Annemarie Mullan
- Listed as
- authorized agent-others, contractor
- Firm
- Mullan Enterprises Inc
- Based in
- Daly City
- On San Francisco permits
- Apr 2011 to Jul 2026
64 permits since 2000 (contractor on 64 permits, authorized agent-others on 3 permits): 54 completed, 2 in progress, 5 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 15, 2026 | Completed final sign-off Aug 2026 | 879 Dolores St | Mullan Enterprises Inc | remove siding on back of home from wood to hardie plank, new waterproofing for deck, less than 50% repairs, replace handrails. all work in back of bldg. non street facing.Details
remove siding on back of home from wood to hardie plank, new waterproofing for deck, less than 50% repairs, replace handrails. all work in back of bldg. non street facing. | $10,000 |
| Apr 24, 2026 | In progress filed Apr 2026, not yet issued | 355 Lansdale Av | Mullan Enterprises Inc | remodeling & addition to main residence of 2 unit dwelling. envelope improvements: (n) exterior doors & windows & wall insulation. site upgrades: plunge pool, retaining walls,exterior deck, steps hardscape & planting. (n) detached accessory structure under separate permit.Details
remodeling & addition to main residence of 2 unit dwelling. envelope improvements: (n) exterior doors & windows & wall insulation. site upgrades: plunge pool, retaining walls,exterior deck, steps hardscape & planting. (n) detached accessory structure under separate permit. | $450,000 |
| Apr 23, 2026 | In progress filed Apr 2026, not yet issued | 355 Lansdale Av | Mullan Enterprises Inc | erect a type 5b, 1 story detached accesory structure w/ no dwelling unit.Details
erect a type 5b, 1 story detached accesory structure w/ no dwelling unit. | $150,000 |
| Aug 21, 2025 | Completed final sign-off Apr 2026 | 39 West View Av | Mullan Enterprises Inc | to abate nov 202536360- remove as built open metal cablerail guards at front entry stair and replace with partial height solid guard walls with stucco finish. replace (e) concrete pavers at front stairs with (n) brick paversDetails
to abate nov 202536360- remove as built open metal cablerail guards at front entry stair and replace with partial height solid guard walls with stucco finish. replace (e) concrete pavers at front stairs with (n) brick pavers | $3,500 |
| Jul 8, 2025 | Completed final sign-off Apr 2026 | 38 Ord Ct | Mullan Enterprises Inc | replacement of existing door and sidelights with new sliding door. voluntary plywood stiffening.Details
replacement of existing door and sidelights with new sliding door. voluntary plywood stiffening. | $10,000 |
| Jun 5, 2025 | Completed final sign-off Apr 2026 | 66 28th St | Mullan Enterprises Inc | revision to pa #2024-1004-2297 widen & center slider at rear of 1st fl. change first fl rear window to door. move post in garage, voluntary foundation upgrade through garage, new beam support at roofDetails
revision to pa #2024-1004-2297 widen & center slider at rear of 1st fl. change first fl rear window to door. move post in garage, voluntary foundation upgrade through garage, new beam support at roof | $40,000 |
| Dec 2, 2024 | Completed final sign-off Mar 2025 | 2126 31st Av | Mullan Enterprises Inc | to comply with nov#: 202420771 - repair one step on front stairs, patch and repair roughly 20 sqft of stucco and framing. framing limited to replace 2 to 3 -2x6 studs in-kind replacement. submit plans if structural repair work exceed the scope of work.Details
to comply with nov#: 202420771 - repair one step on front stairs, patch and repair roughly 20 sqft of stucco and framing. framing limited to replace 2 to 3 -2x6 studs in-kind replacement. submit plans if structural repair work exceed the scope of work. | $4,000 |
