Shaun Ryan
- Listed as
- authorized agent-others, contractor
- Firm
- Block 12 Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2015 to Jul 2026
161 permits since 2000 (contractor on 160 permits, authorized agent-others on 16 permits): 120 completed, 10 in progress, 24 never finaled, 7 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 161.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 10, 2026 | Completed final sign-off Sep 2026 | 575 Pierce St | Block 12 Construction | #505: in kind bathroom remodel. no wall changes, new electrical plugs and switches, new plumbing and fixtures and shower pan.Details
#505: in kind bathroom remodel. no wall changes, new electrical plugs and switches, new plumbing and fixtures and shower pan. | $40,000 |
| Jun 12, 2026 | Completed final sign-off Aug 2026 | 2101 California St | Block 12 Construction | exterior south wall on laguna st dryrot and stucco repair (approx. 400 sf)Details
exterior south wall on laguna st dryrot and stucco repair (approx. 400 sf) | $42,500 |
| Mar 9, 2026 | Completed final sign-off Jul 2026 | 88 King St | Block 12 Construction | unit #1305, in-kind interior remodel. new interior finishes, new kitchen counter, wd laundry relocation- move 4ft, (e) ventless dryer, new plugs switches. no structural changes. new hardwood flooring in bedrooms.Details
unit #1305, in-kind interior remodel. new interior finishes, new kitchen counter, wd laundry relocation- move 4ft, (e) ventless dryer, new plugs switches. no structural changes. new hardwood flooring in bedrooms. | $50,000 |
| Jan 15, 2026 | Completed final sign-off Sep 2026 | 89 Ashbury Tr | Block 12 Construction | 2x bathroom remodel to include replace (e) switches, plugs, fixtures with new fixtures, no wall removal or layout change. all like for likeDetails
2x bathroom remodel to include replace (e) switches, plugs, fixtures with new fixtures, no wall removal or layout change. all like for like | $50,000 |
| Jan 12, 2026 | Completed final sign-off May 2026 | 990 Bay St | Block 12 Construction | unit# 207 - revision to pa #2025-1030-8561: kitchen and bath remodel. removal of interior partition walls non structural.Details
unit# 207 - revision to pa #2025-1030-8561: kitchen and bath remodel. removal of interior partition walls non structural. | |
| Jan 12, 2026 | Completed final sign-off May 2026 | 990 Bay St | Block 12 Construction | revision to pa #2025-1030-8563: kitchen and bath remodel. removal of interior partition walls non structural.Details
revision to pa #2025-1030-8563: kitchen and bath remodel. removal of interior partition walls non structural. | |
| Oct 30, 2025 | In progress issued Oct 2025 | 990 Bay St | Block 12 Construction | unit 207-in kind kitchen and bath remodel . no structural changes. (n) electrical plugs, switches, fixtures, (n) plumbing fixtures and applicances, lightings shall comply with cenc 1605 (a)Details
unit 207-in kind kitchen and bath remodel . no structural changes. (n) electrical plugs, switches, fixtures, (n) plumbing fixtures and applicances, lightings shall comply with cenc 1605 (a) | $75,000 |
| Oct 30, 2025 | In progress issued Oct 2025 | 990 Bay St | Block 12 Construction | unit 304-in kind kitchen and bath remodel . no structural changes. (n) electrical plugs, switches, fixtures, (n) plumbing fixtures and applicances, lightings shall comply with cenl 160.5 (a)Details
unit 304-in kind kitchen and bath remodel . no structural changes. (n) electrical plugs, switches, fixtures, (n) plumbing fixtures and applicances, lightings shall comply with cenl 160.5 (a) | $75,000 |
| Aug 20, 2025 | In progress issued Aug 2025 | 2118 40th Av | Block 12 Construction | in kind kitchen and (2) bath remodel (n) plumbing and electrical fixtures, appliances. no structrual or wall changes.Details
in kind kitchen and (2) bath remodel (n) plumbing and electrical fixtures, appliances. no structrual or wall changes. | $150,000 |
| May 29, 2025 | In progress issued Jul 2025 | 595 Alabama St | Block 12 Construction | construction of 1 partial height wall. installation of 1 traffic gate. new seating and tables. refinish floor in area of work. legalize the e roll down doors along the alabama st and 18th frontages under planning code section 145.1 d3a to abate envorcement case 2022012702 enfDetails
construction of 1 partial height wall. installation of 1 traffic gate. new seating and tables. refinish floor in area of work. legalize the e roll down doors along the alabama st and 18th frontages under planning code section 145.1 d3a to abate envorcement case 2022012702 enf | $12,500 |
| Apr 30, 2025 | Completed final sign-off May 2025 | 595 Alabama St | Block 12 Construction | demolish bar, back bar, fixtures and shelves. disconnect and cap all utilities in place. ab-17 soft demo only.Details
demolish bar, back bar, fixtures and shelves. disconnect and cap all utilities in place. ab-17 soft demo only. | $20,000 |
