Daniel Paris
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Thousand Architects
- Based in
- San Francisco
- On San Francisco permits
- Dec 2006 to Oct 2026
302 permits since 2000 (architect on 271 permits, engineer on 17 permits, authorized agent-others on 16 permits, designer on 2 permits): 164 completed, 56 in progress, 48 never finaled, 34 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 302.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 1, 2026 | In progress filed Oct 2026, not yet issued | 745 Lakeview Av | addition & alterations to (e) one story, sfd. new basement. great room addition at 1st floor & kitchen remodel. 2nd floor addition with new bedroom & bathrooms. approximatly 80 cu. ft. to be excavated for new basement below proposed addition.Details
addition & alterations to (e) one story, sfd. new basement. great room addition at 1st floor & kitchen remodel. 2nd floor addition with new bedroom & bathrooms. approximatly 80 cu. ft. to be excavated for new basement below proposed addition. | $199,000 | |
| Sep 30, 2026 | In progress filed Sep 2026, not yet issued | 3465 22nd St | provide 2 adu per local oridinance 207c4 at (e) 1/f parking and storage. provide voluntary soft-story upgrade.Details
provide 2 adu per local oridinance 207c4 at (e) 1/f parking and storage. provide voluntary soft-story upgrade. | $150,000 | |
| Sep 24, 2026 | In progress filed Sep 2026, not yet issued | 740 Rhode Island St | providing interior ti at first floor common areas to include converting (e) trash room into a mail room and creating a (n) trash area at (e) storage area with (n) door opening. no changes to use, egress, square footage, exterior, and meps.Details
providing interior ti at first floor common areas to include converting (e) trash room into a mail room and creating a (n) trash area at (e) storage area with (n) door opening. no changes to use, egress, square footage, exterior, and meps. | $5,000 | |
| Sep 24, 2026 | In progress issued Sep 2026 | 280 Fell St | Strong Builders Construction Inc. | revision to pa 202606163326 revised location of new laundry closet @ unit 205Details
revision to pa 202606163326 revised location of new laundry closet @ unit 205 | |
| Sep 24, 2026 | In progress issued Sep 2026 | 280 Fell St | Strong Builders Construction Inc. | revision to pa 202606163328 revised location of new laundry closet @ unit 305Details
revision to pa 202606163328 revised location of new laundry closet @ unit 305 | |
| Sep 14, 2026 | In progress issued Oct 2026 | 3401 Clay St | B-Side Inc. | kitchen (91sf) and bath (50sf) remodel. addition of washer and dryerDetails
kitchen (91sf) and bath (50sf) remodel. addition of washer and dryer | $65,000 |
| Sep 1, 2026 | In progress filed Sep 2026, not yet issued | 3640 17th St | new street facing fenct @ rear yard (max 10' height); new window bars at all 1st fl windows; new open trash enclosure @ rear yard; repair & replace portions of rear yard deck @ grade in-kindDetails
new street facing fenct @ rear yard (max 10' height); new window bars at all 1st fl windows; new open trash enclosure @ rear yard; repair & replace portions of rear yard deck @ grade in-kind | $10,000 | |
| Sep 1, 2026 | In progress issued Sep 2026 | 1935 Franklin St | Sandbank Construction, Inc | demo portion of (e) wall, provide (n) 60 min fire-rated door. provide n laundry w/ flush threshold & handrail 36". provide 1 hr fire-rated separation. provide sprinkler coverage at trash area. comply w nov 202546864 #3. provide min 200 si. vent @ garage. 1(n) garbage, recycle & compostDetails
demo portion of (e) wall, provide (n) 60 min fire-rated door. provide n laundry w/ flush threshold & handrail 36". provide 1 hr fire-rated separation. provide sprinkler coverage at trash area. comply w nov 202546864 #3. provide min 200 si. vent @ garage. 1(n) garbage, recycle & compost | $20,000 |
| Sep 1, 2026 | In progress issued Sep 2026 | 2150 Fell St | Elemental Builders Incorporated | unit 301: on the 4th floor, including relocate kitchen, new bedroom, in kind bahtroom renovation, new laundry, no structural, no exterior work and no change to areas or egress.Details
unit 301: on the 4th floor, including relocate kitchen, new bedroom, in kind bahtroom renovation, new laundry, no structural, no exterior work and no change to areas or egress. | $40,000 |
| Aug 19, 2026 | In progress filed Aug 2026, not yet issued | 801 Hayes St | provide (n) storage closet within existing retail space. no change to areas, use, structure or exteriors. no plumbing work to be performed.Details
provide (n) storage closet within existing retail space. no change to areas, use, structure or exteriors. no plumbing work to be performed. | $1,500 | |
| Aug 12, 2026 | In progress issued Aug 2026 | 1596 Guerrero St | addressing permit only: create sub addresses unit 5 & 6 for 1596 guerrero st. reference pa #202501218672Details
addressing permit only: create sub addresses unit 5 & 6 for 1596 guerrero st. reference pa #202501218672 | ||
