David Teeters
- Listed as
- architect, authorized agent-others, engineer
- Firm
- David Teeters, Architects
- Based in
- Alameda
- On San Francisco permits
- Mar 2003 to Oct 2023
67 permits since 2000 (architect on 63 permits, authorized agent-others on 2 permits, engineer on 2 permits): 43 completed, 12 never finaled, 12 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 27, 2023 | Completed final sign-off Mar 2024 | 145 Farnum St | Stonebridge Construction Inc | convert (e) storage & garage space to bedroom and bath, replace (e) fau with new heat pump, replace 1 window non street facing.Details
convert (e) storage & garage space to bedroom and bath, replace (e) fau with new heat pump, replace 1 window non street facing. | $85,000 |
| Mar 8, 2023 | Completed final sign-off May 2023 | 185 Evelyn Wy | Stonebridge Construction Inc | revision to pa# 202209071949, to add closet and door landing to ground flr bedroom. and framing modifcation to accommodate plumbing.Details
revision to pa# 202209071949, to add closet and door landing to ground flr bedroom. and framing modifcation to accommodate plumbing. | |
| May 24, 2021 | Completed final sign-off Apr 2022 | 2640 Steiner St | Stonebridge Construction Inc | remodel basement adjacent to garage-bedroom, bath, laundry and family room. lower flr 2" for 7.6" ceiling. replace exterior door & 3 windows(2 visible from street) in kind. add emergency egress window and window well at side yard.Details
remodel basement adjacent to garage-bedroom, bath, laundry and family room. lower flr 2" for 7.6" ceiling. replace exterior door & 3 windows(2 visible from street) in kind. add emergency egress window and window well at side yard. | $225,000 |
| Jan 15, 2021 | Completed final sign-off Dec 2021 | 342 Judson Av | remodel bathroom and add habitable space at rear of garage. add shear strengthening at garage entrance and rear bldg.Details
remodel bathroom and add habitable space at rear of garage. add shear strengthening at garage entrance and rear bldg. | $30,000 | |
| Apr 2, 2019 | Completed final sign-off May 2020 | 320 Seacliff Av | Stonebridge Construction Inc | remodel interior rebuild two bathrooms on 2nd floorDetails
remodel interior rebuild two bathrooms on 2nd floor | $115,000 |
| Mar 26, 2019 | Never finaled issued May 2019, no final | 320 Seacliff Av | Stonebridge Construction Inc | replace 11 windows with single hung marvin ultimate insert with integral ogee lugs. remodel interior.windows only permit. removal of wet bar.Details
replace 11 windows with single hung marvin ultimate insert with integral ogee lugs. remodel interior.windows only permit. removal of wet bar. | $140,000 |
| Sep 5, 2018 | Never finaled issued Sep 2018, no final | 2265 Beach St | Mulhall Construction Inc. | revision to pa 2017-1129-5058 - add transparent wall panel @ light well. eliminate dropped landing @ entry to unit relocate washer & dryer to garageDetails
revision to pa 2017-1129-5058 - add transparent wall panel @ light well. eliminate dropped landing @ entry to unit relocate washer & dryer to garage | $2,000 |
| Aug 15, 2018 | Completed final sign-off Apr 2019 | 1159 Church St | Stonebridge Construction Inc | revision to 201802221987, remove selected partitions at 2nd fl kitchen and living rmDetails
revision to 201802221987, remove selected partitions at 2nd fl kitchen and living rm | $9,500 |
| Jul 3, 2018 | Completed final sign-off Feb 2020 | 129 11th Av | Daniel Kelly Construction | remodel (e) kitchen and 3 baths. replace selected windows at rear of building, new rear deck and stairs (less than 10ft from grade), voluntary strengthening.Details
remodel (e) kitchen and 3 baths. replace selected windows at rear of building, new rear deck and stairs (less than 10ft from grade), voluntary strengthening. | $22,500 |
| Jun 20, 2018 | Never finaled issued Feb 2019, no final | 4388 23rd St | Stonebridge Construction Inc | enclose (e) exterior stair & replace with spiral stair. remodel interior. add bathroom @ 1st floor. excavate 1st floor storage to create habitable space.Details