| Oct 18, 2024 | Completed final sign-off Apr 2026 | 66 28th St | Mullan Enterprises Inc | gr flr horiz. addition w/ new bath & storage. new exterior fenestrations, new roofing and insulation in areas of work. infrastructure upgrades new plumbing, electrical and hvac systems throughout. (n) site upgrades; unit 66- kitchen and bath remodel, add 2nd bath, new rear balcony, 2-new skylights,Details
gr flr horiz. addition w/ new bath & storage. new exterior fenestrations, new roofing and insulation in areas of work. infrastructure upgrades new plumbing, electrical and hvac systems throughout. (n) site upgrades; unit 66- kitchen and bath remodel, add 2nd bath, new rear balcony, 2-new skylights, | $300,000 |
| Jul 19, 2024 | Completed final sign-off Mar 2025 | 448 Duncan St | Mullan Enterprises Inc | voluntary legalization of unwarranted rear 1-story bedroom and bathroom and deck and of unwarranted home office bath at rear of (e) garage. at main level. renovation of (e) bath, replace kitchen appliances and windows at rear replace (e) whole house gas furnace and water heater. repainting exteriorDetails
voluntary legalization of unwarranted rear 1-story bedroom and bathroom and deck and of unwarranted home office bath at rear of (e) garage. at main level. renovation of (e) bath, replace kitchen appliances and windows at rear replace (e) whole house gas furnace and water heater. repainting exterior | $265,000 |
| Jul 12, 2024 | Completed final sign-off Mar 2025 | 448 Duncan St | Mullan Enterprises Inc | front facade renovation with replacement 2 aluminum clad casement windows & 1 garage door in existing openings. (no structural modifications) new painted stucco & finish wallsDetails
front facade renovation with replacement 2 aluminum clad casement windows & 1 garage door in existing openings. (no structural modifications) new painted stucco & finish walls | $25,000 |
| Apr 25, 2024 | Completed final sign-off Aug 2024 | 1566 19th St | Mullan Enterprises Inc | remodel (2) bathrooms in kind located on 1st floor and 2nd floor. add a non structural wall outside bathroom on 2nd floorDetails
remodel (2) bathrooms in kind located on 1st floor and 2nd floor. add a non structural wall outside bathroom on 2nd floor | $50,000 |
| Feb 22, 2024 | Completed final sign-off Sep 2024 | 625 Grand View Av | Mullan Enterprises Inc | front facade renovation including renovated windows, replacement of garage door & new stucco finish, repaint side & rear exterior elevations. no structural modifications.Details
front facade renovation including renovated windows, replacement of garage door & new stucco finish, repaint side & rear exterior elevations. no structural modifications. | $38,000 |
| Aug 2, 2023 | Completed final sign-off Jan 2024 | 690 28th St | Mullan Enterprises Inc | bathroom remodel in-kind, add (4) new lights in (1) bedroomDetails
bathroom remodel in-kind, add (4) new lights in (1) bedroom | $25,000 |
| Jun 16, 2023 | Completed final sign-off Jan 2024 | 225 Granville Wy | Mullan Enterprises Inc | repair front steps (less than 50% in kind), repair dry rot and leak on front steps, replace 3 window sashes in kindDetails
repair front steps (less than 50% in kind), repair dry rot and leak on front steps, replace 3 window sashes in kind | $20,000 |
| Jun 16, 2023 | Completed final sign-off Sep 2023 | 906 Wisconsin St | Mullan Enterprises Inc | demo old kitchen cabinets install new cabinets countertops, back splash in kind existing applicances to remain.Details
demo old kitchen cabinets install new cabinets countertops, back splash in kind existing applicances to remain. | $25,000 |
| Jun 16, 2023 | Completed final sign-off Aug 2023 | 670 Douglass St | Mullan Enterprises Inc | rev to pa# 2022-0919-2679; add new window (replacement) in kitchen at the back of the house per field insp note on jobcard.Details