| Aug 11, 2026 | In progress issued Sep 2026 | 3548 Pierce St | Hon's Construction Inc. | unit #5: interior rehabilitations to one unit on 4th floor: new kitchen, new bath, renovated bath, new laundry, new bedroom, mep upgrade and structural. no change to space heating, water heating, unit area or exteriors.Details
unit #5: interior rehabilitations to one unit on 4th floor: new kitchen, new bath, renovated bath, new laundry, new bedroom, mep upgrade and structural. no change to space heating, water heating, unit area or exteriors. | $60,000 |
| Aug 11, 2026 | In progress filed Aug 2026, not yet issued | 700 12th Av | remove bike parking, not required anymore. convert to storage. ref 201902153075Details
remove bike parking, not required anymore. convert to storage. ref 201902153075 | ||
| Aug 6, 2026 | In progress issued Sep 2026 | 3401 Clay St | J T & M Hardwood Flooring Construcing | e kitchen remodel, e bath remodel, additon of new washer and dryerDetails
e kitchen remodel, e bath remodel, additon of new washer and dryer | $65,000 |
| Jul 27, 2026 | In progress issued Sep 2026 | 3210 Gough St | Flores General Building | renovation of unit 202 on 3d fl. new kitchen and bath locations. new bedroom, new bedroom egresss window facing gough. associated structural, plumbing, mech, elec. no chang to habitable area.Details
renovation of unit 202 on 3d fl. new kitchen and bath locations. new bedroom, new bedroom egresss window facing gough. associated structural, plumbing, mech, elec. no chang to habitable area. | $40,000 |
| Jul 20, 2026 | In progress filed Jul 2026, not yet issued | 1723 Stockton St | convert 1/f storage into adu per state adu program, planning code section 207.2.Details
convert 1/f storage into adu per state adu program, planning code section 207.2. | $75,000 | |
| Jun 18, 2026 | Completed final sign-off Sep 2026 | 1335 Washington St | Stone And Stryder Llc | 4/f - unit 12: relocate new kitchen. renovate bathroom. new laundry. no structural. no change to areas or use.Details
4/f - unit 12: relocate new kitchen. renovate bathroom. new laundry. no structural. no change to areas or use. | $40,000 |
| Jun 17, 2026 | In progress issued Aug 2026 | 420 14th St | Casman Construction Inc | unit# 1: (e) kitchen relocation. (e) bathroom remodel. conversion of (e) kitchen into (n) office. office not designed or approved for sleeping purposes.Details
unit# 1: (e) kitchen relocation. (e) bathroom remodel. conversion of (e) kitchen into (n) office. office not designed or approved for sleeping purposes. | $65,000 |
| Jun 16, 2026 | In progress issued Jun 2026 | 280 Fell St | Strong Builders Construction Inc. | interior renovation only at (e) unit# 404 in condominium building includes: (n) laundry with elec dryer only. no change to use, no change to unit area,no change to structural,no change to (e) street elevation,no change to (e) common areas.Details
interior renovation only at (e) unit# 404 in condominium building includes: (n) laundry with elec dryer only. no change to use, no change to unit area,no change to structural,no change to (e) street elevation,no change to (e) common areas. | $8,000 |
| Jun 16, 2026 | Completed final sign-off Sep 2026 | 280 Fell St | Strong Builders Construction Inc. | interior renovation only at (e) unit# 403 in condominium building includes: (n) laundry with elec dryer only. no change to use, no change to unit area,no change to structural,no change to (e) street elevation,no change to (e) common areas.Details
interior renovation only at (e) unit# 403 in condominium building includes: (n) laundry with elec dryer only. no change to use, no change to unit area,no change to structural,no change to (e) street elevation,no change to (e) common areas. | $8,000 |
| Jun 16, 2026 | In progress issued Jun 2026 | 280 Fell St | Strong Builders Construction Inc. | interior renovation only at (e) unit# 305 in condominium building includes: (n) laundry with elec dryer only. no change to use, no change to unit area,no change to structural,no change to (e) street elevation,no change to (e) common areas.Details
interior renovation only at (e) unit# 305 in condominium building includes: (n) laundry with elec dryer only. no change to use, no change to unit area,no change to structural,no change to (e) street elevation,no change to (e) common areas. | $8,000 |
| Jun 16, 2026 | In progress issued Jun 2026 | 280 Fell St | Strong Builders Construction Inc. | interior renovation only at (e) unit# 205 in condominium building includes: (n) laundry with elec dryer only. no change to use, no change to unit area,no change to structural,no change to (e) street elevation,no change to (e) common areas.Details
interior renovation only at (e) unit# 205 in condominium building includes: (n) laundry with elec dryer only. no change to use, no change to unit area,no change to structural,no change to (e) street elevation,no change to (e) common areas. | $8,000 |
| Jun 15, 2026 | In progress filed Jun 2026, not yet issued | 1318 Egbert Av | legalize new construction of a metal shop- type v-b construction, 1 story aDetails
legalize new construction of a metal shop- type v-b construction, 1 story a | $200,000 | |
