Daria Kugay
- Listed as
- contractor, designer
- Firm
- Mars Construction And Remodeling
- Based in
- Concord
- On San Francisco permits
- Aug 2024 to Jul 2026
14 permits since 2000 (contractor on 14 permits, designer on 1 permit): 7 completed, 7 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 14, 2026 | In progress issued Jul 2026 | 74 Vista Verde Ct | Mars Construction And Remodeling | like for like bathroom remodel update plumbing and electrical up to code.Details
like for like bathroom remodel update plumbing and electrical up to code. | $22,000 |
| Jun 30, 2026 | In progress issued Jul 2026 | 64 Sanchez St | Mars Construction And Remodeling | to obtain final inspetion for work approved under pa# 202506188945. all work is complete.Details
to obtain final inspetion for work approved under pa# 202506188945. all work is complete. | |
| Jun 30, 2026 | In progress issued Jul 2026 | 64 Sanchez St | Mars Construction And Remodeling | to obtain final inspection for work approved under pa# 202506189017. all work is complete.Details
to obtain final inspection for work approved under pa# 202506189017. all work is complete. | |
| Apr 13, 2026 | Completed final sign-off Aug 2026 | 420 Stanyan St | Mars Construction And Remodeling | unit 3: remodel two bathrooms, one with shower, one with tub, repair plumbing and electrical as necessary, new flooring in hallways.Details
unit 3: remodel two bathrooms, one with shower, one with tub, repair plumbing and electrical as necessary, new flooring in hallways. | $55,000 |
| Feb 23, 2026 | Completed final sign-off Jul 2026 | 3559 17th St | Mars Construction And Remodeling | 2nd floor:work in 3559a 17th st : int bathroom remodel including demo of existing fixture & finishes. installation of new shower pan & waterproofing system. relocation of plumbing fixtures. new electrical & fixtures. install of new vanity & toilet. intall new window & related framing in-kind.Details
2nd floor:work in 3559a 17th st : int bathroom remodel including demo of existing fixture & finishes. installation of new shower pan & waterproofing system. relocation of plumbing fixtures. new electrical & fixtures. install of new vanity & toilet. intall new window & related framing in-kind. | $30,000 |
| Feb 3, 2026 | Completed final sign-off Aug 2026 | 156 San Juan Av | Mars Construction And Remodeling | new heat pump. bathroom remodel. provide min 3" support pad for hpDetails
new heat pump. bathroom remodel. provide min 3" support pad for hp | $27,230 |
| Dec 3, 2025 | Completed final sign-off Feb 2026 | 2722 Judah St | Mars Construction And Remodeling | bathroom remodel w/ removal of partition non-load bearing walls,doors (e) shower enclosure,vanity,toilet & closet.relocation of vanity,large showers,(n) toilet,washer& dryer. (n) tile vanity,lights mirrors,plumbing fixtures,paint,gfci outlets,ceiling fan w/ humidity sensor.Details
bathroom remodel w/ removal of partition non-load bearing walls,doors (e) shower enclosure,vanity,toilet & closet.relocation of vanity,large showers,(n) toilet,washer& dryer. (n) tile vanity,lights mirrors,plumbing fixtures,paint,gfci outlets,ceiling fan w/ humidity sensor. | $34,000 |
| Aug 19, 2025 | In progress issued Sep 2025 | 64 Sanchez St | Mars Construction And Remodeling | revision to pa #202410032291. structural changes and new structural plans; relocation of washer/dryer, kitchen layout update; subpanel relocation, stair case height adjustmentDetails
revision to pa #202410032291. structural changes and new structural plans; relocation of washer/dryer, kitchen layout update; subpanel relocation, stair case height adjustment | $15,000 |
| Jun 18, 2025 | In progress issued Jun 2025 | 64 Sanchez St | Mars Construction And Remodeling | new bedroom to be added to existing 1st flr.Details
new bedroom to be added to existing 1st flr. | $10,000 |
| Jun 18, 2025 | In progress issued Jun 2025 | 64 Sanchez St | Mars Construction And Remodeling | in-kind kitchen remodel. replace counter, cabinets, sink in the same location.Details
in-kind kitchen remodel. replace counter, cabinets, sink in the same location. | $20,000 |
| Oct 16, 2024 | Completed final sign-off Feb 2025 | 340 Ritch St | Mars Construction And Remodeling | unit 5: addition of half bath on the lower level with new vanity, fan, lights, switches, toilet. includes 2 walls and one door.Details
unit 5: addition of half bath on the lower level with new vanity, fan, lights, switches, toilet. includes 2 walls and one door. | $15,000 |
| Oct 10, 2024 | Completed final sign-off Apr 2025 | 1783 San Jose Av | Mars Construction And Remodeling | kitchen remodeling:work will include demolition of existing counter top, cabinets,vinyl flooring,relocation of sink approx 3 ft. install new engineer hard wood flooring,cabinets install appliances install,painting walls/ceiling. install 3 retro-fit windows at existing opening;not visible from streetDetails
kitchen remodeling:work will include demolition of existing counter top, cabinets,vinyl flooring,relocation of sink approx 3 ft. install new engineer hard wood flooring,cabinets install appliances install,painting walls/ceiling. install 3 retro-fit windows at existing opening;not visible from street | $3,200 |
| Oct 3, 2024 | In progress issued Oct 2024 | 64 Sanchez St | Mars Construction And Remodeling | addition of staircase, raise ceiling with 2 new skylights, and bathroom additionDetails
addition of staircase, raise ceiling with 2 new skylights, and bathroom addition | $50,000 |
| Aug 8, 2024 | Completed final sign-off Sep 2025 | 1325 Indiana St | Mars Construction And Remodeling | unit #8: interior remodel of a lofted condominium on 2nd fl. bedroom and ensuite are being updated with new fixtures, finishes, and cabinetry. addition of storage at entry.Details
unit #8: interior remodel of a lofted condominium on 2nd fl. bedroom and ensuite are being updated with new fixtures, finishes, and cabinetry. addition of storage at entry. | $40,000 |