enclose (e) exterior stair & replace with spiral stair. remodel interior. add bathroom @ 1st floor. excavate 1st floor storage to create habitable space. | $120,000 |
| May 18, 2018 | Completed final sign-off Jun 2019 | 89 Idora Av | Modern Craft Construction | interior remodel: kitchen & 2 baths, convert rear of garage to habitable space + 2 bath. excavate well for new rear door. replace selected windows.Details
interior remodel: kitchen & 2 baths, convert rear of garage to habitable space + 2 bath. excavate well for new rear door. replace selected windows. | $120,000 |
| May 2, 2018 | Completed final sign-off Apr 2019 | 1159 Church St | Stonebridge Construction Inc | new powder room. relocate tankless water heater and furnace. revision to app#201802221987Details
new powder room. relocate tankless water heater and furnace. revision to app#201802221987 | $8,000 |
| Apr 17, 2018 | Completed final sign-off Feb 2020 | 129 11th Av | Daniel Kelly Construction | new rear deck & stair to replace existing.Details
new rear deck & stair to replace existing. | $10,000 |
| Feb 22, 2018 | Completed final sign-off Apr 2019 | 1159 Church St | convert non habitable 1 st floor to habitable space. connect 1st & 2nd flr with interior stair. replace non conforming wood stair with spiral stair. rebuild kitchen porch at 2nd floor and 3rd floor. add new windows at rear north side. replace(e) window at front of 1st flrDetails
convert non habitable 1 st floor to habitable space. connect 1st & 2nd flr with interior stair. replace non conforming wood stair with spiral stair. rebuild kitchen porch at 2nd floor and 3rd floor. add new windows at rear north side. replace(e) window at front of 1st flr | $320,000 | |
| Nov 29, 2017 | Completed final sign-off Jun 2021 | 2265 Beach St | Mulhall Construction Inc. | remove boiler room at rear of building, add accessory dwelling unit at rear of garage per ordinance 162-16. soft story permit #2017-0426-4957 for reference.Details
remove boiler room at rear of building, add accessory dwelling unit at rear of garage per ordinance 162-16. soft story permit #2017-0426-4957 for reference. | $80,000 |
| May 25, 2017 | Expired or cancelled cancelled Jan 2026 | 272 Jersey St | remove living rm wall and install new beam. reinforce existing framing for bay window at front, finish to match existing.Details
remove living rm wall and install new beam. reinforce existing framing for bay window at front, finish to match existing. | $8,000 | |
| Apr 28, 2017 | Completed final sign-off Oct 2018 | 2640 Steiner St | Boughton Construction | partial interior remodel of 2nd floor, add 1/2 bath, replace (e) basement furnace, add (n) attic furnace, replace in-kind selected single-gl window w/double-gl inserts. (wood sash/true divided lites/ogee lugs).Details
partial interior remodel of 2nd floor, add 1/2 bath, replace (e) basement furnace, add (n) attic furnace, replace in-kind selected single-gl window w/double-gl inserts. (wood sash/true divided lites/ogee lugs). | $40,000 |
| Jan 10, 2017 | Never finaled issued Jul 2017, no final | 1471 05th Av | Tauscher Construction | horizontal addition at rear. remodel kitchen & half bath, new master bath. new windows at selected locations.Details
horizontal addition at rear. remodel kitchen & half bath, new master bath. new windows at selected locations. | $150,000 |
| Nov 14, 2016 | Completed final sign-off Apr 2017 | 3166 Baker St | legalize home office (room) at rear of garage - 327 sq ft of garage converted to habitatble. maher naDetails
legalize home office (room) at rear of garage - 327 sq ft of garage converted to habitatble. maher na | $20,000 | |
| Sep 2, 2016 | Completed final sign-off Nov 2017 | 163 Laidley St | Reed Design Dba Design Solutions | roof deck at 3rd fl over kitchen, kitchen remodelDetails
roof deck at 3rd fl over kitchen, kitchen remodel | $45,000 |
| Sep 1, 2016 | Completed final sign-off Nov 2017 | 163 Laidley St | Reed Design Dba Design Solutions | rev. to pa#201503312430, replace 2 walls with 2 beams.Details
