Douglas Snow
- Listed as
- engineer
- Firm
- Encon Energy Conservation
- Based in
- Palo Alto
- On San Francisco permits
- May 2008 to Feb 2018
10 permits since 2000 (engineer on 10 permits): 9 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 23, 2018 | Completed final sign-off Jul 2018 | 465 California St | Northern Sun Associates | interior ti revision to 201710110969, reduction in scope, removal of coffee area at front, relocation of restroom, revision to seat layout, kitchen layout. mech change from new hood to keep e hood, relocate exhaust. revised single line diagram, panel upgdate to schedules maher not reqDetails
interior ti revision to 201710110969, reduction in scope, removal of coffee area at front, relocation of restroom, revision to seat layout, kitchen layout. mech change from new hood to keep e hood, relocate exhaust. revised single line diagram, panel upgdate to schedules maher not req | |
| Mar 31, 2017 | Completed final sign-off Sep 2018 | 272 O'farrell St | Ybj Construction Services | change of use. this project is a t.i. of an existing beauty salon (persons services) into a tea cafe (retail sales). the scope of work includes new store fron, signs, staircase, interior walls, finishes, kitchen equipment, and light fixtures. mechanical & fire protection is deferred.Details
change of use. this project is a t.i. of an existing beauty salon (persons services) into a tea cafe (retail sales). the scope of work includes new store fron, signs, staircase, interior walls, finishes, kitchen equipment, and light fixtures. mechanical & fire protection is deferred. | $110,000 |
| Mar 31, 2017 | Completed final sign-off Jan 2019 | 272 Ofarrell St | Ybj Construction Services | erect projecting, electric, double faced sign.Details
erect projecting, electric, double faced sign. | $1,500 |
| Mar 21, 2016 | Never finaled issued Apr 2016, no final | 2047 Fillmore St | Alain Hirsch Construction Corp, Michilli Inc | tenant improvement to lease line including new unisex restroom, new interior stairs, interior millworkDetails
tenant improvement to lease line including new unisex restroom, new interior stairs, interior millwork | $450,000 |
| Feb 3, 2016 | Completed final sign-off Sep 2016 | 600 Stockton St | Dean M Sailors Inc | revision to pa#201512225751 as noted on plans delta #3 as built. n/a ordinance #155-13Details
revision to pa#201512225751 as noted on plans delta #3 as built. n/a ordinance #155-13 | |
| Jan 30, 2014 | Completed final sign-off Oct 2014 | 266 King St | Terra Nova Industries | t.i. of (e) office space. 13 stories mixed use building to a new fast / casual restaurant, tender greens (e) outdoor plaza area to be designed as new outdoor patio. hvac, electrical, & plumbing upgrades. store front modification to include new single exit door, store front to match existing.Details
t.i. of (e) office space. 13 stories mixed use building to a new fast / casual restaurant, tender greens (e) outdoor plaza area to be designed as new outdoor patio. hvac, electrical, & plumbing upgrades. store front modification to include new single exit door, store front to match existing. | $250,000 |
| Nov 4, 2013 | Completed final sign-off Jan 2014 | 565 Clay St | Wells Construction Inc | alteration of existing interior. replace finsihes, cabinetry, lighting, equipment. exterior paint. any replacement shall not exceed current allowed service providedDetails
alteration of existing interior. replace finsihes, cabinetry, lighting, equipment. exterior paint. any replacement shall not exceed current allowed service provided | $350,000 |
| Sep 17, 2013 | Completed final sign-off Feb 2014 | 1390 Market St | Wells Construction Inc | t.i. to the (e) starbucks ground floor. full renovation of the (e) business, this includes, as shown on plans, replacing, finishes, ceiling, walls, cabinetry, lighting, plumbing, mechanical, electrical, equipment & a portion of (e) storefront system. sprinklers, fire alarm separate permit.Details
t.i. to the (e) starbucks ground floor. full renovation of the (e) business, this includes, as shown on plans, replacing, finishes, ceiling, walls, cabinetry, lighting, plumbing, mechanical, electrical, equipment & a portion of (e) storefront system. sprinklers, fire alarm separate permit. | $350,000 |
| Apr 14, 2009 | Completed final sign-off Nov 2009 | 360 Bay St | Turner Construction Co | demo of existing soffit and non-structural partitions, patch back ceiling, patch back flooring, new non-structural partitions, and minor electric and hvac.Details
demo of existing soffit and non-structural partitions, patch back ceiling, patch back flooring, new non-structural partitions, and minor electric and hvac. | $195,513 |
| May 29, 2008 | Completed final sign-off May 2010 | 232 Ofarrell St | Millennium Construction Group | tenant improvement, clearing of 2 retail spaces to make new demising walls, add kitchen, new toilets and interior alteration. merge retail for new restaurant.Details
tenant improvement, clearing of 2 retail spaces to make new demising walls, add kitchen, new toilets and interior alteration. merge retail for new restaurant. | $350,000 |