rev to pa# 2022-0919-2679; add new window (replacement) in kitchen at the back of the house per field insp note on jobcard. | |
| Feb 27, 2023 | Completed final sign-off Jun 2024 | 301 West Portal Av | Mullan Enterprises Inc | comply w/nov# 202290124, fire repair, install new 1-hr rated roof w/additional drains, repair parpet to match existing, install 5/8" type x gypsum throughout, patch & repair concrete slab as redq'd, repair dry rot & fire damage as req'd elec & plumb under separate permit.Details
comply w/nov# 202290124, fire repair, install new 1-hr rated roof w/additional drains, repair parpet to match existing, install 5/8" type x gypsum throughout, patch & repair concrete slab as redq'd, repair dry rot & fire damage as req'd elec & plumb under separate permit. | $450,000 |
| Jul 26, 2022 | Completed final sign-off Jan 2023 | 160 Corwin St | Mullan Enterprises Inc | unit 4: 1 kitchen & 1 bathroom remodel. remove kitchen wall and install beam.Details
unit 4: 1 kitchen & 1 bathroom remodel. remove kitchen wall and install beam. | $50,000 |
| Jun 13, 2022 | Completed final sign-off Dec 2022 | 2060 Sutter St | Mullan Enterprises Inc | kitchen remodel in kind. 2 bathroom remodels in kind, new kitchen cabinets and change one bathtub to a shower, change 2 vanities in bathrooms.Details
kitchen remodel in kind. 2 bathroom remodels in kind, new kitchen cabinets and change one bathtub to a shower, change 2 vanities in bathrooms. | $70,000 |
| Jun 3, 2022 | Completed final sign-off Mar 2023 | 1662 44th Av | Mullan Enterprises Inc | remove exist. partitions and infill sunroom. demo (e) kitchen cabinets, appliances and replace in kindDetails
remove exist. partitions and infill sunroom. demo (e) kitchen cabinets, appliances and replace in kind | $45,000 |
| Mar 22, 2022 | Never finaled issued Mar 2022, no final | 690 28th St | Mullan Enterprises Inc | remodel kitchen, repair/replace (e) ceiling framing as needed, replace living room window, replace extg (e) skylight & add new skylight.Details
remodel kitchen, repair/replace (e) ceiling framing as needed, replace living room window, replace extg (e) skylight & add new skylight. | $105,000 |
| Feb 3, 2022 | Completed final sign-off Mar 2023 | 38 Ord Ct | Mullan Enterprises Inc | repair of (e) concrete stairs at rear of property. (n) cable railing.Details
repair of (e) concrete stairs at rear of property. (n) cable railing. | $10,000 |
| Jan 31, 2022 | Completed final sign-off Jan 2023 | 640 Davis St | Mullan Enterprises Inc | unit #4: remodel (e) kitchen, master & hall bathrooms & powder room. new openings between kitchen & living/dining rooms. renovate (e) stair guardrails. new rooftop condensing unit to add new cooling to (e) forced air heating system.Details
unit #4: remodel (e) kitchen, master & hall bathrooms & powder room. new openings between kitchen & living/dining rooms. renovate (e) stair guardrails. new rooftop condensing unit to add new cooling to (e) forced air heating system. | $77,500 |
| Aug 18, 2021 | Completed final sign-off Aug 2022 | 84 Navajo Av | Mullan Enterprises Inc | replace stucco at front of house and fix any dryrot.Details
replace stucco at front of house and fix any dryrot. | $18,000 |
| Apr 26, 2021 | Completed final sign-off Dec 2021 | 1222 17th Av | Mullan Enterprises Inc | remodel (e) kitchen & replace (e) kitchen window. convert utility room & adjacent closet to (n) master bath & replace (e) window. relocate laundry to hall closet. (n) built-in wardrobes in bedroom. add (n) entry closet.Details
remodel (e) kitchen & replace (e) kitchen window. convert utility room & adjacent closet to (n) master bath & replace (e) window. relocate laundry to hall closet. (n) built-in wardrobes in bedroom. add (n) entry closet. | $120,000 |