| Apr 18, 2025 | Completed final sign-off Sep 2025 | 1330 Jones St | Block 12 Construction | unit 406: in kind kitchen and bathroom remodel. not moving walls, new electrical receptacles, replace existing lights with new., new cabinets, appliances, plumbing fixtures and finishes.Details
unit 406: in kind kitchen and bathroom remodel. not moving walls, new electrical receptacles, replace existing lights with new., new cabinets, appliances, plumbing fixtures and finishes. | $82,000 |
| Apr 18, 2025 | Completed final sign-off Sep 2025 | 1330 Jones St | Block 12 Construction | unit 705: in kind kitchen and bathroom remodel. not moving walls, new electrical receptacles, replace existing lights with new., new cabinets, appliances, plumbing fixtures and finishes.Details
unit 705: in kind kitchen and bathroom remodel. not moving walls, new electrical receptacles, replace existing lights with new., new cabinets, appliances, plumbing fixtures and finishes. | $82,000 |
| Apr 18, 2025 | Completed final sign-off Sep 2025 | 1330 Jones St | Block 12 Construction | unit 704: in kind kitchen and bathroom remodel. not moving walls, new electrical receptacles, replace existing lights with new., new cabinets, appliances, plumbing fixtures and finishes.Details
unit 704: in kind kitchen and bathroom remodel. not moving walls, new electrical receptacles, replace existing lights with new., new cabinets, appliances, plumbing fixtures and finishes. | $82,000 |
| Apr 18, 2025 | Completed final sign-off Sep 2025 | 1330 Jones St | Block 12 Construction | unit 405: in kind kitchen and bathroom remodel. not moving walls, new electrical receptacles, replace existing lights with new., new cabinets, appliances, plumbing fixtures and finishes.Details
unit 405: in kind kitchen and bathroom remodel. not moving walls, new electrical receptacles, replace existing lights with new., new cabinets, appliances, plumbing fixtures and finishes. | $82,000 |
| Apr 18, 2025 | Completed final sign-off Sep 2025 | 1330 Jones St | Block 12 Construction | unit 401: in kind kitchen and bathroom remodel. not moving walls, new electrical receptacles, replace existing lights with new., new cabinets, appliances, plumbing fixtures and finishes.Details
unit 401: in kind kitchen and bathroom remodel. not moving walls, new electrical receptacles, replace existing lights with new., new cabinets, appliances, plumbing fixtures and finishes. | $82,000 |
| Apr 18, 2025 | Completed final sign-off Sep 2025 | 1330 Jones St | Block 12 Construction | unit 601: in kind kitchen and bathroom remodel. not moving walls, new electrical receptacles, replace existing lights with new., new cabinets, appliances, plumbing fixtures and finishes.Details
unit 601: in kind kitchen and bathroom remodel. not moving walls, new electrical receptacles, replace existing lights with new., new cabinets, appliances, plumbing fixtures and finishes. | $82,000 |
| Apr 17, 2025 | Completed final sign-off Oct 2025 | 1330 Jones St | Block 12 Construction | unit 301- kitchen and bathroom remodel . new cabinets, appliances, plumbing fixtures, finishes. new electrical- replace (e) receptacles w/ (n). in kind no wall removal or layout change.Details
unit 301- kitchen and bathroom remodel . new cabinets, appliances, plumbing fixtures, finishes. new electrical- replace (e) receptacles w/ (n). in kind no wall removal or layout change. | $82,000 |
| Apr 17, 2025 | Completed final sign-off Oct 2025 | 1330 Jones St | Block 12 Construction | unit 201- kitchen and bathroom remodel . in kind no wall removal or layout changeDetails
unit 201- kitchen and bathroom remodel . in kind no wall removal or layout change | $82,000 |
| Apr 17, 2025 | In progress issued Apr 2025 | 1342 Revere Av | Fuse Service Inc | install two ductless heat pumps located in backyward not visbile from street.Details
install two ductless heat pumps located in backyward not visbile from street. | $7,000 |
| Apr 17, 2025 | Completed final sign-off Oct 2025 | 1330 Jones St | Block 12 Construction | unit 205- kitchen and bathroom remodel. new cabinets, appliances, plumbing fixtures, finishes. new electrical- replace (e) receptacles w/ (n). in kind no wall removal or layout change.Details
unit 205- kitchen and bathroom remodel. new cabinets, appliances, plumbing fixtures, finishes. new electrical- replace (e) receptacles w/ (n). in kind no wall removal or layout change. | $82,000 |
| Apr 17, 2025 | Completed final sign-off Oct 2025 | 1330 Jones St | Block 12 Construction | unit 305 - kitchen and bath remodel. new cabinets, appliances, plumbing fixtures and finishes. new electrical (recptacles, replace (e) lights w/ new). pid/eid contractor to pull thier own permit. no moving wallsDetails
unit 305 - kitchen and bath remodel. new cabinets, appliances, plumbing fixtures and finishes. new electrical (recptacles, replace (e) lights w/ new). pid/eid contractor to pull thier own permit. no moving walls | $82,000 |