rev. to pa#201503312430, replace 2 walls with 2 beams. | $5,000 |
| Jun 30, 2016 | Completed final sign-off Jul 2018 | 514 Congo St | Boughton Construction | interior remodel of bath & kitchen. horizontal addition @ rear of upper level (n) windows @ selected locations. replace asbestos siding w/ woodDetails
interior remodel of bath & kitchen. horizontal addition @ rear of upper level (n) windows @ selected locations. replace asbestos siding w/ wood | $25,000 |
| Apr 15, 2016 | Completed final sign-off Jun 2017 | 230 Prospect Av | Lynch Construction Inc | replace 12 ft wide garage door with pair of 8 ft doors. replace 12 ft wide curb cut w/ 19' curb cut.Details
replace 12 ft wide garage door with pair of 8 ft doors. replace 12 ft wide curb cut w/ 19' curb cut. | $5,500 |
| Dec 22, 2015 | Completed final sign-off Jun 2017 | 230 Prospect Av | relocate garage, remodel 2 units, convert portion of garage to habitalbe space and add to lower unit, new windows at selected location. new bathroomsDetails
relocate garage, remodel 2 units, convert portion of garage to habitalbe space and add to lower unit, new windows at selected location. new bathrooms | $370,000 | |
| Dec 7, 2015 | Completed final sign-off Oct 2016 | 2211 44th Av | San Francisco Investment Development | interior remodel, new kitchen & baths, new interior stair, convert rear of garage to bedrooms & bath, repair exterior stair, replace windows, add window. voluntory structural strengthening.Details
interior remodel, new kitchen & baths, new interior stair, convert rear of garage to bedrooms & bath, repair exterior stair, replace windows, add window. voluntory structural strengthening. | $225,000 |
| Nov 24, 2015 | Completed final sign-off Nov 2016 | 291 31st Av | interior remodel - new kitchen & bath. expansion of 1st floor family room. new interior & exterior stairs. demolition of 72% of interior walls.Details
interior remodel - new kitchen & bath. expansion of 1st floor family room. new interior & exterior stairs. demolition of 72% of interior walls. | $315,000 | |
| Sep 3, 2015 | Never finaled issued Dec 2015, no final | 2153 North Point St | add exit to street street to convert (e) in-law unit to legal 3rd unit. this permit is a revision to appln #200003245275. ** maher: n/a **Details
add exit to street street to convert (e) in-law unit to legal 3rd unit. this permit is a revision to appln #200003245275. ** maher: n/a ** | $80,000 | |
| Mar 25, 2015 | Completed final sign-off Nov 2017 | 163 Laidley St | Reed Design Dba Design Solutions | lower basement flr to make habitable clg. height. lower concrete slab at front entry. add bath & interior stair to 1 st flr. enlarge 2 windows at 3rd flrDetails
lower basement flr to make habitable clg. height. lower concrete slab at front entry. add bath & interior stair to 1 st flr. enlarge 2 windows at 3rd flr | $95,000 |
| Mar 20, 2015 | Never finaled issued Aug 2015, no final | 56 Pleasant St | Ventana 76 | interior remodel of top unit - 2 stories rebuild roof & roof deck & guardrail, infill 280 sq ft opening at 4th floor & add bath.Details
interior remodel of top unit - 2 stories rebuild roof & roof deck & guardrail, infill 280 sq ft opening at 4th floor & add bath. | $225,000 |
| Mar 4, 2015 | Never finaled issued Mar 2015, no final | 38 Cresta Vista Dr | interior remodel including kitchen and baths. additional bathroom, expand kitchen into garage 35 sq ft.Details
interior remodel including kitchen and baths. additional bathroom, expand kitchen into garage 35 sq ft. | $150,000 | |
| Oct 14, 2014 | Completed final sign-off Nov 2015 | 149 19th Av | Boughton Construction | kitchen remodel, replace window and new window.Details
kitchen remodel, replace window and new window. | $45,000 |
| Sep 22, 2014 | Completed final sign-off Jan 2016 | 1041 Filbert St | S4s Construction Inc | interior remodel: new kitchen and add 1/2 bath. add property line window. replace deteriorating extg windows as required.Details