| Jun 12, 2026 | In progress filed Jun 2026, not yet issued | 1715 Webster St | common area improvement on first floor. new electric room. new laundry at (e) location. new trash room. no change to areas, egress, structure, or units.Details
common area improvement on first floor. new electric room. new laundry at (e) location. new trash room. no change to areas, egress, structure, or units. | $30,000 | |
| Jun 9, 2026 | Completed final sign-off Sep 2026 | 4005 California St | Stone And Stryder Llc | 3/f unit 5 - interior renovations. new bedroom. new bath. relocate kitchen. new finishes, fixtures at (e) bath. no change to use, area, egress, water or space heating. new laundry. revision to 202603127490, which was otc no plans for kitchen and bathroom remodel.Details
3/f unit 5 - interior renovations. new bedroom. new bath. relocate kitchen. new finishes, fixtures at (e) bath. no change to use, area, egress, water or space heating. new laundry. revision to 202603127490, which was otc no plans for kitchen and bathroom remodel. | $50,000 |
| Jun 9, 2026 | Completed final sign-off Jul 2026 | 1801 California St | Stone And Stryder Llc | unit 505 on 6/f: new bedroom. relocate kitchen. new laundry. new finishes, fixtures at (e) bath. no change to use, area, egress, water or space heating. revision to 202603127484.Details
unit 505 on 6/f: new bedroom. relocate kitchen. new laundry. new finishes, fixtures at (e) bath. no change to use, area, egress, water or space heating. revision to 202603127484. | $40,000 |
| Jun 9, 2026 | In progress issued Jul 2026 | 1723 Stockton St | unit # 1723a: renovate one unit on first floor at rear bldg to match approved units at upper floors. no change to areas. new kitchen. 2 baths. replace windows not visible from st. 3 property line windows in kind and 2 facing the court to change in size. structural permit is 2026-6127-4608.Details
unit # 1723a: renovate one unit on first floor at rear bldg to match approved units at upper floors. no change to areas. new kitchen. 2 baths. replace windows not visible from st. 3 property line windows in kind and 2 facing the court to change in size. structural permit is 2026-6127-4608. | $75,000 | |
| Jun 4, 2026 | In progress issued Jun 2026 | 419 Laguna St | Jc Construction | unit 1: interior remodel only - fire repair to replace sheetrock, insulation, rewire and alter kitchen and 2 bathrooms. no exterior work.Details
unit 1: interior remodel only - fire repair to replace sheetrock, insulation, rewire and alter kitchen and 2 bathrooms. no exterior work. | $130,000 |
| May 21, 2026 | In progress issued May 2026 | 3642 17th St | new bath. renovate (e) bath w/ laundry. new water heater & furnace. remove knobt & tube wiring, repair/replace finish gyp brd. new bedroom closets. kitchen renovation. respond to complaint #202655938Details
new bath. renovate (e) bath w/ laundry. new water heater & furnace. remove knobt & tube wiring, repair/replace finish gyp brd. new bedroom closets. kitchen renovation. respond to complaint #202655938 | $50,000 | |
| May 20, 2026 | Completed final sign-off Sep 2026 | 3640 17th St | new bath w/laundry. remove door to other bath. new water heater and furnance. remove interior plaster and drywall finishes. remove knob and tube wiring to upgrade panel( under separate permit), gyp brd. new pocket door at office.Details
new bath w/laundry. remove door to other bath. new water heater and furnance. remove interior plaster and drywall finishes. remove knob and tube wiring to upgrade panel( under separate permit), gyp brd. new pocket door at office. | $20,000 | |
| May 20, 2026 | In progress filed May 2026, not yet issued | 1318 Egbert Av | erect new office building-type: v-b, 2 stories.Details
erect new office building-type: v-b, 2 stories. | $200,000 | |
| Apr 22, 2026 | In progress issued Apr 2026 | 1018 Pennsylvania Av | revision to bpa: 202212087955 - to document and retain (e) curb cut and driveway within front set back, any vehicle parked at driveway shall not encroach into the pow pursuant to planning code section 152.3Details
revision to bpa: 202212087955 - to document and retain (e) curb cut and driveway within front set back, any vehicle parked at driveway shall not encroach into the pow pursuant to planning code section 152.3 | ||
| Apr 13, 2026 | In progress filed Apr 2026, not yet issued | 255 Maywood Dr | Ashbury Gen Constructing & Eng | revision to approved permit #2024-0731-7681. 1) new window 2) revisied window sizes/types 3) removed windows/slylights, and associated structural.Details
revision to approved permit #2024-0731-7681. 1) new window 2) revisied window sizes/types 3) removed windows/slylights, and associated structural. | $25,000 |
| Apr 8, 2026 | In progress filed Apr 2026, not yet issued | 1237 Washington St | to comply with nov202428314 to legalizae an (e) rear yard horizontal addition at the 2/f and roof deck at the 3/f.Details
to comply with nov202428314 to legalizae an (e) rear yard horizontal addition at the 2/f and roof deck at the 3/f. | $30,000 | |
| Mar 9, 2026 | In progress issued Jul 2026 | 72 Hancock St | construction of new type v-b, 2-story residential dwelling unit in rear of lot. comply dcp 2023-006766enfDetails