| Nov 19, 2020 | Completed final sign-off Nov 2021 | 249 Dellbrook Av | Mullan Enterprises Inc | add bedroom, bath @ lower flr. add exercise room lower flr. remodel kitchen @ main flr.Details
add bedroom, bath @ lower flr. add exercise room lower flr. remodel kitchen @ main flr. | $45,000 |
| Jul 23, 2020 | Completed final sign-off Dec 2020 | 415 Missouri St | Mullan Enterprises Inc | bathroom and laundry remodel in kind. bathroom approx 7ft x 6 ft. replacing toilet, sink with new faucet and bathtub with shower fixture. the laundry closet approximately 3ft x 3ft, with new washer and dryer stack unit, no sink or faucet. all work in kind.Details
bathroom and laundry remodel in kind. bathroom approx 7ft x 6 ft. replacing toilet, sink with new faucet and bathtub with shower fixture. the laundry closet approximately 3ft x 3ft, with new washer and dryer stack unit, no sink or faucet. all work in kind. | $28,000 |
| Jul 21, 2020 | Completed final sign-off Mar 2021 | 879 Dolores St | Mullan Enterprises Inc | renovate / enlarge (e) 1st flr dwell unit. convert storage to (n) bedrm, renovate (e) bath & add (n) laundry, relocate (e) kitch, add (n) rear french doors & (n) deck at grade, add (n) gas forced air furnace, relcoate (e) sump pumpDetails
renovate / enlarge (e) 1st flr dwell unit. convert storage to (n) bedrm, renovate (e) bath & add (n) laundry, relocate (e) kitch, add (n) rear french doors & (n) deck at grade, add (n) gas forced air furnace, relcoate (e) sump pump | $83,500 |
| Mar 9, 2020 | Expired or cancelled cancelled Jan 2024 | 107 Caselli Av | Mullan Enterprises Inc | remodel bathroom in-kind, add new tub, tile, new plmg fixtures and new lighting and replace window in bathroom in-kind, u-factor 0.4.Details
remodel bathroom in-kind, add new tub, tile, new plmg fixtures and new lighting and replace window in bathroom in-kind, u-factor 0.4. | $20,000 |
| Feb 10, 2020 | Completed final sign-off Dec 2021 | 1222 17th Av | Mullan Enterprises Inc | remove(e) balcony on rear facade and replace with new deck. remove (e) facade door and patch, replace an (e) rear window with new door to deck.Details
remove(e) balcony on rear facade and replace with new deck. remove (e) facade door and patch, replace an (e) rear window with new door to deck. | $10,000 |
| Dec 11, 2019 | Completed final sign-off Apr 2021 | 731 Capp St | Mullan Enterprises Inc | project involves removing the existing, non-conforming rear addition, decks & stairs. a new rear stairs will be built within the footprint of the existing. non-conforming structure to be removed.Details
project involves removing the existing, non-conforming rear addition, decks & stairs. a new rear stairs will be built within the footprint of the existing. non-conforming structure to be removed. | $63,000 |
| Dec 6, 2019 | Completed final sign-off Feb 2021 | 195 Urbano Dr | Mullan Enterprises Inc | replace bathroom plumbing fixtures, shower, toilet, sink, lighting/controls, exhaust fan & electrical outlets. all items to be compliant w/title 24 & current codes, replace vanity & mirrorDetails
replace bathroom plumbing fixtures, shower, toilet, sink, lighting/controls, exhaust fan & electrical outlets. all items to be compliant w/title 24 & current codes, replace vanity & mirror | $15,000 |
| Sep 20, 2019 | Completed final sign-off Nov 2020 | 195 Urbano Dr | Mullan Enterprises Inc | reframe existing exterior sunroom walls (upper level). apply plywood sheathing to exteior walls and some new concrete curb to existing footings. windows and stucco work per permit 2019-0807-8180 & door pa 2019-0829-0222Details
reframe existing exterior sunroom walls (upper level). apply plywood sheathing to exteior walls and some new concrete curb to existing footings. windows and stucco work per permit 2019-0807-8180 & door pa 2019-0829-0222 | $15,000 |