| Apr 17, 2025 | Completed final sign-off Oct 2025 | 1330 Jones St | Block 12 Construction | unit 304 - kitchen and bath remodel. new cabinets, appliances, plumbing fixtures and finishes. new electrical (recptacles, replace (e) lights w/ new). pid/eid contractor to pull thier own permit. no moving wallsDetails
unit 304 - kitchen and bath remodel. new cabinets, appliances, plumbing fixtures and finishes. new electrical (recptacles, replace (e) lights w/ new). pid/eid contractor to pull thier own permit. no moving walls | $82,000 |
| Apr 17, 2025 | Completed final sign-off Oct 2025 | 1330 Jones St | Block 12 Construction | unit 202- kitchen and bathroom remodel . in kind no wall removal or layout changeDetails
unit 202- kitchen and bathroom remodel . in kind no wall removal or layout change | $82,000 |
| Feb 11, 2025 | Expired or cancelled cancelled Feb 2025 | 803 Fillmore St | Block 12 Construction | construct 2 adu in (e) restaurant space per ord 162-16.alt of (e) storefront to accomodate new residential entries and removal of walls on sheet a1.0.construct new walls, cabinets, applicances,plumbing fixtures and trim.new electrical recept,comm outlets,lighting and ventilation.Details
construct 2 adu in (e) restaurant space per ord 162-16.alt of (e) storefront to accomodate new residential entries and removal of walls on sheet a1.0.construct new walls, cabinets, applicances,plumbing fixtures and trim.new electrical recept,comm outlets,lighting and ventilation. | $400,000 |
| Dec 11, 2024 | Completed final sign-off Apr 2025 | 1530 41st Av | Block 12 Construction | in kind bathroom remodel. new fixtures and finishes new elec plugs/switches, new plummbing fixture. no change to floor layout. no change to wall layout. no structural work.Details
in kind bathroom remodel. new fixtures and finishes new elec plugs/switches, new plummbing fixture. no change to floor layout. no change to wall layout. no structural work. | $15,000 |
| Oct 15, 2024 | Completed final sign-off Feb 2025 | 464 11th Av | Block 12 Construction | to obtain final inspection for work approved under 201603010925. all work is completedDetails
to obtain final inspection for work approved under 201603010925. all work is completed | |
| Oct 15, 2024 | Completed final sign-off Feb 2025 | 462 11th Av | Block 12 Construction | commencement for work not started under previously approved permit application pa# 201605137447. per cc report #8534.Details
commencement for work not started under previously approved permit application pa# 201605137447. per cc report #8534. | |
| Sep 27, 2024 | In progress filed Sep 2024, not yet issued | 203 Oak St | Block 12 Construction | installation of exterior trash enclosure at the public right of way on oak st frontage to comply w/ nov 202425310Details
installation of exterior trash enclosure at the public right of way on oak st frontage to comply w/ nov 202425310 | $800 |
| Sep 16, 2024 | Completed final sign-off Nov 2024 | 299 Post St | Block 12 Construction | to satisfy nov 202427587 emergency call out- car ran into column. no structural damage. repair column, new framing, fire rated ply, new thin brick facadeDetails
to satisfy nov 202427587 emergency call out- car ran into column. no structural damage. repair column, new framing, fire rated ply, new thin brick facade | $8,000 |
| Jul 19, 2024 | Completed final sign-off Aug 2024 | 1101 Castro St | Block 12 Construction | in kind stair/dry rot repairs to comply with #2,#3,#8 of complaint 202423412, less than 50% of structure, rear exteriorDetails
in kind stair/dry rot repairs to comply with #2,#3,#8 of complaint 202423412, less than 50% of structure, rear exterior | $40,000 |
| Jul 19, 2024 | Completed final sign-off Jul 2024 | 415 Warren Dr | Block 12 Construction | revision to pa #202402296852 in kinds deck repairs. ref to nov #202418617.Details
revision to pa #202402296852 in kinds deck repairs. ref to nov #202418617. | |
| May 15, 2024 | Completed final sign-off Jun 2024 | 438 Tehama St | Block 12 Construction | all work in unit: 438c tehama street: to comply with nov# 202312721. (n) bathroom fan.Details
all work in unit: 438c tehama street: to comply with nov# 202312721. (n) bathroom fan. | $2,500 |
| May 6, 2024 | In progress issued May 2024 | 219 Brannan St | Block 12 Construction | 219a brannan street: new mechanical equipment hvac and ducting. new plumbing and fixtures. ref pa#202209142422Details
219a brannan street: new mechanical equipment hvac and ducting. new plumbing and fixtures. ref pa#202209142422 | $150,000 |
| Apr 10, 2024 | Completed final sign-off Jul 2024 | 801 Fillmore St | Block 12 Construction | remodel of one extg residential unit including relocation of kitchen. removal of walls as indicated on a1.0 construction of new walls as indicated on a1.0. nw cabinets, appliances, plmg, fixtures & finishes. nw electrical recepticals, communication outlets, lighting & ventilation. remodel of e. bathDetails
remodel of one extg residential unit including relocation of kitchen. removal of walls as indicated on a1.0 construction of new walls as indicated on a1.0. nw cabinets, appliances, plmg, fixtures & finishes. nw electrical recepticals, communication outlets, lighting & ventilation. remodel of e. bath | $100,000 |