construction of new type v-b, 2-story residential dwelling unit in rear of lot. comply dcp 2023-006766enf | $150,000 | |
| Mar 9, 2026 | In progress issued Jul 2026 | 70 Hancock St | demolition of a type v-b, 2 story building in rearDetails
demolition of a type v-b, 2 story building in rear | $15,000 | |
| Feb 24, 2026 | Completed final sign-off Aug 2026 | 495 32nd Av | Stone And Stryder Llc | revision to permit 202508193432. interior renovation to 6 units: 104, 204, 302, 304, 402, and 404. additional scope to include replacement of existing bathtubs, vanities, and toilets in kind. replace (e) shower surround and floor tiles. at units 204 and 304: provide new tile at showers. no change toDetails
revision to permit 202508193432. interior renovation to 6 units: 104, 204, 302, 304, 402, and 404. additional scope to include replacement of existing bathtubs, vanities, and toilets in kind. replace (e) shower surround and floor tiles. at units 204 and 304: provide new tile at showers. no change to | $75,000 |
| Feb 9, 2026 | Completed final sign-off Jun 2026 | 3210 Gough St | Flores General Building | unit 102: renovations - new kitchen and bathroom locations. new bedroom. new bedroom egress window facing gough st. associated structural, mechanical, electrical, and plumbing. no changes to habitable area.Details
unit 102: renovations - new kitchen and bathroom locations. new bedroom. new bedroom egress window facing gough st. associated structural, mechanical, electrical, and plumbing. no changes to habitable area. | $40,000 |
| Jan 27, 2026 | In progress issued Feb 2026 | 1725 Stockton St | revision to 202407317615. the purpose of this revision is to provide new structural foundation design based on existing conditions.Details
revision to 202407317615. the purpose of this revision is to provide new structural foundation design based on existing conditions. | ||
| Dec 31, 2025 | In progress filed Dec 2025, not yet issued | 1585 Folsom St | commerical interior renovations: provide fire rated properly line construction for separations between adjacent buildings, 1-hour fire rated exit enclosure at existing stair, first floor, mezz and second floor to be used as art studio and storage, provide new loading access door, driveway, and curbDetails
commerical interior renovations: provide fire rated properly line construction for separations between adjacent buildings, 1-hour fire rated exit enclosure at existing stair, first floor, mezz and second floor to be used as art studio and storage, provide new loading access door, driveway, and curb | $150,000 | |
| Dec 9, 2025 | In progress issued May 2026 | 5530 Mission St | Sgv Group Construction | per unit legalization ord# 43-14. legalize one (3 bedroom) unit. remove & install exterior doors & windows. remove (e) kitchen & install new kitchen. fire rated assemblies. egress & eero path improvements. fire sprinkler & alarm upgrades as necessary. one parking space to be removed.Details
per unit legalization ord# 43-14. legalize one (3 bedroom) unit. remove & install exterior doors & windows. remove (e) kitchen & install new kitchen. fire rated assemblies. egress & eero path improvements. fire sprinkler & alarm upgrades as necessary. one parking space to be removed. | $100,000 |
| Dec 3, 2025 | In progress filed Dec 2025, not yet issued | 1583 Folsom St | commerical change of use to include fire rated property line walls, 1 hr fire rated stair enclosure, 3rd floor to be used as arts activity studios. (n) ada restroomDetails
commerical change of use to include fire rated property line walls, 1 hr fire rated stair enclosure, 3rd floor to be used as arts activity studios. (n) ada restroom | $75,000 | |
| Nov 7, 2025 | In progress issued Nov 2025 | 280 Fell St | Strong Builders Construction Inc. | revision to pa 202509306390 interior renovations at unit 304 remove bathtub and add new shower. existing 2 bathrooms have shower pans. 1st permit remdoels both bathtubs into shower pans, this permit only one whower into bathrubDetails
revision to pa 202509306390 interior renovations at unit 304 remove bathtub and add new shower. existing 2 bathrooms have shower pans. 1st permit remdoels both bathtubs into shower pans, this permit only one whower into bathrub | $2,500 |
| Oct 31, 2025 | In progress issued Sep 2026 | 4135 19th St | S L M Development Inc. | horizontal addition floors 1 & 2. "rooms down" expansion into first floor, new bath and bedroom new windows. excavation of 28.7 cubic yards at rear, new retaining walls.Details
horizontal addition floors 1 & 2. "rooms down" expansion into first floor, new bath and bedroom new windows. excavation of 28.7 cubic yards at rear, new retaining walls. | $100,000 |
| Oct 15, 2025 | Completed final sign-off Mar 2026 | 2037 Castro St | Grizzly Builders Inc. | apt 21: new laundry, new bathroom & new closet. no change of use, exteriors, egress or unit area. no structural work.Details
apt 21: new laundry, new bathroom & new closet. no change of use, exteriors, egress or unit area. no structural work. | $20,000 |
