landing will be under taken

Open the permit page

$15,000
Feb 20, 2018Never finaled
issued Aug 2018, no final
182 Gough StE & E General Builder Inc, Nor-Cal Overheadreplacement of (e) non-historic bulkhead tile at 182 gough with (n) tile to match. existing permits abating planning's enforcement casr no. 2018-001725enf.
Details
Permit
201802201753
Permit issued
Aug 10, 2018

replacement of (e) non-historic bulkhead tile at 182 gough with (n) tile to match. existing permits abating planning's enforcement casr no. 2018-001725enf.

Open the permit page

$2,602
Oct 26, 2017Completed
final sign-off Dec 2017
1531 Noe StE & E General Builder Increvision to app#201708225512 to remove extg damaged foundation wall 13'-6" length x 2'-7 height at garage location.
Details
Permit
201710262405
Permit issued
Oct 27, 2017
Final sign-off
Dec 12, 2017

revision to app#201708225512 to remove extg damaged foundation wall 13'-6" length x 2'-7 height at garage location.

Open the permit page

$6,000
Oct 10, 2017Completed
final sign-off Dec 2019
72 Elsie StE & E General Builder Incremoval of enclosed storage porch and deck at backyard. addition of 235 sq ft at lower level and 206 sq ft at main level(entry level). new master bedroom and bathroom at lower level. new living room at upper level. mechanical, plumbing, electrical as req'd. minor cabinetry at kitchen.
Details
Permit
201710100713
Permit issued
Jul 23, 2018
Final sign-off
Dec 11, 2019

removal of enclosed storage porch and deck at backyard. addition of 235 sq ft at lower level and 206 sq ft at main level(entry level). new master bedroom and bathroom at lower level. new living room at upper level. mechanical, plumbing, electrical as req'd. minor cabinetry at kitchen.

Open the permit page

$100,000
Oct 5, 2017Completed
final sign-off Jan 2018
75 Manor DrE & E General Builder Incremove/replace 7 existing windows, replace any damage plywood and install new windows including 300 sf of stucco. visible to the street. u-factor 0.32, windows same size/location
Details
Permit
201710050521
Permit issued
Oct 5, 2017
Final sign-off
Jan 22, 2018

remove/replace 7 existing windows, replace any damage plywood and install new windows including 300 sf of stucco. visible to the street. u-factor 0.32, windows same size/location

Open the permit page

$20,000
Aug 25, 2017Completed
final sign-off Jan 2018
75 Manor DrE & E General Builder Incremove and replace 4 windows located in 2/f (non-street facing), and replace 100sf of stucco . u-factor 0.32
Details
Permit
201708255897
Permit issued
Aug 25, 2017
Final sign-off
Jan 22, 2018

remove and replace 4 windows located in 2/f (non-street facing), and replace 100sf of stucco . u-factor 0.32

Open the permit page

$16,000
Aug 22, 2017Completed
final sign-off Dec 2017
1531 Noe StE & E General Builder Incremove (e) bad foundation 14' long x 3'6" hight and build new foundation per code.
Details
Permit
201708225512
Permit issued
Aug 28, 2017
Final sign-off
Dec 12, 2017

remove (e) bad foundation 14' long x 3'6" hight and build new foundation per code.

Open the permit page

$24,000
Jun 22, 2017Completed
final sign-off May 2018
50 Encline CtE & E General Builder Incexpand 1st floor bathroom closet. rear exterior wall to be demolished and construct new. foundation at rear to be constructed new. install a steel frame 12' clear span and a 12' sliding door(max u factor 0.32). no exterior work will be done. visible from street
Details
Permit
201706220046
Permit issued
Oct 27, 2017
Final sign-off
May 16, 2018

expand 1st floor bathroom closet. rear exterior wall to be demolished and construct new. foundation at rear to be constructed new. install a steel frame 12' clear span and a 12' sliding door(max u factor 0.32). no exterior work will be done. visible from street

Open the permit page

$40,000
Mar 31, 2017Completed
final sign-off Oct 2017
1422 Revere AvE & E General Builder Incremodel (e) bath. add 2 baths on 1st flr, one additional on 2nd flr. build interior partitions on 1st. remodel kitchen, change lighting, replace plumbing. replace window in rear. replace door in rear , repair damaged joists; foundation retro - install anchor bolts.
Details
Permit
201703312889
Permit issued
Apr 17, 2017
Final sign-off
Oct 10, 2017

remodel (e) bath. add 2 baths on 1st flr, one additional on 2nd flr. build interior partitions on 1st. remodel kitchen, change lighting, replace plumbing. replace window in rear. replace door in rear , repair damaged joists; foundation retro - install anchor bolts.

Open the permit page

$85,000
Dec 2, 2016Completed
final sign-off Mar 2018
530 44th AvE & E General Builder Incfill-in light well to create new stair, new bedroom, bathroom, sitting room and laundry in 1st floor. partly in new enclosed space and partly within extg garage space. horizontal addition.
Details
Permit
201612024032
Permit issued
Jul 7, 2017
Final sign-off
Mar 26, 2018

fill-in light well to create new stair, new bedroom, bathroom, sitting room and laundry in 1st floor. partly in new enclosed space and partly within extg garage space. horizontal addition.

Open the permit page

$100,000
Jun 16, 2015Completed
final sign-off Oct 2019
3772 20th StE & E General Builder Increnovation and rebuilding second means of egress stair landings. remove & replace existing stair tower. garage repair removed from scope.
Details
Permit
201506169131
Permit issued
Nov 5, 2018
Final sign-off
Oct 11, 2019

renovation and rebuilding second means of egress stair landings. remove & replace existing stair tower. garage repair removed from scope.

Open the permit page

$25,000