| Mar 7, 2024 | Completed final sign-off Oct 2024 | 2040 Broadway | Block 12 Construction | unit #103: interior cosmetic t.i. inkind kitchen & bath remodel, (n) finishes, fixtures, appliances, flooring. no structural or wall changes. (n) electrical plugs & switches, subpanel, (n) plumbing fixtures.Details
unit #103: interior cosmetic t.i. inkind kitchen & bath remodel, (n) finishes, fixtures, appliances, flooring. no structural or wall changes. (n) electrical plugs & switches, subpanel, (n) plumbing fixtures. | $150,000 |
| Mar 7, 2024 | Completed final sign-off Aug 2024 | 299 Post St | Block 12 Construction | complete new tenant exterior including store front finishes.Details
complete new tenant exterior including store front finishes. | $175,000 |
| Feb 29, 2024 | Completed final sign-off Jul 2024 | 415 Warren Dr | Block 12 Construction | in kind dryrot repairs for the 3rd and 4th decks to satisfy nov complaint #202418617. less than 50% of the structure (front facing)Details
in kind dryrot repairs for the 3rd and 4th decks to satisfy nov complaint #202418617. less than 50% of the structure (front facing) | $40,000 |
| Dec 1, 2023 | Completed final sign-off Apr 2024 | 145 Laurel St | Block 12 Construction | unit 17: remodel and phase iii completion of phase 1 of volutary seismic strengthening work within unit 17.Details
unit 17: remodel and phase iii completion of phase 1 of volutary seismic strengthening work within unit 17. | $85,000 |
| Nov 14, 2023 | Completed final sign-off Aug 2024 | 299 Post St | Block 12 Construction | renovation of 3414 sq ft of (e) mezzanine, 1st and cellar level consisting of complete tenant interior improvement. new construction including selected new partitions and ceilings, selected electrical and mechanical.Details
renovation of 3414 sq ft of (e) mezzanine, 1st and cellar level consisting of complete tenant interior improvement. new construction including selected new partitions and ceilings, selected electrical and mechanical. | $900,000 |
| Oct 27, 2023 | Completed final sign-off Aug 2024 | 299 Post St | Block 12 Construction | removal of interior partitions, ceilings, sales flr fixtures, plumbing fixtures, electrical and finishes of a 3414 sqft. existing store on 3 levels. no change of egress. ab-017: exception to requirements for disabled access to vacant spaces.Details
removal of interior partitions, ceilings, sales flr fixtures, plumbing fixtures, electrical and finishes of a 3414 sqft. existing store on 3 levels. no change of egress. ab-017: exception to requirements for disabled access to vacant spaces. | $8,000 |
| Apr 4, 2023 | Never finaled issued May 2023, no final | 2050 Chestnut St | Block 12 Construction | new non load bearing partitions, new floor finish, new lighting, new electrical outlets, new supplementary sink, new finishesDetails
new non load bearing partitions, new floor finish, new lighting, new electrical outlets, new supplementary sink, new finishes | $200,000 |
| Mar 24, 2023 | Never finaled issued Jun 2023, no final | 403 08th Av | Block 12 Construction | install trash enclosure on sidewalk facing 8th ave with dpwDetails
install trash enclosure on sidewalk facing 8th ave with dpw | $500 |
| Mar 22, 2023 | Completed final sign-off Jul 2023 | 145 Laurel St | Block 12 Construction | replace (e) bathrooms in kind on 6th floor. (1) bathroom in unit #14, (2) bathrooms each in units # 15 and #16.Details
replace (e) bathrooms in kind on 6th floor. (1) bathroom in unit #14, (2) bathrooms each in units # 15 and #16. | $100,000 |
| Mar 17, 2023 | Completed final sign-off Jan 2025 | 1 Mallorca Wy | Block 12 Construction | construction of 3 adu units on 1/f. no excavation.no change to egress or occ.removal of non-structural walls, add new walls, cabinets,apppliances,plumb fixtures/finishes.new electrical receptacles, communication outlets, lighting & ventilation. install heat pumps. sidewalk work. 3 street trees.Details
construction of 3 adu units on 1/f. no excavation.no change to egress or occ.removal of non-structural walls, add new walls, cabinets,apppliances,plumb fixtures/finishes.new electrical receptacles, communication outlets, lighting & ventilation. install heat pumps. sidewalk work. 3 street trees. | $900,000 |
| Feb 3, 2023 | Completed final sign-off Mar 2024 | 152 16th Av | Block 12 Construction | revision bpa#202003126952, replac (8) street facing windows w/new wood in (e) openings/in-kind, replace (e) stucco wall finish/waterproofing layer. (e) stairs to remain w/in-kind repair to treads/riser as needed, no configuration change/detail. to abate complalint #202200494Details
revision bpa#202003126952, replac (8) street facing windows w/new wood in (e) openings/in-kind, replace (e) stucco wall finish/waterproofing layer. (e) stairs to remain w/in-kind repair to treads/riser as needed, no configuration change/detail. to abate complalint #202200494 | $70,000 |