| Oct 14, 2025 | Completed final sign-off May 2026 | 2035 Castro St | Grizzly Builders Inc. | unit #32 interior renovation on 3rd fl. new laundry, closet & bathroom. no change to use, exteriors, egress or unit area. no structural.Details
unit #32 interior renovation on 3rd fl. new laundry, closet & bathroom. no change to use, exteriors, egress or unit area. no structural. | $5,000 |
| Oct 14, 2025 | Completed final sign-off Jun 2026 | 305 12th St | Construction Studios, Inc | provide property line blind walls to separate (e) buildings. no structure, no new areas.Details
provide property line blind walls to separate (e) buildings. no structure, no new areas. | $5,000 |
| Oct 14, 2025 | Completed final sign-off Mar 2026 | 2035 Castro St | Grizzly Builders Inc. | unit 31: interior renovation to one unit on the 3rd floor: 1 new laundry. no change to use, exteriors, egress or unit area and no structural.Details
unit 31: interior renovation to one unit on the 3rd floor: 1 new laundry. no change to use, exteriors, egress or unit area and no structural. | $5,000 |
| Oct 3, 2025 | Completed final sign-off Mar 2026 | 2033 Castro St | Grizzly Builders Inc. | 2/f - unit 21: interior renovation. new laundry. no change to use, exteriors, egress or unit area. no structural.Details
2/f - unit 21: interior renovation. new laundry. no change to use, exteriors, egress or unit area. no structural. | $5,000 |
| Oct 3, 2025 | Completed final sign-off Mar 2026 | 2031 Castro St | Grizzly Builders Inc. | interior renovation to 1 unit #32 on 3rd fl. new laundry. no change to use, exterior, egress or unit area. non structural.Details
interior renovation to 1 unit #32 on 3rd fl. new laundry. no change to use, exterior, egress or unit area. non structural. | $5,000 |
| Oct 2, 2025 | Completed final sign-off Mar 2026 | 2031 Castro St | Grizzly Builders Inc. | unit 22- 2nd floor remodel to include (n) laundry , bathroom, and closet. no change to use, exterior, egress or addtional square footage.Details
unit 22- 2nd floor remodel to include (n) laundry , bathroom, and closet. no change to use, exterior, egress or addtional square footage. | $20,000 |
| Oct 2, 2025 | Completed final sign-off Mar 2026 | 2031 Castro St | Grizzly Builders Inc. | unit #31: interior renovation on 3rd floor: new laundry. no change to use, exteriors, egress or unit area, and no structural. 2 bathroooms remodel in-kindDetails
unit #31: interior renovation on 3rd floor: new laundry. no change to use, exteriors, egress or unit area, and no structural. 2 bathroooms remodel in-kind | $3,000 |
| Sep 30, 2025 | In progress issued Sep 2025 | 280 Fell St | Strong Builders Construction Inc. | interior renovation at unit 304. scope consist of converting an existing closet into a laundry closet with stacked washer/dryer applicances, including utility connections, venting, and code compliant installation. 2 bathroom remodel, conisting of new tile flooring, new bathtub, vanity, and lightDetails
interior renovation at unit 304. scope consist of converting an existing closet into a laundry closet with stacked washer/dryer applicances, including utility connections, venting, and code compliant installation. 2 bathroom remodel, conisting of new tile flooring, new bathtub, vanity, and light | $40,000 |
| Sep 15, 2025 | In progress issued Nov 2025 | 1290 Grove St | Sandbank Construction, Inc | revision to approved adu permit 202002043526. remove all 4 adus and replace garages to original condition. new electrical room. new common laundry. comply with nov 202293711 item 2-7.Details
revision to approved adu permit 202002043526. remove all 4 adus and replace garages to original condition. new electrical room. new common laundry. comply with nov 202293711 item 2-7. | $10,000 |
| Sep 9, 2025 | Completed final sign-off Dec 2025 | 700 12th Av | Mireles Construction Inc | unit 4- kitchen remodel to include (n) finishes, fixtures, and appliances.Details
unit 4- kitchen remodel to include (n) finishes, fixtures, and appliances. | $15,000 |
| Aug 19, 2025 | Completed final sign-off Aug 2026 | 495 32nd Av | Stone And Stryder Llc | comply with complaint 202538965 item# 3. interior renovations to 6 units: 104, 202, 302, 304, 402 and 404. new bedrooms, relocated kitchen, add laundry. no changes to exterior facade, structural components, exiting or unit areas.Details
comply with complaint 202538965 item# 3. interior renovations to 6 units: 104, 202, 302, 304, 402 and 404. new bedrooms, relocated kitchen, add laundry. no changes to exterior facade, structural components, exiting or unit areas. | $100,000 |
| Aug 13, 2025 | In progress issued Jan 2026 | 4135 19th St | S L M Development Inc. | interior remodel to unit 4135 at 2nd floor to include bathroom and kitchen.Details
interior remodel to unit 4135 at 2nd floor to include bathroom and kitchen. | $75,000 |
| Aug 7, 2025 | In progress issued Aug 2025 | 1740 Broadway | Strong Builders Construction Inc. | unit#705: interior renovations to bedrooms, kitchen, baths. new windows at e openings, not street facing. no change to areas, uses, or structural.Details