| Aug 29, 2019 | Never finaled issued Oct 2019, no final | 195 Urbano Dr | Mullan Enterprises Inc | replace extg aluminum with marvin ultimate clad french door in extg location. note: 20210051475 per comliance of nov201268441.Details
replace extg aluminum with marvin ultimate clad french door in extg location. note: 20210051475 per comliance of nov201268441. | $3,000 |
| Aug 7, 2019 | Completed final sign-off Nov 2020 | 195 Urbano Dr | Mullan Enterprises Inc | demo and replace stucco. replace (e) aluminum windows with marvin ultimate clad in (e) locationsDetails
demo and replace stucco. replace (e) aluminum windows with marvin ultimate clad in (e) locations | $95,000 |
| Jul 3, 2019 | Completed final sign-off Nov 2019 | 14 Ford St | Mullan Enterprises Inc | revision to pa# 2018-1003-2176: structural revision- new ssw at front of garage. new sistered retaining wall at east side of garage.Details
revision to pa# 2018-1003-2176: structural revision- new ssw at front of garage. new sistered retaining wall at east side of garage. | |
| Jun 28, 2019 | Completed final sign-off Feb 2020 | 38 Ord Ct | Mullan Enterprises Inc | 1/f: remodel master bathroom & tile floor in hallwayDetails
1/f: remodel master bathroom & tile floor in hallway | $18,000 |
| Apr 15, 2019 | Completed final sign-off Nov 2019 | 250 29th Av | Mullan Enterprises Inc | renovate (e) kitchen & master bedroom closet.add gyp bd over studs to (e) laundry area at garage w/ replacement water heater. replace all (e) wood siding at rear walls. replace all (e) 1/f windows & patio doors (at rear facade).Details
renovate (e) kitchen & master bedroom closet.add gyp bd over studs to (e) laundry area at garage w/ replacement water heater. replace all (e) wood siding at rear walls. replace all (e) 1/f windows & patio doors (at rear facade). | $61,750 |
| Apr 12, 2019 | Completed final sign-off Jan 2020 | 147 Clearfield Dr | Mullan Enterprises Inc | add new media room and bath in garage; kitchen and bath remodelling.Details
add new media room and bath in garage; kitchen and bath remodelling. | $98,000 |
| Jan 22, 2019 | Completed final sign-off Jun 2019 | 92 Homestead St | Mullan Enterprises Inc | structural revision to 201812219056 reduce new beam span from 14' to 9'6Details
structural revision to 201812219056 reduce new beam span from 14' to 9'6 | $500 |
| Jan 18, 2019 | Completed final sign-off May 2019 | 3570 21st St | Mullan Enterprises Inc | add new electrical and lights in kitchen. replace a few cabinets and add new countertopsDetails
add new electrical and lights in kitchen. replace a few cabinets and add new countertops | $50,000 |
| Dec 21, 2018 | Completed final sign-off Jun 2019 | 92 Homestead St | Mullan Enterprises Inc | remove interior wall at 2nd floor between kitchen and dining.Details
remove interior wall at 2nd floor between kitchen and dining. | $5,000 |
| Oct 3, 2018 | Never finaled issued Apr 2019, no final | 14 Ford St | Mullan Enterprises Inc | front facade alt: replace (e) stucco and stone cladding with (n) wood siding and rpelace (e) front windows (max u-factor 0.32 or better). mod (e) front entry porch and replace (e) wood deck above (e) garage including (n) metal guardrails w/ new fire rated guard wall where deck is adj to east p/l.Details
front facade alt: replace (e) stucco and stone cladding with (n) wood siding and rpelace (e) front windows (max u-factor 0.32 or better). mod (e) front entry porch and replace (e) wood deck above (e) garage including (n) metal guardrails w/ new fire rated guard wall where deck is adj to east p/l. | $34,000 |
| Sep 19, 2018 | Completed final sign-off Mar 2022 | 645 Capp St | Mullan Enterprises Inc | new ground floor additon and roof deck in south east corner of flag lot. one bicycle parking stall will be provided on the 1st floorDetails