| Jan 13, 2023 | Completed final sign-off Jul 2023 | 145 Laurel St | Block 12 Construction | 1-6/flr: revisions to pa# 2022-0711-8184: new washer and dryer as shown on plans. unit #16: 1-kitchen remodel.Details
1-6/flr: revisions to pa# 2022-0711-8184: new washer and dryer as shown on plans. unit #16: 1-kitchen remodel. | |
| Jan 11, 2023 | Completed final sign-off Jan 2023 | 921 Dolores St | Block 12 Construction | to comply with nov# 2022969470: non street facing ext siding repairs/plywood.Details
to comply with nov# 2022969470: non street facing ext siding repairs/plywood. | $45,000 |
| Dec 21, 2022 | Never finaled filed Dec 2022, never issued | 3146 Divisadero St | Block 12 Construction | per adu ordinance# 162-16, conversion of groun level garage & storage to 3 new adu, laundry & mechanical.Details
per adu ordinance# 162-16, conversion of groun level garage & storage to 3 new adu, laundry & mechanical. | $450,000 |
| Nov 2, 2022 | Completed final sign-off Mar 2023 | 219 Brannan St | Block 12 Construction | interior demolition of existing commercial space partiions. no new finishers. no changes to occupancy or egress.Details
interior demolition of existing commercial space partiions. no new finishers. no changes to occupancy or egress. | $15,000 |
| Oct 14, 2022 | Completed final sign-off Jul 2023 | 145 Laurel St | Block 12 Construction | phase v: apartment remodel. (4) kithen (2) bathrooms + misc.Details
phase v: apartment remodel. (4) kithen (2) bathrooms + misc. | $250,000 |
| Sep 14, 2022 | Never finaled issued Jan 2023, no final | 219 Brannan St | Block 12 Construction | demolish non bearing walls in (e) kitchen. construct (n) non bearing walls and doors. add 1 (n) ada toilet and remodel (e) ada toilet . new finishes as noted on plans. construct (n) mezzanine and (n) stair. all work to be done as design/build, seperate permits for electrical, mechanical, sprinklersDetails
demolish non bearing walls in (e) kitchen. construct (n) non bearing walls and doors. add 1 (n) ada toilet and remodel (e) ada toilet . new finishes as noted on plans. construct (n) mezzanine and (n) stair. all work to be done as design/build, seperate permits for electrical, mechanical, sprinklers | $150,000 |
| Jul 11, 2022 | Completed final sign-off Aug 2023 | 145 Laurel St | Block 12 Construction | phase 5 - new washer/elec dryer for individual units.Details
phase 5 - new washer/elec dryer for individual units. | $90,000 |
| Jun 16, 2022 | Completed final sign-off Jan 2023 | 3741 Buchanan St | Block 12 Construction | repair water damage in front bat windows from leaking decks above. replace in-kind all water damaged materials and finishes. all facilities are ada compliant, see pa# 201403181047 for ada upgrades.Details
repair water damage in front bat windows from leaking decks above. replace in-kind all water damaged materials and finishes. all facilities are ada compliant, see pa# 201403181047 for ada upgrades. | $15,000 |
| Mar 17, 2022 | Completed final sign-off Feb 2023 | 3146 Divisadero St | Block 12 Construction | unit #202: unit kitchen and bathroom remodel. in kind no str. workDetails
unit #202: unit kitchen and bathroom remodel. in kind no str. work | $40,000 |
| Mar 17, 2022 | Completed final sign-off Feb 2023 | 3146 Divisadero St | Block 12 Construction | unit #302: one kitchen and one bathroom remodel in kindDetails
unit #302: one kitchen and one bathroom remodel in kind | $40,000 |
| Mar 17, 2022 | Completed final sign-off Feb 2023 | 3146 Divisadero St | Block 12 Construction | unit 103: kitchen and bathroom remodel in kindDetails
unit 103: kitchen and bathroom remodel in kind | $40,000 |
| Mar 17, 2022 | Never finaled issued Mar 2022, no final | 3146 Divisadero St | Block 12 Construction | unit #201: unit kitchen and bathroom remodel in-kind, no str. work.Details
unit #201: unit kitchen and bathroom remodel in-kind, no str. work. | $40,000 |
| Mar 17, 2022 | Completed final sign-off Feb 2023 | 3146 Divisadero St | Block 12 Construction | unit 203: kitchen & bathroom remodel in kindDetails
unit 203: kitchen & bathroom remodel in kind | $40,000 |
| Mar 17, 2022 | Completed final sign-off Feb 2023 | 3146 Divisadero St | Block 12 Construction | unit 204: kitchen & bathroom remodel in kindDetails
unit 204: kitchen & bathroom remodel in kind | $40,000 |
| Mar 17, 2022 | Completed final sign-off Feb 2023 | 3146 Divisadero St | Block 12 Construction | unit 101: kitchen and bathroom remodel in kindDetails
unit 101: kitchen and bathroom remodel in kind | $40,000 |
| Mar 17, 2022 | Completed final sign-off Feb 2023 | 3146 Divisadero St | Block 12 Construction | unit #304: ome kitchen and one bathroom remodel in kindDetails
unit #304: ome kitchen and one bathroom remodel in kind | $40,000 |
| Mar 17, 2022 | Completed final sign-off Feb 2023 | 3146 Divisadero St | Block 12 Construction | unit 102: kitchen and bathroom remodel in kindDetails