unit#705: interior renovations to bedrooms, kitchen, baths. new windows at e openings, not street facing. no change to areas, uses, or structural. | $100,000 |
| Jun 4, 2025 | Completed final sign-off Jun 2025 | 260 San Jose Av | S L M Development Inc. | revision to approved adu permit pa #202209132323 for final inspection. provide updated plans for closets and patio walls. no change to unit areas or unit count.Details
revision to approved adu permit pa #202209132323 for final inspection. provide updated plans for closets and patio walls. no change to unit areas or unit count. | |
| Jun 3, 2025 | In progress issued Aug 2025 | 1596 Guerrero St | provide seismic upgrade to meet requirements of mandatory programDetails
provide seismic upgrade to meet requirements of mandatory program | $25,000 | |
| May 21, 2025 | In progress issued Mar 2026 | 765 Bay St | B-Side Inc. | repair and replace (e) exterior finishes and water proofing in kind. interior renovations, expand into crawspace at first floor. sesimic upgrade.Details
repair and replace (e) exterior finishes and water proofing in kind. interior renovations, expand into crawspace at first floor. sesimic upgrade. | $300,000 |
| May 12, 2025 | In progress issued Jun 2025 | 4135 19th St | S L M Development Inc. | foundation repair and replacementDetails
foundation repair and replacement | $50,000 |
| Apr 9, 2025 | Completed final sign-off Jun 2025 | 4137 19th St | S L M Development Inc. | convert closet to bathroomDetails
convert closet to bathroom | $25,000 |
| Mar 26, 2025 | Completed final sign-off May 2025 | 1335 Washington St | Stryder Consulting Llc | convert (e) storage located on 1st floor to a (n) common laundry areaDetails
convert (e) storage located on 1st floor to a (n) common laundry area | $10,000 |
| Mar 12, 2025 | In progress issued Nov 2025 | 1596 Guerrero St | 2 adu's within (e) envelope at 1st floor parking & storage areas. seismic upgrade under separate pa# 202410304074 (otc-not issue yet).Details
2 adu's within (e) envelope at 1st floor parking & storage areas. seismic upgrade under separate pa# 202410304074 (otc-not issue yet). | $100,000 | |
| Mar 4, 2025 | Completed final sign-off May 2025 | 1335 Washington St | Stryder Consulting Llc | unit 8- interior remodel on 3rd floor to relocate (e) kitchen , remodel bathroom and (n) laundry hookups. no change to exterior, sturctual or adding sfDetails
unit 8- interior remodel on 3rd floor to relocate (e) kitchen , remodel bathroom and (n) laundry hookups. no change to exterior, sturctual or adding sf | $30,000 |
| Feb 28, 2025 | Expired or cancelled expired Jul 2026 | 712 Sansome St | Strong Builders Construction Inc. | non-structural interior demo, no structural, no new construction, no occupancy-vacant bldg, no change to exteriors.Details
non-structural interior demo, no structural, no new construction, no occupancy-vacant bldg, no change to exteriors. | $10,000 |
| Dec 20, 2024 | In progress filed Dec 2024, not yet issued | 251 Faxon Av | new retaining wall and steps w/in front setbackDetails
new retaining wall and steps w/in front setback | $15,000 | |
| Sep 24, 2024 | Completed final sign-off Sep 2025 | 80 Mizpah St | Mizen Construction Inc | rear yard horizontal addition at second floor (75sf).Details
rear yard horizontal addition at second floor (75sf). | $20,000 |
| Aug 28, 2024 | In progress issued Oct 2024 | 379 27th St | convert (e) detached garage to habitable living space.Details
convert (e) detached garage to habitable living space. | $50,000 | |
| Aug 23, 2024 | Expired or cancelled withdrawn Jul 2025 | 1601 Beach St | provide (4) adu's within existing envelope at first floor parking and storage per ord 162-16. mandatory soft story under pa# 202311211197.Details
provide (4) adu's within existing envelope at first floor parking and storage per ord 162-16. mandatory soft story under pa# 202311211197. | $200,000 | |
| Aug 14, 2024 | In progress issued Sep 2025 | 1725 Stockton St | rear bldg: partially addressed to nov# 202307019. proposed works at rear units 1725a & 1727a located on 2nd and 3rd flrs; works consist of horiz addition, new windows, interior renovation with new layout throughout each unit including new kitchen, bathrooms and bedrooms. remaining nov items in frontDetails
rear bldg: partially addressed to nov# 202307019. proposed works at rear units 1725a & 1727a located on 2nd and 3rd flrs; works consist of horiz addition, new windows, interior renovation with new layout throughout each unit including new kitchen, bathrooms and bedrooms. remaining nov items in front | $200,000 | |
| Aug 13, 2024 | In progress issued Sep 2025 | 255 Maywood Dr | Ashbury Gen Constructing & Eng | rear yard horizontal addition @ third fl,rear yard deck & stairs,rear yard deck & stairs,(n)windows & doors @ rear yard,replace all windows in-kind,interior renovations including bathrooms and kitchen, structural and mep.Details
rear yard horizontal addition @ third fl,rear yard deck & stairs,rear yard deck & stairs,(n)windows & doors @ rear yard,replace all windows in-kind,interior renovations including bathrooms and kitchen, structural and mep. | $150,000 |