interior remodel: new kitchen and add 1/2 bath. add property line window. replace deteriorating extg windows as required. | $110,000 |
| Jul 2, 2013 | Completed final sign-off Mar 2014 | 1239 Union St | Sf Twin Boys Corp. Dba Master Builders | add 2 new full bathrooms in (e) closetsDetails
add 2 new full bathrooms in (e) closets | $25,000 |
| Jul 30, 2012 | Completed final sign-off Mar 2015 | 3749 21st St | interior remodel. horizontal addition to 2nd floor. project bays on north & south facades. 2 story addition to west facade. roof deck / penthouse.Details
interior remodel. horizontal addition to 2nd floor. project bays on north & south facades. 2 story addition to west facade. roof deck / penthouse. | $350,000 | |
| Jul 12, 2012 | Completed final sign-off Jul 2012 | 36 Macondray Ln | for documentation purposes: two family dwelling to single family dwelling, to issues a cfc. pa 9419691 expired and was picked up by 2007 0213 4043 and then 2007 1121 8780. by mistake, a cfc was not issued at the time.Details
for documentation purposes: two family dwelling to single family dwelling, to issues a cfc. pa 9419691 expired and was picked up by 2007 0213 4043 and then 2007 1121 8780. by mistake, a cfc was not issued at the time. | ||
| May 24, 2012 | Completed final sign-off Aug 2013 | 2841 Filbert St | Caruso Construction Inc. | revisoin to appl #2012.02.23.4750 - change location of bolts @ spiral stair.Details
revisoin to appl #2012.02.23.4750 - change location of bolts @ spiral stair. | |
| Feb 23, 2012 | Completed final sign-off Aug 2013 | 2841 Filbert St | Caruso Construction Inc. | revision to p/a#200906190806. build new storage area above garage. add volumtary shear walls. revise partition layout on 3 floors. install new garage door.Details
revision to p/a#200906190806. build new storage area above garage. add volumtary shear walls. revise partition layout on 3 floors. install new garage door. | $7,000 |
| Dec 22, 2011 | Completed final sign-off Aug 2013 | 2841 Filbert St | Caruso Construction Inc. | revision to pa# 200906190806. change width of proposed stair from 32" to 31".Details
revision to pa# 200906190806. change width of proposed stair from 32" to 31". | |
| Jun 21, 2011 | Completed final sign-off Dec 2011 | 15 North View Ct | Urban Builder General Contracting Inc | revision to pa# 2011-0217-0441-structural modifications, replace wood floor, construct with concrete.Details
revision to pa# 2011-0217-0441-structural modifications, replace wood floor, construct with concrete. | |
| Jan 27, 2011 | Completed final sign-off Sep 2011 | 1105 Castro St | Boughton Construction | new kitchen,bath, laundry, den, hall on 3rd floor. remove bearing wall.Details
new kitchen,bath, laundry, den, hall on 3rd floor. remove bearing wall. | $55,000 |
| Nov 13, 2009 | Expired or cancelled expired Jun 2020 | 218 15th Av | Hemphill Const Co Inc | three story horizontal rear addition including roof deck over 1st floor. interior remodel on 2nd and 3rd floors. add dormers at rear corners of existing roofDetails
three story horizontal rear addition including roof deck over 1st floor. interior remodel on 2nd and 3rd floors. add dormers at rear corners of existing roof | $300,000 |
| Jul 2, 2009 | Expired or cancelled expired Mar 2011 | 2425 Filbert St | Hammerhead Construction | revision to approved permit apn 200812249179. change metal guardrail to wood guardrail at roof deck toward front.Details
revision to approved permit apn 200812249179. change metal guardrail to wood guardrail at roof deck toward front. | |
| Dec 24, 2008 | Expired or cancelled expired Mar 2011 | 2425 Filbert St | rebuild 2 interior stairs, refinish exterior stair, replace extg skylight. rebuild wndw wall, add parapet, replace extg skylight. remodel interior, including kchn, laundry and bathrooms. replace extg decking and guardrail at roof deckDetails