new ground floor additon and roof deck in south east corner of flag lot. one bicycle parking stall will be provided on the 1st floor | $75,000 |
| Aug 29, 2018 | Expired or cancelled expired Oct 2025 | 935 Douglass St | Mullan Enterprises Inc | structural revision to pa #201807184835. structural modifications based on existing site conditions.Details
structural revision to pa #201807184835. structural modifications based on existing site conditions. | |
| Jul 18, 2018 | Completed final sign-off Dec 2019 | 935 Douglass St | Mullan Enterprises Inc | at (e) 1st fl - convert storage space to new bedroom, renovate 2 (e) bedrooms, add 2 new bathrooms & new laundry closet. replace (e) 2nd fl bedroom w/new stair to 1st level. replace (e) furnace & water heater; add new gas fireplace.Details
at (e) 1st fl - convert storage space to new bedroom, renovate 2 (e) bedrooms, add 2 new bathrooms & new laundry closet. replace (e) 2nd fl bedroom w/new stair to 1st level. replace (e) furnace & water heater; add new gas fireplace. | $168,250 |
| May 23, 2018 | Completed final sign-off Aug 2018 | 48 Pope St | Mullan Enterprises Inc | add new structural beam and 2 new post with new foundation in garage.Details
add new structural beam and 2 new post with new foundation in garage. | $16,000 |
| May 9, 2018 | Completed final sign-off Sep 2018 | 628 Rhode Island St | Mullan Enterprises Inc | revision to pa #201708144701, new plans showing new and old window openings.Details
revision to pa #201708144701, new plans showing new and old window openings. | |
| May 2, 2018 | Completed final sign-off Nov 2018 | 731 Capp St | Mullan Enterprises Inc | to comply with nov #201711541. 3 pop outs are to be removed and building envelope returned to original. remove ~10lf of property line privacy fence (6') at north rear p/l.Details
to comply with nov #201711541. 3 pop outs are to be removed and building envelope returned to original. remove ~10lf of property line privacy fence (6') at north rear p/l. | $13,627 |
| Aug 14, 2017 | Completed final sign-off Sep 2018 | 628 Rhode Island St | Mullan Enterprises Inc | kitchen & bath remodel on 2nd fl of 2 story residence. total sqft approx 1300 sqft.Details
kitchen & bath remodel on 2nd fl of 2 story residence. total sqft approx 1300 sqft. | $150,000 |
| Jun 30, 2017 | Expired or cancelled expired Mar 2026 | 3047 Fillmore St | Mullan Enterprises Inc | remove load bearing wall on 1st floor. provide 20% ada accessibility upgrades including replacing toilet. provide grab bars and contrast striping front stairsDetails
remove load bearing wall on 1st floor. provide 20% ada accessibility upgrades including replacing toilet. provide grab bars and contrast striping front stairs | $20,000 |
| Jun 28, 2017 | Completed final sign-off Sep 2017 | 1999 Pacific Av | Mullan Enterprises Inc | 2/f: remodel (e) bathroom, new shower, tile, sheetrock, change lighting & plubmingDetails
2/f: remodel (e) bathroom, new shower, tile, sheetrock, change lighting & plubming | $20,000 |
| Mar 7, 2017 | Completed final sign-off Feb 2018 | 179 Duncan St | Mullan Enterprises Inc | remodel bearing wall in kitchen and kitchen remodel. replace 2 window replacement, same size & locationDetails
remodel bearing wall in kitchen and kitchen remodel. replace 2 window replacement, same size & location | $35,000 |
| Oct 25, 2016 | Completed final sign-off Jan 2018 | 2339 25th Av | Mullan Enterprises Inc | kitchen and bathroom renovation. removing 1 wall. adding a bathroom, adding a hallway. legalize full bath on grnd flr. infill lightwell (south property line).Details
kitchen and bathroom renovation. removing 1 wall. adding a bathroom, adding a hallway. legalize full bath on grnd flr. infill lightwell (south property line). | $75,000 |
