- May 2012 to Jun 2017
7 permits since 2000 (engineer on 6 permits, architect on 1 permit): 3 completed, 3 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Haley & Aldrich Construction Services (6), American Integrated Services Inc, Haley & Aldrich Inc
Where they worked
- Single-family 2
- Multi-family (2-family, apartments) 3
- Commercial 2
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 2, 2017 | Never finaled issued Jul 2017, no final | 32 Toledo Wy | Haley & Aldrich Construction Services | approximately 125 cubic yards of soil will be removed from the backyard at 32 toledo way. the yard will be returned to original grade after excavation.Details
approximately 125 cubic yards of soil will be removed from the backyard at 32 toledo way. the yard will be returned to original grade after excavation. | $100,000 |
| Jun 2, 2017 | Never finaled issued Jul 2017, no final | 28 Toledo Wy | Haley & Aldrich Construction Services | approximately 125 cubic yards of soil will be removed and replaced from the backyward at 28 toledo way. the yard will be returned to original grade after excavation.Details
approximately 125 cubic yards of soil will be removed and replaced from the backyward at 28 toledo way. the yard will be returned to original grade after excavation. | $100,000 |
| Aug 12, 2015 | Never finaled issued Aug 2015, no final | 1631 North Point St | Haley & Aldrich Construction Services | removal of soil from back yard to a depth of 3 feet below ground surface. backfill of the area. excavation will be done hand tools. maher required!Details
removal of soil from back yard to a depth of 3 feet below ground surface. backfill of the area. excavation will be done hand tools. maher required! | $150,000 |
| Jul 20, 2015 | Expired or cancelled withdrawn Apr 2016 | 1598 Bay St | Haley & Aldrich Construction Services | demolish existing site buildings and awning, install sheet piles surrounding excavation area, excavate to depths ranging from 4-18 ft below ground surface. backfill to previous existing grade. demo permit #201507171822. n/a ordinance #155-13Details
demolish existing site buildings and awning, install sheet piles surrounding excavation area, excavate to depths ranging from 4-18 ft below ground surface. backfill to previous existing grade. demo permit #201507171822. n/a ordinance #155-13 | $400,000 |
| Jul 17, 2015 | Completed final sign-off Oct 2018 | 1598 Bay St | Haley & Aldrich Construction Services | demolish one story of gas station.Details
demolish one story of gas station. | $50,000 |
| Apr 21, 2014 | Completed final sign-off Sep 2014 | 1539 Beach St | Haley & Aldrich Construction Services | remedial excavation of backyard supported with cdf slots. compliance with ord 155-13 not requiredDetails
remedial excavation of backyard supported with cdf slots. compliance with ord 155-13 not required | $50,000 |
| May 31, 2012 | Completed final sign-off Oct 2012 | 1555 Beach St | American Integrated Services Inc, Haley & Aldrich Inc | demo (e) hardscape features; excavate slot trenches in sequenced manner around perimeter of the property; backfill slot trenches w/ controlled density fill; slot trenches is 5 ft in depth & backfilled to 1.5 ft bgs; excavate mass interior, backfill to (e) grade; rough grading; sloping used to excavaDetails
demo (e) hardscape features; excavate slot trenches in sequenced manner around perimeter of the property; backfill slot trenches w/ controlled density fill; slot trenches is 5 ft in depth & backfilled to 1.5 ft bgs; excavate mass interior, backfill to (e) grade; rough grading; sloping used to excava | $250,000 |