rebuild 2 interior stairs, refinish exterior stair, replace extg skylight. rebuild wndw wall, add parapet, replace extg skylight. remodel interior, including kchn, laundry and bathrooms. replace extg decking and guardrail at roof deck | $190,000 | |
| Sep 26, 2008 | Completed final sign-off Feb 2009 | 3452 Jackson St | install new hot tub into existing rear deck, remodel existing 1/2 bath & laundry, add two closets.Details
install new hot tub into existing rear deck, remodel existing 1/2 bath & laundry, add two closets. | $15,000 | |
| Jun 5, 2008 | Completed final sign-off Feb 2009 | 3452 Jackson St | Caruso Construction Inc. | revise struc. work appv'd in ap# 200512230979. 1) remove post. 2 replace shear wall w/ moment frame.Details
revise struc. work appv'd in ap# 200512230979. 1) remove post. 2 replace shear wall w/ moment frame. | $5,000 |
| Jun 4, 2008 | Completed final sign-off Aug 2008 | 282 Liberty St | to correct physical inspection 3r-5094, remove a portion of existing penthouse & repair a portion of existing stair penthouse. add door & window to stair penthouse.Details
to correct physical inspection 3r-5094, remove a portion of existing penthouse & repair a portion of existing stair penthouse. add door & window to stair penthouse. | $5,000 | |
| Feb 22, 2008 | Expired or cancelled expired Dec 2008 | 36 Macondray Ln | revision to: 200711218780 install 4 glass block windows at basement (ground level)Details
revision to: 200711218780 install 4 glass block windows at basement (ground level) | $5,000 | |
| Feb 12, 2008 | Expired or cancelled withdrawn Jun 2008 | 3452 Jackson St | place roofdeck on (e) flat roof at 3rd floor, install french doors to provide access to deck, add firewall at property line and guardrail overall.Details
place roofdeck on (e) flat roof at 3rd floor, install french doors to provide access to deck, add firewall at property line and guardrail overall. | $15,000 | |
| Nov 21, 2007 | Completed final sign-off Jan 2009 | 36 Macondray Ln | Boughton Construction | revision to appl #200702134043 & 9419691: int.remodel incl baths, on 1st, 2nd, 4th floor & kitchen on 2nd floor, replacement of selected windows. enclose 1st floor passageway & 2nd floor entry, repalce skylight & window on 2nd floor, remodel 3rd floor utility closet, repalce selected light fixturesDetails
revision to appl #200702134043 & 9419691: int.remodel incl baths, on 1st, 2nd, 4th floor & kitchen on 2nd floor, replacement of selected windows. enclose 1st floor passageway & 2nd floor entry, repalce skylight & window on 2nd floor, remodel 3rd floor utility closet, repalce selected light fixtures | $100,000 |
| Nov 6, 2007 | Completed final sign-off Apr 2008 | 173 Lower Tr | revision to pa# 2002/09/20/7078. replace (e) rear deck at 1st floor with new deck of smaller size. remove the kitchen work & reduce the size fo deck per plans.Details
revision to pa# 2002/09/20/7078. replace (e) rear deck at 1st floor with new deck of smaller size. remove the kitchen work & reduce the size fo deck per plans. | ||
| Aug 30, 2007 | Never finaled issued Sep 2007, no final | 2040 Lake St | 3rd floor-revision to appl. # 200304011181 - install new 36"w x 42"h window into proposed bedroom of 3rd floor. window not visible from street.Details
3rd floor-revision to appl. # 200304011181 - install new 36"w x 42"h window into proposed bedroom of 3rd floor. window not visible from street. | $700 | |
| Apr 26, 2007 | Completed final sign-off Apr 2009 | 180 Liberty St | Century Design & Construction | extend depth of garage under (e) 2nd floor. excavate at rear of garage & extend habitable space with new interior stairs from 2nd floor-all within perimeter of 2nd floor above. replace rear deck with new configuration. remodel kitchen & family room.Details
extend depth of garage under (e) 2nd floor. excavate at rear of garage & extend habitable space with new interior stairs from 2nd floor-all within perimeter of 2nd floor above. replace rear deck with new configuration. remodel kitchen & family room. | $325,000 |