| Aug 2, 2024 | Completed final sign-off Nov 2024 | 1193 Valencia St | install an automatic door operator at entry door for e retail spaceDetails
install an automatic door operator at entry door for e retail space | $5,000 | |
| Jul 11, 2024 | Completed final sign-off Feb 2025 | 1740 Broadway | Strong Builders Construction Inc. | unit 606: relocate bedrooms & new bathrooms. relocate kitchen. interior court windows in kind & mech, eletrical & plumbing. no addition/ structural. no change to st facing exteriorDetails
unit 606: relocate bedrooms & new bathrooms. relocate kitchen. interior court windows in kind & mech, eletrical & plumbing. no addition/ structural. no change to st facing exterior | $50,000 |
| Jun 5, 2024 | Completed final sign-off Aug 2024 | 2945 Van Ness Av | Stryder Consulting Llc | unit #3 kitchen renovation, new laundry, electrical, lighting finishes. no structural, exteriors or new areaDetails
unit #3 kitchen renovation, new laundry, electrical, lighting finishes. no structural, exteriors or new area | $15,000 |
| Jun 5, 2024 | In progress issued Nov 2024 | 625 Bush St | new common laundry at e basement storage. no structural, no new area, no exteriors.Details
new common laundry at e basement storage. no structural, no new area, no exteriors. | $50,000 | |
| Jun 5, 2024 | Completed final sign-off Aug 2024 | 1737 Chestnut St | Stryder Consulting Llc | unit# 1: kitchen renovation. new laundry. electrical, lighting, and finishes. no structural. no exteriors. no new area.Details
unit# 1: kitchen renovation. new laundry. electrical, lighting, and finishes. no structural. no exteriors. no new area. | $15,000 |
| Jun 4, 2024 | Completed final sign-off Aug 2024 | 2945 Van Ness Av | Stryder Consulting Llc | the purpose of this permit ti to provide interior renovations at existing unit 7. kitchen renovation, new laundry, elec and lighting improvements, repair and replace various interior finishes. no structural or exteriorsDetails
the purpose of this permit ti to provide interior renovations at existing unit 7. kitchen renovation, new laundry, elec and lighting improvements, repair and replace various interior finishes. no structural or exteriors | $15,000 |
| Jun 4, 2024 | Completed final sign-off Aug 2024 | 2945 Van Ness Av | Stryder Consulting Llc | unit 6 - provide interior renovations @ unit 6. kitchen renovation, new dishwasher; divide exist. closet to new laundry; elec and lighting improvements; repair and replace various interior finishes. no structural, no new areas and no exteriorDetails
unit 6 - provide interior renovations @ unit 6. kitchen renovation, new dishwasher; divide exist. closet to new laundry; elec and lighting improvements; repair and replace various interior finishes. no structural, no new areas and no exterior | $15,000 |
| May 3, 2024 | In progress issued May 2024 | 1727 Stockton St | replace (e) wood window in-kind at 4/f for unit 1727 stockton st. details to match original. all iin same openings. 6 windows front facing. 11 windows not front facing.Details
replace (e) wood window in-kind at 4/f for unit 1727 stockton st. details to match original. all iin same openings. 6 windows front facing. 11 windows not front facing. | $7,500 | |
| Apr 22, 2024 | Completed final sign-off Aug 2024 | 2945 Van Ness Av | Stryder Consulting Llc | (n) common laundry at first. adding plumbing and venting to newDetails
(n) common laundry at first. adding plumbing and venting to new | $2,500 |
| Apr 22, 2024 | Expired or cancelled withdrawn May 2024 | 2945 Van Ness Av | units# 3,6,7: interior renovations - kitchen renovations. new laundry. no exterior changes. no structural.Details
units# 3,6,7: interior renovations - kitchen renovations. new laundry. no exterior changes. no structural. | $30,000 | |
| Apr 19, 2024 | Expired or cancelled withdrawn Jun 2024 | 1737 Chestnut St | unit interior renovations at (2) units - #1 & 4. kitchen renovations, new laundry, new bedroom at unit #4. no exterior changes, no structural. various finishes.Details
unit interior renovations at (2) units - #1 & 4. kitchen renovations, new laundry, new bedroom at unit #4. no exterior changes, no structural. various finishes. | $30,000 | |
| Apr 18, 2024 | Completed final sign-off Sep 2024 | 1737 Chestnut St | Stryder Consulting Llc | (n) common laundry at first floor. install bollards.Details
(n) common laundry at first floor. install bollards. | $2,500 |
| Apr 18, 2024 | Completed final sign-off Jun 2024 | 2242 Polk St | S L M Development Inc. | interior renovation unit 414 on the 4th fl. kitchen in kind, bath in kind, new laundry, electrical, lighting, finishesDetails
interior renovation unit 414 on the 4th fl. kitchen in kind, bath in kind, new laundry, electrical, lighting, finishes | $25,000 |
| Apr 18, 2024 | Completed final sign-off Aug 2024 | 216 04th Av | Stryder Consulting Llc | unit 4- first and second level interior remodel to inlcude kitchen and 3xbathrooms. remove 2x master suite closets and convert (e) storage into walk in closet and infill (e) door opening. replace finishes and fixtures as needed.Details
