Eric Cox
- Listed as
- architect, engineer
- Firm
- Kembcon Corp.
- Based in
- Burlingame
- On San Francisco permits
- Dec 2004 to Jul 2026
25 permits since 2000 (engineer on 23 permits, architect on 2 permits): 17 completed, 3 in progress, 3 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 9, 2026 | In progress issued Jul 2026 | 656 Douglass St | Reliable Construction Inc | top unit main floor & roof: a new kitchen, new laundry , new pantry, new windows and doors at the rear facade, new heating and cooling unit. remodel of a few non-structural interior walls and a raised ceiling in the new living room. set incluses structural engineering and title 24 information.Details
top unit main floor & roof: a new kitchen, new laundry , new pantry, new windows and doors at the rear facade, new heating and cooling unit. remodel of a few non-structural interior walls and a raised ceiling in the new living room. set incluses structural engineering and title 24 information. | $75,000 |
| Feb 10, 2026 | In progress filed Feb 2026, not yet issued | 1636 Revere Av | converting storage/garage space into a new adu, legalize built bathroom in garage area, add firewalls around water boiler heater and complying with nov# 202200444.Details
converting storage/garage space into a new adu, legalize built bathroom in garage area, add firewalls around water boiler heater and complying with nov# 202200444. | $20,000 | |
| Jan 30, 2026 | In progress issued Aug 2026 | 2461 Washington St | L H Construction | enlarge existing garage door openingDetails
enlarge existing garage door opening | $42,000 |
| Nov 26, 2025 | Completed final sign-off Jul 2026 | 44 Sheridan St | Bare Foot Builder | revision to pa # 2025-1030-8515: install new 4 x 12 psl beam & specd hardware for attachmentDetails
revision to pa # 2025-1030-8515: install new 4 x 12 psl beam & specd hardware for attachment | |
| Jun 8, 2022 | Completed final sign-off Dec 2022 | 81 Seal Rock Dr | Glam Construction Inc. | full bath remodel. infill (e) lightwell, replace (e) skylight w/in-kind. add steam shower upgrade & relocate tub toilet & plumbing. remove (e) window. replace (e) bathrm fan & duct to exterior. partial demo of ceiling & ceiling joist & reframe. plumbing & electrical to code. new interior finishes.Details
full bath remodel. infill (e) lightwell, replace (e) skylight w/in-kind. add steam shower upgrade & relocate tub toilet & plumbing. remove (e) window. replace (e) bathrm fan & duct to exterior. partial demo of ceiling & ceiling joist & reframe. plumbing & electrical to code. new interior finishes. | $10,000 |
| Dec 10, 2021 | Completed final sign-off Jan 2023 | 86 Fair Oaks St | Keaveney Construction | convert lower level storage to habitable space, new stair from upper level, create laundry, office, bath & living room @ lower level. voluntary seismic upgrade, excavate new landscaping step and patio at rear yardDetails
convert lower level storage to habitable space, new stair from upper level, create laundry, office, bath & living room @ lower level. voluntary seismic upgrade, excavate new landscaping step and patio at rear yard | $101,000 |
| Dec 5, 2019 | Completed final sign-off Nov 2021 | 64 Lamartine St | Tyson Bruce Construction | revision to pa 2019-0327-6411 move footing 3' on existing beamDetails
revision to pa 2019-0327-6411 move footing 3' on existing beam | $1,000 |
| Mar 27, 2019 | Completed final sign-off Nov 2021 | 64 Lamartine St | Tyson Bruce Construction | add unit per ord 95-17. add ground floor unit to garage.Details
add unit per ord 95-17. add ground floor unit to garage. | $85,000 |
| Nov 30, 2018 | Never finaled issued Feb 2019, no final | 2114 Fillmore St | Ardo Construction Co. | remodel part of (e) 1st flr plan. non structural workDetails
remodel part of (e) 1st flr plan. non structural work | $75,000 |
| Jul 3, 2018 | Completed final sign-off Oct 2019 | 1142 Alabama St | Bradford Construction | ref pa# 201605066760; sturctural addendum- removing permitted wood beam to steelDetails
