Stryder Consulting Llc
- Based in
- Alameda
- On San Francisco permits
- Apr 2024 to Mar 2025
- Last 24 months
- 2 permits filed
10 permits since 2000: 10 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 26, 2025 | Completed final sign-off May 2025 | 1335 Washington St | convert (e) storage located on 1st floor to a (n) common laundry areaDetails
convert (e) storage located on 1st floor to a (n) common laundry area | $10,000 |
| Mar 4, 2025 | Completed final sign-off May 2025 | 1335 Washington St | unit 8- interior remodel on 3rd floor to relocate (e) kitchen , remodel bathroom and (n) laundry hookups. no change to exterior, sturctual or adding sfDetails
unit 8- interior remodel on 3rd floor to relocate (e) kitchen , remodel bathroom and (n) laundry hookups. no change to exterior, sturctual or adding sf | $30,000 |
| Jun 20, 2024 | Completed final sign-off Sep 2024 | 1737 Chestnut St | unit 4: convert (e) kitchen to office. convert (e) dining to study. relocate bedroom and kitchen. rehabilitate (e) bathroom. install 2nd bathroom. install washer and dryer.Details
unit 4: convert (e) kitchen to office. convert (e) dining to study. relocate bedroom and kitchen. rehabilitate (e) bathroom. install 2nd bathroom. install washer and dryer. | $80,000 |
| Jun 5, 2024 | Completed final sign-off Aug 2024 | 2945 Van Ness Av | unit #3 kitchen renovation, new laundry, electrical, lighting finishes. no structural, exteriors or new areaDetails
unit #3 kitchen renovation, new laundry, electrical, lighting finishes. no structural, exteriors or new area | $15,000 |
| Jun 5, 2024 | Completed final sign-off Aug 2024 | 1737 Chestnut St | unit# 1: kitchen renovation. new laundry. electrical, lighting, and finishes. no structural. no exteriors. no new area.Details
unit# 1: kitchen renovation. new laundry. electrical, lighting, and finishes. no structural. no exteriors. no new area. | $15,000 |
| Jun 4, 2024 | Completed final sign-off Aug 2024 | 2945 Van Ness Av | unit 6 - provide interior renovations @ unit 6. kitchen renovation, new dishwasher; divide exist. closet to new laundry; elec and lighting improvements; repair and replace various interior finishes. no structural, no new areas and no exteriorDetails
unit 6 - provide interior renovations @ unit 6. kitchen renovation, new dishwasher; divide exist. closet to new laundry; elec and lighting improvements; repair and replace various interior finishes. no structural, no new areas and no exterior | $15,000 |
| Jun 4, 2024 | Completed final sign-off Aug 2024 | 2945 Van Ness Av | the purpose of this permit ti to provide interior renovations at existing unit 7. kitchen renovation, new laundry, elec and lighting improvements, repair and replace various interior finishes. no structural or exteriorsDetails
the purpose of this permit ti to provide interior renovations at existing unit 7. kitchen renovation, new laundry, elec and lighting improvements, repair and replace various interior finishes. no structural or exteriors | $15,000 |
| Apr 22, 2024 | Completed final sign-off Aug 2024 | 2945 Van Ness Av | (n) common laundry at first. adding plumbing and venting to newDetails
(n) common laundry at first. adding plumbing and venting to new | $2,500 |
| Apr 18, 2024 | Completed final sign-off Sep 2024 | 1737 Chestnut St | (n) common laundry at first floor. install bollards.Details
(n) common laundry at first floor. install bollards. | $2,500 |
| Apr 18, 2024 | Completed final sign-off Aug 2024 | 216 04th Av | unit 4- first and second level interior remodel to inlcude kitchen and 3xbathrooms. remove 2x master suite closets and convert (e) storage into walk in closet and infill (e) door opening. replace finishes and fixtures as needed.Details
unit 4- first and second level interior remodel to inlcude kitchen and 3xbathrooms. remove 2x master suite closets and convert (e) storage into walk in closet and infill (e) door opening. replace finishes and fixtures as needed. | $25,000 |