unit 102: kitchen and bathroom remodel in kind | $40,000 |
| Mar 17, 2022 | Completed final sign-off Feb 2023 | 3146 Divisadero St | Block 12 Construction | unit #303: one kitchen and one bathroom remodel in kindDetails
unit #303: one kitchen and one bathroom remodel in kind | $40,000 |
| Mar 17, 2022 | Never finaled issued Mar 2022, no final | 3146 Divisadero St | Block 12 Construction | unit 301: kitchen & bathroom remodel in kindDetails
unit 301: kitchen & bathroom remodel in kind | $40,000 |
| Mar 17, 2022 | Completed final sign-off Mar 2022 | 31 Harriet St | Block 12 Construction | to obtain final inspection for work approved under pa#201704053197. all work is complete.Details
to obtain final inspection for work approved under pa#201704053197. all work is complete. | |
| Mar 17, 2022 | Completed final sign-off Feb 2023 | 3146 Divisadero St | Block 12 Construction | unit #104: unit kitchen and bathroom remodel in kind, no str. work.Details
unit #104: unit kitchen and bathroom remodel in kind, no str. work. | $40,000 |
| Feb 10, 2022 | Never finaled issued Jun 2022, no final | 2050 Chestnut St | Block 12 Construction | demoltin of extg store front glazing and entry doors. construction of new storefront and entry doors for ada compliant. no change to egress or occupancy. addtion of new ada complaint single occupancy toilet.Details
demoltin of extg store front glazing and entry doors. construction of new storefront and entry doors for ada compliant. no change to egress or occupancy. addtion of new ada complaint single occupancy toilet. | $160,000 |
| Dec 22, 2021 | Completed final sign-off Jan 2022 | 1 Mallorca Wy | Block 12 Construction | administrative permi tonly. no plans permit. revision to bid #202104229126 to legalize (78) installed aluminum clad wood double hung windows, visible from street on mallorca & chestnut.Details
administrative permi tonly. no plans permit. revision to bid #202104229126 to legalize (78) installed aluminum clad wood double hung windows, visible from street on mallorca & chestnut. | |
| Dec 17, 2021 | Completed final sign-off Feb 2024 | 1 Mallorca Wy | Block 12 Construction | replace (e) failed concrete slab and hct curbs at commercial space w/ (n) lowered slab to provide increased headroomDetails
replace (e) failed concrete slab and hct curbs at commercial space w/ (n) lowered slab to provide increased headroom | $50,000 |
| Nov 3, 2021 | Completed final sign-off Feb 2024 | 1 Mallorca Wy | Block 12 Construction | field revision to fdn work @ grade: remove (e) collum pad ftss & from continue grade bms. revision to 201506098533 & 201905100348Details
field revision to fdn work @ grade: remove (e) collum pad ftss & from continue grade bms. revision to 201506098533 & 201905100348 | $10 |
| Oct 27, 2021 | Completed final sign-off Apr 2024 | 1 Mallorca Wy | Block 12 Construction | to comply with nov#202182686. remodel (e) apt levels 1,2,3. new interior wood shear walls, new floor framing & foundation modification as req'd for remodel. replace (e) damaged roof at north garage. coord. work with soft story strengthening per previous permit 201905100348Details
to comply with nov#202182686. remodel (e) apt levels 1,2,3. new interior wood shear walls, new floor framing & foundation modification as req'd for remodel. replace (e) damaged roof at north garage. coord. work with soft story strengthening per previous permit 201905100348 | $900,000 |
| Oct 8, 2021 | Completed final sign-off Feb 2024 | 1 Mallorca Wy | Block 12 Construction | temporary shoring of (e) floor level 1. wood framing at (e) ground level garagesDetails
temporary shoring of (e) floor level 1. wood framing at (e) ground level garages | $49,000 |
| Aug 3, 2021 | Completed final sign-off Nov 2022 | 770 Golden Gate Av | Block 12 Construction | t.i. for new atm lobby and equipment room. work includes interior partitions, lighting, electrical, floor/ceiling, wall finish, entrance door in extg opening. no additional area, no change in occupancyDetails
t.i. for new atm lobby and equipment room. work includes interior partitions, lighting, electrical, floor/ceiling, wall finish, entrance door in extg opening. no additional area, no change in occupancy | $18,000 |
| Aug 2, 2021 | Never finaled issued Aug 2021, no final | 2101 California St | Block 12 Construction | unit #2: ref pa# 202107194614. structural work only. relocate walls as required for apartment unit #2 remodel. install new lower storage level post & foundation for (e) beam support.Details
unit #2: ref pa# 202107194614. structural work only. relocate walls as required for apartment unit #2 remodel. install new lower storage level post & foundation for (e) beam support. | $12,000 |
| Jul 19, 2021 | Never finaled issued Aug 2021, no final | 2101 California St | Block 12 Construction | unit #4: remodel a existing residential unit. removal of walls as indicated on sheet a1.0 of plan construction of new walls as indicated on sheet a1.0 of plan new cabinets, appliances, plumbing fixtures, lights, electric receptacles, lighting and ventilation.Details