ref pa# 201605066760; sturctural addendum- removing permitted wood beam to steel | $20,000 |
| Jun 8, 2018 | Completed final sign-off Dec 2018 | 142 Cerritos Av | Systems Paving Inc | build engineered retaining wall with pillars, stairs, railing and trellisDetails
build engineered retaining wall with pillars, stairs, railing and trellis | $30,000 |
| Jun 26, 2017 | Expired or cancelled cancelled Jan 2026 | 789 Buena Vista West Av | soft story retrofit per sfebc chapter 4d , 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d , 2016 cebc appendix a-4. | $50,000 | |
| Jan 31, 2017 | Completed final sign-off Oct 2017 | 1201 Tennessee St | Devcon Construction | revision pa #201312234917 for stairs & railings sturctural detail & calculations & shop drawings. n/a maher ordinanceDetails
revision pa #201312234917 for stairs & railings sturctural detail & calculations & shop drawings. n/a maher ordinance | |
| Jan 12, 2015 | Completed final sign-off Mar 2015 | 39 Lake St | S F Bay Construction Inc | board of appeal no. 14-188. dated on 12-30-14 for p/a#2014/08/29/5065.Details
board of appeal no. 14-188. dated on 12-30-14 for p/a#2014/08/29/5065. | $6,000 |
| Jan 12, 2015 | Completed final sign-off Aug 2015 | 341 Mississippi St | S F Bay Construction Inc | kitchen remodel, add upstairs bathroom & structural improvement.Details
kitchen remodel, add upstairs bathroom & structural improvement. | $45,000 |
| Feb 24, 2014 | Never finaled issued May 2014, no final | 2734 Gough St | All Star Team Construction | revision to pa# 201312244991 structural upgrade, window replacement (wood exterior pairs of dbl hung at front; clad at other locations), add fireplace.Details
revision to pa# 201312244991 structural upgrade, window replacement (wood exterior pairs of dbl hung at front; clad at other locations), add fireplace. | $42,000 |
| Dec 24, 2013 | Never finaled issued Jan 2014, no final | 2734 Gough St | add (n) bathrooms on both units. add (n) master bedroom on upper unit, add closet on upper unit. and remodel both kitchens on both units.Details
add (n) bathrooms on both units. add (n) master bedroom on upper unit, add closet on upper unit. and remodel both kitchens on both units. | $85,000 | |
| Dec 19, 2013 | Completed final sign-off Jan 2015 | 1100 Ocean Av | Cahill Contractors Inc | metal stairs. ref. to pa #201203015201Details
metal stairs. ref. to pa #201203015201 | $50,000 |
| Mar 21, 2013 | Completed final sign-off Jun 2013 | 349 Banks St | revision to appl #2012.1129.5100 to include structural drawing & calculations.Details
revision to appl #2012.1129.5100 to include structural drawing & calculations. | $1,000 | |
| Oct 22, 2012 | Completed final sign-off Aug 2013 | 21 Sargent St | J & L Construction Co. | to replace existing front stairs with new stairs.Details
to replace existing front stairs with new stairs. | $12,000 |
| Sep 25, 2009 | Completed final sign-off Dec 2009 | 1828 Page St | Pegasus Building/Castle Construction | replaceing eroding beam above drivweay & garage.Details
replaceing eroding beam above drivweay & garage. | $5,000 |
| Jan 31, 2006 | Expired or cancelled cancelled Mar 2007 | 132 Elsie St | repair foundation damage due to over excavation of 138 elsie st. (next door neighbor)Details
repair foundation damage due to over excavation of 138 elsie st. (next door neighbor) | $50,000 | |
| Jun 28, 2005 | Completed final sign-off Nov 2007 | 1560 Pacific Av | City Building Inc. | seismic upgrade of unreinforded masonry building. general procedure.Details
seismic upgrade of unreinforded masonry building. general procedure. | $80,000 |
| Apr 25, 2005 | Completed final sign-off Aug 2005 | 638 Athens St | revise scope of work on app#200406116219. to increase percentage of lathe and plaster removed toDetails
revise scope of work on app#200406116219. to increase percentage of lathe and plaster removed to | $3,000 | |
| Dec 23, 2004 | Completed final sign-off May 2005 | 66 07th Av | Keen Construction Incorporated | remodel kitchen, new header on bearing wallDetails
remodel kitchen, new header on bearing wall | $30,000 |