- 0 permits filed
9 permits since 2000: 7 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 27, 2014 | Never finaled issued Mar 2014, no final | 1201 Illinois St | perform iss testing on 2 areas (a & b) to solidify subsurface soil. remove and replace pavement. compliance with maher ordinance #155-13 required; routed to dph.Details
perform iss testing on 2 areas (a & b) to solidify subsurface soil. remove and replace pavement. compliance with maher ordinance #155-13 required; routed to dph. | $700,000 |
| Jan 13, 2014 | Completed final sign-off May 2014 | 135 Alhambra St | demolish (e) rear hardscape/landscape features. excavate & backfill sequenced slot trenches. drill & install soldier pile & lagging. excavate max 4 ft gsg installing shoring boards, backfill to previous existing grade. compliance with ordinance #155-13 is exempt.Details
demolish (e) rear hardscape/landscape features. excavate & backfill sequenced slot trenches. drill & install soldier pile & lagging. excavate max 4 ft gsg installing shoring boards, backfill to previous existing grade. compliance with ordinance #155-13 is exempt. | $150,000 |
| Apr 29, 2013 | Expired or cancelled cancelled Mar 2020 | 28 Toledo Wy | grfill & excavate.demo(e)hardscape features,excavate slot trenches (4 ft)in sequenced along southern perimeter,backfill slot trenches w/cdf;install soldier pile & lagging around remaining perimeter; excavate about 1 ft sections to total depth of 4 ft bgs; backfill to (e) grade; sloping used to excavDetails
grfill & excavate.demo(e)hardscape features,excavate slot trenches (4 ft)in sequenced along southern perimeter,backfill slot trenches w/cdf;install soldier pile & lagging around remaining perimeter; excavate about 1 ft sections to total depth of 4 ft bgs; backfill to (e) grade; sloping used to excav | $200,000 |
| Jul 30, 2012 | Completed final sign-off Oct 2012 | 1545 Beach St | revision to appl #2012.0531.1635 - modified the planned excavation alignment.Details
revision to appl #2012.0531.1635 - modified the planned excavation alignment. | $5,000 |
| May 31, 2012 | Completed final sign-off Oct 2012 | 1549 Beach St | demo(e)hardscape features; excavate slot trenches in sequenced manner around perimeter of the property; backfill slot trenches w/ controlled density fill; slot trenches 5 ft in depth & backfilled to 1.5 ft bgs; excavate mass interior; backfill to(e)grade; rough grading; sloping used to excavate arouDetails
demo(e)hardscape features; excavate slot trenches in sequenced manner around perimeter of the property; backfill slot trenches w/ controlled density fill; slot trenches 5 ft in depth & backfilled to 1.5 ft bgs; excavate mass interior; backfill to(e)grade; rough grading; sloping used to excavate arou | $250,000 |
| May 31, 2012 | Completed final sign-off Oct 2012 | 1555 Beach St | demo (e) hardscape features; excavate slot trenches in sequenced manner around perimeter of the property; backfill slot trenches w/ controlled density fill; slot trenches is 5 ft in depth & backfilled to 1.5 ft bgs; excavate mass interior, backfill to (e) grade; rough grading; sloping used to excavaDetails
demo (e) hardscape features; excavate slot trenches in sequenced manner around perimeter of the property; backfill slot trenches w/ controlled density fill; slot trenches is 5 ft in depth & backfilled to 1.5 ft bgs; excavate mass interior, backfill to (e) grade; rough grading; sloping used to excava | $250,000 |
| May 31, 2012 | Completed final sign-off Oct 2012 | 1545 Beach St | demo (e) hardscape features; excavate slot trenches in sequenced manner around perimeter of the property; backfill slot trenches w/ controlled density fill; slot trenches is 5 ft in depth & backfilled to 1.5 ft bgs; excavate mass interior; backfill to (e) grade; rough grading; sloping used to excavaDetails
demo (e) hardscape features; excavate slot trenches in sequenced manner around perimeter of the property; backfill slot trenches w/ controlled density fill; slot trenches is 5 ft in depth & backfilled to 1.5 ft bgs; excavate mass interior; backfill to (e) grade; rough grading; sloping used to excava | $250,000 |
| May 11, 2012 | Completed final sign-off Aug 2013 | 134 Alhambra St | break out existing walkways & hardslape; install shoring; excavate 3 ft bgs; partial backfill; excavate 2nd area using sloping to total depth of 5 ft bgs; backfill to initial conditions.Details
break out existing walkways & hardslape; install shoring; excavate 3 ft bgs; partial backfill; excavate 2nd area using sloping to total depth of 5 ft bgs; backfill to initial conditions. | $50,000 |
| May 11, 2012 | Completed final sign-off Aug 2012 | 74 Mallorca Wy | break out the existing concrete walkways along sides of backyard and pattio; hand excavate 45 cubicyds of and dispose at landfill; backfill and grade to initial conditions; pour concrete walkways and pad.Details
break out the existing concrete walkways along sides of backyard and pattio; hand excavate 45 cubicyds of and dispose at landfill; backfill and grade to initial conditions; pour concrete walkways and pad. | $50,000 |