| Sep 29, 2016 | Completed final sign-off Mar 2017 | 935 Douglass St | Mullan Enterprises Inc | renovate (e) 2nd floor: remodel (e) bathroom, add 3 new skylights, remove non load bearing wall between kitchen & dining room, new sliding glass doors at rear wall and structural upgrades. convert existing den to new bedroomDetails
renovate (e) 2nd floor: remodel (e) bathroom, add 3 new skylights, remove non load bearing wall between kitchen & dining room, new sliding glass doors at rear wall and structural upgrades. convert existing den to new bedroom | $87,750 |
| Apr 22, 2016 | Completed final sign-off Jan 2017 | 2541 21st Av | Mullan Enterprises Inc | on 2nd floor, add bathroom, powder room, add bedroom, family room, laundry room. new exterior door & exterior windows ground floor.Details
on 2nd floor, add bathroom, powder room, add bedroom, family room, laundry room. new exterior door & exterior windows ground floor. | $130,000 |
| Apr 1, 2016 | Completed final sign-off Dec 2016 | 2541 21st Av | Mullan Enterprises Inc | remodel kitchen. remove extg non load bearing wall. in kind replacement windows. new window sashes at front of house, new kitchen window. add 2 new skylights.Details
remodel kitchen. remove extg non load bearing wall. in kind replacement windows. new window sashes at front of house, new kitchen window. add 2 new skylights. | $25,000 |
| Mar 2, 2016 | Completed final sign-off Aug 2016 | 370 Church St | Mullan Enterprises Inc | unit #g- renovate existing kitchen, remove exiting non load bearing partitions, no exterior workDetails
unit #g- renovate existing kitchen, remove exiting non load bearing partitions, no exterior work | $18,500 |
| Feb 16, 2016 | Never finaled issued Feb 2016, no final | 476 Joost Av | Mullan Enterprises Inc | replace tile in down stair shower and bedroom floor, tile upstairs bedroom floor, sheetrock garage. new shower pan.Details
replace tile in down stair shower and bedroom floor, tile upstairs bedroom floor, sheetrock garage. new shower pan. | $30,000 |
| Dec 9, 2015 | Completed final sign-off Mar 2016 | 360 Guerrero St | Mullan Enterprises Inc | unit 206: replace bathtub, tile, vanity, counter top (bathroom). kitchen cabinets - removing non-structural wall. no structural work.Details
unit 206: replace bathtub, tile, vanity, counter top (bathroom). kitchen cabinets - removing non-structural wall. no structural work. | $30,000 |
| Apr 30, 2015 | Never finaled issued Jul 2015, no final | 472 Pacheco St | Mullan Enterprises Inc | master bath remodel on 2nd flDetails
master bath remodel on 2nd fl | $35,000 |
| Sep 24, 2014 | Completed final sign-off Mar 2018 | 1600 Diamond St | Mullan Enterprises Inc | interior remodel. horizontal addition under existing overhang space as gameroom. remove extg fire place and flue. add new windows and doors. new rear deck.Details
interior remodel. horizontal addition under existing overhang space as gameroom. remove extg fire place and flue. add new windows and doors. new rear deck. | $180,000 |
| Sep 28, 2012 | Completed final sign-off Nov 2012 | 3463 21st St | Mullan Enterprises Inc | replacing 6 bedroom windows on 2nd floor. installing new siding on back of house. not visible from street, window are same size, same location.Details
replacing 6 bedroom windows on 2nd floor. installing new siding on back of house. not visible from street, window are same size, same location. | $20,900 |
| Apr 13, 2011 | Completed final sign-off Jun 2011 | 1362 17th Av | Mullan Enterprises Inc | bathroom remodel; new shower, new tiles. kitchen remodel; new kitchen cabinets & lighting & tile work. remove non-bearing wall between kitchen & dining room.Details
bathroom remodel; new shower, new tiles. kitchen remodel; new kitchen cabinets & lighting & tile work. remove non-bearing wall between kitchen & dining room. | $21,000 |