unit 4- first and second level interior remodel to inlcude kitchen and 3xbathrooms. remove 2x master suite closets and convert (e) storage into walk in closet and infill (e) door opening. replace finishes and fixtures as needed. | $25,000 |
| Apr 18, 2024 | Completed final sign-off Feb 2025 | 1144 Pacific Av | replace (e) rear yard egress stair in kind. repair and replace roof decking.Details
replace (e) rear yard egress stair in kind. repair and replace roof decking. | $25,000 | |
| Apr 12, 2024 | Completed final sign-off Nov 2024 | 156 Terra Vista Av | unit 3: revision to no-plan permit 202312051985 to provide drawings per inspector's request. work includes kitchen relocation, bedroom relocation, new bedroom, bath renovation in kind. no change to exteriors.Details
unit 3: revision to no-plan permit 202312051985 to provide drawings per inspector's request. work includes kitchen relocation, bedroom relocation, new bedroom, bath renovation in kind. no change to exteriors. | ||
| Mar 28, 2024 | Expired or cancelled withdrawn Nov 2024 | 1596 Guerrero St | provide (1) adu's within existing envelope at 1/f parking & storage per state law government code 65852.2.Details
provide (1) adu's within existing envelope at 1/f parking & storage per state law government code 65852.2. | $100,000 | |
| Feb 22, 2024 | In progress filed Feb 2024, not yet issued | 244 Divisadero St | to comply with nov 202295196 reconstruction of fire damaged building repair & replace (e) construction in-kind. work on all 5 units including 246 divisadero and commercial spaceDetails
to comply with nov 202295196 reconstruction of fire damaged building repair & replace (e) construction in-kind. work on all 5 units including 246 divisadero and commercial space | $100,000 | |
| Feb 9, 2024 | Completed final sign-off Oct 2025 | 1723 Stockton St | this permit is to partially comply with nov 202307019. no final for scope at front building until rear building has been issued and completed, scope: clairfy address, 1st floor demo at unpermitted area. reinstall 5/8 drywall only, 4th floor interior ti.Details
this permit is to partially comply with nov 202307019. no final for scope at front building until rear building has been issued and completed, scope: clairfy address, 1st floor demo at unpermitted area. reinstall 5/8 drywall only, 4th floor interior ti. | $100,000 | |
| Jan 19, 2024 | Completed final sign-off Aug 2024 | 412 Lansdale Av | Strong Builders Construction Inc. | revision to approved 202203281034 for final inspection. remove reayr yard steps to grade, remove door between bedrooms on second floor, remove rear yard trellisDetails
revision to approved 202203281034 for final inspection. remove reayr yard steps to grade, remove door between bedrooms on second floor, remove rear yard trellis | |
| Nov 8, 2023 | Expired or cancelled withdrawn Feb 2024 | 64 Winfield St | provide (2) new dwelling units with vertical addition for (3) floors over basement. existing building is (1) unit, 1 floor over basement. (2) adu's at basement under separate permit (pa#202309207025)Details
provide (2) new dwelling units with vertical addition for (3) floors over basement. existing building is (1) unit, 1 floor over basement. (2) adu's at basement under separate permit (pa#202309207025) | $200,000 | |
| Nov 2, 2023 | Completed final sign-off Sep 2024 | 280 Fell St | Strong Builders Construction Inc. | units 409, new laundry installation in the closet for each department unit. install new electrical, plumbing outlets for new laundry installationDetails
units 409, new laundry installation in the closet for each department unit. install new electrical, plumbing outlets for new laundry installation | $5,000 |
| Nov 2, 2023 | Completed final sign-off Feb 2024 | 280 Fell St | Strong Builders Construction Inc. | units 309, new laundry installation in the closet for each department unit. install new electrical, plumbing outlets for new laundry installationDetails
units 309, new laundry installation in the closet for each department unit. install new electrical, plumbing outlets for new laundry installation | $5,000 |
| Oct 24, 2023 | In progress issued Sep 2024 | 1580 Beach St | Thoren Construction Inc. | provide (6) adu's within existing envelope at first floor parking and storage per ord 162-16.Details
provide (6) adu's within existing envelope at first floor parking and storage per ord 162-16. | $200,000 |
| Oct 10, 2023 | Expired or cancelled expired Jun 2026 | 3548 Pierce St | install new hydronic heating in all units.Details
install new hydronic heating in all units. | $30,000 | |
| Oct 3, 2023 | Never finaled filed Oct 2023, never issued | 1369 Hyde St | renovate existing second floors storage room into a commom area room for use by residential tenants only. accessory to residential use.Details
renovate existing second floors storage room into a commom area room for use by residential tenants only. accessory to residential use. | $20,000 | |
| Sep 26, 2023 | Completed final sign-off Oct 2023 | 1193 Valencia St | barrier removal. provide ada restroom @ 1st fl commercial spaceDetails
barrier removal. provide ada restroom @ 1st fl commercial space | $7,500 |