unit #4: remodel a existing residential unit. removal of walls as indicated on sheet a1.0 of plan construction of new walls as indicated on sheet a1.0 of plan new cabinets, appliances, plumbing fixtures, lights, electric receptacles, lighting and ventilation. | $48,000 |
| Jul 19, 2021 | Never finaled issued Jul 2021, no final | 2101 California St | Block 12 Construction | unit 2 - 1st flr: remodel 1 (e) residential unit. removal of wall as indicated on sheet a1.0 of plan, construct new walls, new cabinet, appliances, fixtures, and finishes. new elec recepts, comm outlets lighting and ventilation. convert (e) living to bedroom. add new half bath.Details
unit 2 - 1st flr: remodel 1 (e) residential unit. removal of wall as indicated on sheet a1.0 of plan, construct new walls, new cabinet, appliances, fixtures, and finishes. new elec recepts, comm outlets lighting and ventilation. convert (e) living to bedroom. add new half bath. | $48,000 |
| Jul 19, 2021 | Completed final sign-off Dec 2021 | 990 Bay St | Block 12 Construction | demo of (e) kitchen/construc of new kitchen removal of non structural walls as indicated on sheet a1.0, construc of non structural walls as indicated on sheet a1.0 new cabinets, appliances, plumbing fixtures and finishes, new recepts. convert (e) dining rm to bedroom. fa under sep permit if applic.Details
demo of (e) kitchen/construc of new kitchen removal of non structural walls as indicated on sheet a1.0, construc of non structural walls as indicated on sheet a1.0 new cabinets, appliances, plumbing fixtures and finishes, new recepts. convert (e) dining rm to bedroom. fa under sep permit if applic. | $48,000 |
| Jul 7, 2021 | Never finaled issued Jul 2021, no final | 801 Fillmore St | Block 12 Construction | unit 6: move bearing wall and replace w/ lvl beam, remodel bedrooms, kitchen, living rooms, new cabs, appiances, plumbing fixtures, finishes, lights, and ventilation, new post and concrete pad at garage, no change at batroom paint onlyDetails
unit 6: move bearing wall and replace w/ lvl beam, remodel bedrooms, kitchen, living rooms, new cabs, appiances, plumbing fixtures, finishes, lights, and ventilation, new post and concrete pad at garage, no change at batroom paint only | $75,000 |
| May 28, 2021 | Completed final sign-off Nov 2021 | 575 Pierce St | Block 12 Construction | #403 remodel. removal of non-structural walls. new kitchen cabs, appliances, finishes, fixtures, new electrical plugs/switchesDetails
#403 remodel. removal of non-structural walls. new kitchen cabs, appliances, finishes, fixtures, new electrical plugs/switches | $49,000 |
| May 27, 2021 | Completed final sign-off Dec 2021 | 801 Fillmore St | Block 12 Construction | revision to 202104198819: removal non-structural wall on sheet a.1.0 to demo walls to be verified as bearing or non-bearing walls by structural engineer. structural mitigation as necessary.Details
revision to 202104198819: removal non-structural wall on sheet a.1.0 to demo walls to be verified as bearing or non-bearing walls by structural engineer. structural mitigation as necessary. | |
| May 26, 2021 | In progress issued Jul 2025 | 1460 Golden Gate Av | Block 12 Construction | phase ii construction of 2 adu's per ordinance no. 162-16 for units c & d. reference permit no. 2019-0823-9650 r1 for phase i units a & b.Details
phase ii construction of 2 adu's per ordinance no. 162-16 for units c & d. reference permit no. 2019-0823-9650 r1 for phase i units a & b. | $120,000 |
| May 11, 2021 | Completed final sign-off Nov 2021 | 575 Pierce St | Block 12 Construction | unit 403: in kind kitchen and bath remodelDetails
unit 403: in kind kitchen and bath remodel | $49,000 |
| May 6, 2021 | Completed final sign-off Apr 2022 | 4193 24th St | Block 12 Construction | tenant improvement: non-structural t.i. of (e) commercial space & new ada restroom. bicycle shop changed to medical services/optometry. not a formula retailDetails
tenant improvement: non-structural t.i. of (e) commercial space & new ada restroom. bicycle shop changed to medical services/optometry. not a formula retail | $75,000 |
| May 4, 2021 | Completed final sign-off Feb 2024 | 1 Mallorca Wy | Block 12 Construction | #101: in kind kitchen/bath remodel. new electrical and plumbing fixturesDetails
#101: in kind kitchen/bath remodel. new electrical and plumbing fixtures | $49,000 |
| May 4, 2021 | Completed final sign-off Feb 2024 | 1 Mallorca Wy | Block 12 Construction | exterior repairs and dry rot repairs. no frontDetails
exterior repairs and dry rot repairs. no front | $49,000 |
| Apr 19, 2021 | Completed final sign-off Oct 2021 | 575 Pierce St | Block 12 Construction | in kind kitchen and bath remodelDetails
in kind kitchen and bath remodel | $49,000 |
| Apr 19, 2021 | Completed final sign-off Dec 2021 | 801 Fillmore St | Block 12 Construction | in kind kitchen and bath remodelDetails
in kind kitchen and bath remodel | $49,000 |
