Edward Ries
- Listed as
- architect, engineer
- Firm
- Salas O'brien Engineers
- Based in
- San Jose
- On San Francisco permits
- Nov 2005 to Nov 2011
9 permits since 2000 (engineer on 7 permits, architect on 2 permits): 9 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 14, 2011 | Completed final sign-off Aug 2012 | 1 Mccoppin St | Roebbelen Contracting Inc | install new chiller at rooftop. install structural framing to support new chiller cac.Details
install new chiller at rooftop. install structural framing to support new chiller cac. | $300,000 |
| Nov 14, 2011 | Completed final sign-off Jun 2013 | 389 09th Av | Roebbelen Contracting Inc | install new mechanical air handler to chiller and associated ductwork and pipingDetails
install new mechanical air handler to chiller and associated ductwork and piping | $500,000 |
| Mar 31, 2010 | Completed final sign-off Nov 2010 | 30 Onondaga Av | Roebbelen Contracting Inc | install acoustic screen wall (12ft high) around existing chillers for sound attenuation. includes structural steel and acoustic panels. patch and repair roof. screen wall to be painted to match building color.Details
install acoustic screen wall (12ft high) around existing chillers for sound attenuation. includes structural steel and acoustic panels. patch and repair roof. screen wall to be painted to match building color. | $75,000 |
| Feb 28, 2008 | Completed final sign-off Jan 2009 | 1930 Steiner St | Roebbelen Contracting Inc | modifications to existing hvac from roof to 2nd floor, modify basement air handler ductingDetails
modifications to existing hvac from roof to 2nd floor, modify basement air handler ducting | $194,386 |
| Feb 28, 2008 | Completed final sign-off Aug 2008 | 6150 03rd St | Roebbelen Contracting Inc | replace existing 15 ton chiller with a new 60 ton chiller. provide power ( conduit, wire, and breakers) for new chiller and pump. provide new pump for chiller. new controls for chiller and pump. new concrete housekeeping pad atop existing slab at new pump. new w16 sleeper beams at chiller.Details
replace existing 15 ton chiller with a new 60 ton chiller. provide power ( conduit, wire, and breakers) for new chiller and pump. provide new pump for chiller. new controls for chiller and pump. new concrete housekeeping pad atop existing slab at new pump. new w16 sleeper beams at chiller. | $133,400 |
| Dec 10, 2007 | Completed final sign-off Oct 2008 | 1515 19th Av | Roebbelen Contracting Inc | remove and replace basement air handling unit (ahu) with roof top unit. replumb chilled water to unit. integrate to bldg controls and fire alarm.Details
remove and replace basement air handling unit (ahu) with roof top unit. replumb chilled water to unit. integrate to bldg controls and fire alarm. | $700,000 |
| Dec 10, 2007 | Completed final sign-off Jul 2008 | 1515 19th Av | American Incorporated, Roebbelen Contracting Inc | remove and replace approx. 95 ton air cooled chiller with new 120 ton unit. upgrade electrical in kind to bring up to code and correct corrosion issues. re-integrate to ex. chilled water system. replace pump in kind if required.Details
remove and replace approx. 95 ton air cooled chiller with new 120 ton unit. upgrade electrical in kind to bring up to code and correct corrosion issues. re-integrate to ex. chilled water system. replace pump in kind if required. | $260,000 |
| Feb 7, 2007 | Completed final sign-off Dec 2007 | 611 Folsom St | replace 3 water-cooled computer room air conditioning units, install a 4th (n) matching computer room air conditioning unit. provide all service connections to the (n) units including power, duct work, condenser water, city water, condensate drain, smoke detection and controls.Details
replace 3 water-cooled computer room air conditioning units, install a 4th (n) matching computer room air conditioning unit. provide all service connections to the (n) units including power, duct work, condenser water, city water, condensate drain, smoke detection and controls. | $100,000 | |
| Nov 18, 2005 | Completed final sign-off Mar 2007 | 44 Montgomery St | City Building Inc. | 39th floor - enlarge (e) computer room & enhance both mechanical & electrical systems infrastructure to support current & future operational requirements of the computer room.Details
39th floor - enlarge (e) computer room & enhance both mechanical & electrical systems infrastructure to support current & future operational requirements of the computer room. | $1,500,000 |