Back to bathroom remodel contractors
Stryder Consulting Llc
- Based in
- Alameda
- On San Francisco permits
- Apr 2024 to Mar 2025
- Last 24 months
- 2 permits filed
10 permits since 2000: 10 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 27 days from filing to permit and 57 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 4, 2025 | Completed final sign-off May 2025 | 1335 Washington St | unit 8- interior remodel on 3rd floor to relocate (e) kitchen , remodel bathroom and (n) laundry hookups. no change to exterior, sturctual or adding sfDetails
unit 8- interior remodel on 3rd floor to relocate (e) kitchen , remodel bathroom and (n) laundry hookups. no change to exterior, sturctual or adding sf | $30,000 |
| Jun 20, 2024 | Completed final sign-off Sep 2024 | 1737 Chestnut St | unit 4: convert (e) kitchen to office. convert (e) dining to study. relocate bedroom and kitchen. rehabilitate (e) bathroom. install 2nd bathroom. install washer and dryer.Details
unit 4: convert (e) kitchen to office. convert (e) dining to study. relocate bedroom and kitchen. rehabilitate (e) bathroom. install 2nd bathroom. install washer and dryer. | $80,000 |