| Nov 22, 2006 | Never finaled issued Nov 2006, no final | 1341 23rd Av | install new fire escape, this is modification of fire escape location approved for pa# 200408101187-stairs and deck under " " .Details
install new fire escape, this is modification of fire escape location approved for pa# 200408101187-stairs and deck under " " . | ||
| Sep 8, 2006 | Completed final sign-off Jul 2007 | 906 Divisadero St | remodel 1st floor retail space, provide access ramp & accessible toilet. structural strengthening, rebuild victorian facade @ 1st floor. ref 200604209489.Details
remodel 1st floor retail space, provide access ramp & accessible toilet. structural strengthening, rebuild victorian facade @ 1st floor. ref 200604209489. | $130,000 | |
| Apr 20, 2006 | Expired or cancelled expired Jul 2007 | 906 Divisadero St | replace foundation at north property line.Details
replace foundation at north property line. | ||
| Feb 28, 2006 | Never finaled issued Sep 2008, no final | 1808 Bush St | horrizontal addition at 2nd floor/garage at 1st floor with new roof deck/new foundation and driveway and retaining wall/new kchn and bathrooms/rebuild 2nd unit which was illegally removed by previous ownerDetails
horrizontal addition at 2nd floor/garage at 1st floor with new roof deck/new foundation and driveway and retaining wall/new kchn and bathrooms/rebuild 2nd unit which was illegally removed by previous owner | $285,000 | |
| Feb 3, 2006 | Completed final sign-off Sep 2006 | 2737 Steiner St | revision to 200511037273/add wet bar to 4th floor penthouse of single family residenceDetails
revision to 200511037273/add wet bar to 4th floor penthouse of single family residence | $8,000 | |
| Jan 19, 2006 | Completed final sign-off Sep 2006 | 2737 Steiner St | revision to app #200511037273/remodel extg penthouse interior/replace 4 extg alum. wndws with new windows same size and operation all windows are non property lineDetails
revision to app #200511037273/remodel extg penthouse interior/replace 4 extg alum. wndws with new windows same size and operation all windows are non property line | $28,000 | |
| Dec 23, 2005 | Expired or cancelled expired Feb 2009 | 3452 Jackson St | horizontal addition - two story rear addition.Details
horizontal addition - two story rear addition. | $150,000 | |
| Nov 3, 2005 | Completed final sign-off Sep 2006 | 2737 Steiner St | repair 4/f roof deck & guardrail, relocate dbl door, replace 1 window, add 1 window, replace windscreen.Details
repair 4/f roof deck & guardrail, relocate dbl door, replace 1 window, add 1 window, replace windscreen. | $23,000 | |
| Sep 2, 2005 | Expired or cancelled expired Apr 2023 | 914 Divisadero St | interior remodel garage & driveway.Details
interior remodel garage & driveway. | $160,000 | |
| Aug 18, 2005 | Never finaled issued Aug 2006, no final | 914 Divisadero St | rear deck & stairs. garage under separate permit.Details
rear deck & stairs. garage under separate permit. | $40,000 | |
| Jan 20, 2005 | Expired or cancelled expired Nov 2008 | 1232 Chestnut St | unit# 1232 only - 2 new windowsDetails
unit# 1232 only - 2 new windows | $5,000 | |
| Nov 24, 2004 | Expired or cancelled expired Feb 2006 | 1700 Page St | repalce (e) wd fence & gate w/(n) metal gateDetails
repalce (e) wd fence & gate w/(n) metal gate | $3,500 | |
| Aug 10, 2004 | Never finaled issued Oct 2006, no final | 1341 23rd Av | Boughton Construction | 3 story rear addition horiz (n) garage doorDetails
3 story rear addition horiz (n) garage door | $275,000 |
| May 12, 2004 | Completed final sign-off Jun 2005 | 3452 Jackson St | ues (e) window header to instal (n0 door to deck demo (e) rear deck & replcae w/(n) deck. add ***Details
ues (e) window header to instal (n0 door to deck demo (e) rear deck & replcae w/(n) deck. add *** | $12,000 | |
| Mar 14, 2003 | Expired or cancelled expired Nov 2003 | 1450 Folsom St | non structural , interior alterations with h.c access barrier removal. no change of use or occupancyDetails
non structural , interior alterations with h.c access barrier removal. no change of use or occupancy | $20,000 |