| Apr 15, 2021 | Completed final sign-off Apr 2021 | 2160 Fell St | Block 12 Construction | unit #104: administrative permit to correct unit # from 102 to 104. original pa# 202002255272, issued on 3/4/2020.Details
unit #104: administrative permit to correct unit # from 102 to 104. original pa# 202002255272, issued on 3/4/2020. | |
| Apr 12, 2021 | Completed final sign-off Jul 2021 | 990 Bay St | Block 12 Construction | ste. 204 reno of (e) kitchen - reno of (e) bathroom, reno non structural wall on sheet a1.0 new cabinets appliances.Details
ste. 204 reno of (e) kitchen - reno of (e) bathroom, reno non structural wall on sheet a1.0 new cabinets appliances. | $30,000 |
| Apr 12, 2021 | Completed final sign-off Mar 2022 | 2101 California St | Block 12 Construction | unit #1: revision to pa# 202102104366. relocate walls walls for remodel. convert 1 bedroom unit to 2 bedrom unit.Details
unit #1: revision to pa# 202102104366. relocate walls walls for remodel. convert 1 bedroom unit to 2 bedrom unit. | $49,000 |
| Mar 16, 2021 | Never finaled issued Mar 2021, no final | 2160 Fell St | Block 12 Construction | unit 203: bathroom mold damage repair. no changes to walls or layout.Details
unit 203: bathroom mold damage repair. no changes to walls or layout. | $5,000 |
| Feb 10, 2021 | Expired or cancelled cancelled Feb 2021 | 990 Bay St | Block 12 Construction | unit#204: remodel in-kind kitchen/bath. new kitchen applicances,finishes. new electric plugs/panel/switches.Details
unit#204: remodel in-kind kitchen/bath. new kitchen applicances,finishes. new electric plugs/panel/switches. | $49,000 |
| Feb 10, 2021 | Completed final sign-off Mar 2022 | 2101 California St | Block 12 Construction | unit #1: in kin kitchen/bath remodel. new kitchen/bath appliances. new electric plugs/swithches/panel.Details
unit #1: in kin kitchen/bath remodel. new kitchen/bath appliances. new electric plugs/swithches/panel. | $49,000 |
| Feb 3, 2021 | Completed final sign-off Jul 2021 | 990 Bay St | Block 12 Construction | unit 204 - unit remodel in kind kitchen and bath. new appliances finishes. new elec plugs/switches/panel. minor dry rot repair. no removal of walls or creation of new openingsDetails
unit 204 - unit remodel in kind kitchen and bath. new appliances finishes. new elec plugs/switches/panel. minor dry rot repair. no removal of walls or creation of new openings | $49,000 |
| Feb 3, 2021 | Never finaled issued Feb 2021, no final | 801 Fillmore St | Block 12 Construction | unit 1 - remodel in kind kitchen and bath. new appliances finishes. new elec plugs, switches, panel. minor dry rot repairs. no removal of walls or creation of new openingsDetails
unit 1 - remodel in kind kitchen and bath. new appliances finishes. new elec plugs, switches, panel. minor dry rot repairs. no removal of walls or creation of new openings | $49,000 |
| Jan 28, 2021 | Expired or cancelled cancelled Mar 2024 | 152 16th Av | Block 12 Construction | in kind kitchen & bath remodel. no changes to walls, minor dryrot repairs. approx 15 sq ft.Details
in kind kitchen & bath remodel. no changes to walls, minor dryrot repairs. approx 15 sq ft. | $40,000 |
| Nov 28, 2020 | In progress issued Jul 2024 | 2160 Fell St | Block 12 Construction | reconfiguration of rear of g/f parking/storage to 3 new adus, preservation of 1 garage parking space, new conc ret wall patio @ rear new conc star on grade to yard, reconfgurered stair @ main entry, curb cut @ west driverway eliminated. seismic strengthening under separate permit 202011289777.Details
reconfiguration of rear of g/f parking/storage to 3 new adus, preservation of 1 garage parking space, new conc ret wall patio @ rear new conc star on grade to yard, reconfgurered stair @ main entry, curb cut @ west driverway eliminated. seismic strengthening under separate permit 202011289777. | $150,000 |
| Nov 28, 2020 | In progress issued Jul 2024 | 2150 Fell St | Block 12 Construction | reconfiguration of rear of g/f parking/storage to a new adu, new conc ret wall & rear w/ conc star on grade to yard, no change @ sidewalk/curb. seismic strengthening under separate permit 202011289773.Details
reconfiguration of rear of g/f parking/storage to a new adu, new conc ret wall & rear w/ conc star on grade to yard, no change @ sidewalk/curb. seismic strengthening under separate permit 202011289773. | $50,000 |
| Nov 28, 2020 | Never finaled issued Mar 2022, no final | 2150 Fell St | Block 12 Construction | mandatory seismic strengthening for tier 3 structure per sfbbc ch 4 as amended by ab 107, design base shear for 75% cbc @ target story, steel cant col & moment frame @ front, ply shearwalls @ int w/ conc ftgs, (h) ply & a.b.s. @ (e)a.b.s. @ (e) walls as required.Details
mandatory seismic strengthening for tier 3 structure per sfbbc ch 4 as amended by ab 107, design base shear for 75% cbc @ target story, steel cant col & moment frame @ front, ply shearwalls @ int w/ conc ftgs, (h) ply & a.b.s. @ (e)a.b.s. @ (e) walls as required. | $100,000 |