Daire Taidgh Lyne
- Listed as
- authorized agent-others, contractor, designer, pmt consultant/expediter
- Firm
- Lyne Construction
- Based in
- San Francisco
- On San Francisco permits
- May 2018 to Sep 2026
32 permits since 2000 (contractor on 31 permits, designer on 2 permits, authorized agent-others on 1 permit, pmt consultant/expediter on 1 permit): 27 completed, 3 in progress, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 11, 2026 | In progress issued Sep 2026 | 1274 Noe St | Lyne Construction | stair repair at front of property less than 50%Details
stair repair at front of property less than 50% | $8,795 |
| Jul 27, 2026 | Completed final sign-off Sep 2026 | 3239 Mission St | Lyne Construction | unit 8: replacement of header + door to 2nd floor rear deck. header @ 3rd floor framing.Details
unit 8: replacement of header + door to 2nd floor rear deck. header @ 3rd floor framing. | $1,200 |
| Jul 8, 2026 | Completed final sign-off Sep 2026 | 3239 Mission St | Lyne Construction | unit 7: restore and repair 1 canilevered deck, less than 50% non street facing, removal of sheetrock from interior ceiling and replace joists rotten, no work street facing.Details
unit 7: restore and repair 1 canilevered deck, less than 50% non street facing, removal of sheetrock from interior ceiling and replace joists rotten, no work street facing. | $13,500 |
| Jul 8, 2026 | Completed final sign-off Sep 2026 | 3239 Mission St | Lyne Construction | unit 8: restore and repair 1 cantilevered decks, removal of sheetrock from interior ceiling and replace rotted joists. less than 50% deck repair, non street facing.Details
unit 8: restore and repair 1 cantilevered decks, removal of sheetrock from interior ceiling and replace rotted joists. less than 50% deck repair, non street facing. | $13,500 |
| Mar 17, 2026 | In progress issued Apr 2026 | 3622 Broderick St | Lyne Construction | all interior remodel, no structural. kitchen remodel, replace water heater, bath #1 replace in-kind;, removal of defunct garage vent/ductDetails
all interior remodel, no structural. kitchen remodel, replace water heater, bath #1 replace in-kind;, removal of defunct garage vent/duct | $30,000 |
| Jan 8, 2026 | Completed final sign-off Feb 2026 | 6 Topaz Wy | Lyne Construction | replacement of sheetrock, small areas where it was removed due to water damage. retile floor of upper bathroom. replacement of kitchen upper cabinetry. replace carpet in upper haulway and back bedroom.Details
replacement of sheetrock, small areas where it was removed due to water damage. retile floor of upper bathroom. replacement of kitchen upper cabinetry. replace carpet in upper haulway and back bedroom. | $7,000 |
| Aug 13, 2025 | Completed final sign-off Aug 2026 | 434 17th Av | Lyne Construction | remodel of master bath.Details
remodel of master bath. | $49,200 |
| Jun 4, 2025 | Completed final sign-off Aug 2025 | 466 Liberty St | Lyne Construction | at front setback, replace landscaping retaining wall and wd fence along the east property line. (approx 12 ft long)Details
at front setback, replace landscaping retaining wall and wd fence along the east property line. (approx 12 ft long) | $10,000 |
| Mar 10, 2025 | Completed final sign-off Jul 2025 | 860 43rd Av | Lyne Construction | remodel of 1/floor (e) kitchen and(e) bathroom. add french door to rear yard.Details
remodel of 1/floor (e) kitchen and(e) bathroom. add french door to rear yard. | $64,000 |
| Jan 22, 2025 | Completed final sign-off Mar 2025 | 150 Santa Marina St | Lyne Construction | dry rot repair, remove existing tile deck, inspect framing, reframe as necessary. approx. size area of deck 55 sq.ft.Details
dry rot repair, remove existing tile deck, inspect framing, reframe as necessary. approx. size area of deck 55 sq.ft. | $5,000 |
| Nov 7, 2024 | Completed final sign-off Dec 2024 | 178 Mary Teresa St | Lyne Construction | interior: roof leak repair of 2x joists and 3 x wall studs. replace in kind. install insulation in area that's opened and being worked on. install sheetrock mod and tape. maintain fire rating.Details
interior: roof leak repair of 2x joists and 3 x wall studs. replace in kind. install insulation in area that's opened and being worked on. install sheetrock mod and tape. maintain fire rating. | $1,500 |
| Aug 7, 2024 | Completed final sign-off Jan 2025 | 1556 36th Av | Lyne Construction | remodel (1) kitchen and 2 bathrooms at 2nd & 3rd floor. replace 1 window in patio, and change sliding patio door to french door at patioDetails
remodel (1) kitchen and 2 bathrooms at 2nd & 3rd floor. replace 1 window in patio, and change sliding patio door to french door at patio | $91,000 |
| Apr 11, 2024 | Completed final sign-off Apr 2024 | 1033 Lake St | Lyne Construction | deck repair less than 50% replace two posts & piers not facing streetDetails
deck repair less than 50% replace two posts & piers not facing street | $1,890 |
| Nov 9, 2023 | Completed final sign-off Aug 2024 | 1303 Cortland Av | Lyne Construction | at rear yard, remove (e) deck & stairs and build new deck and stairs.Details
at rear yard, remove (e) deck & stairs and build new deck and stairs. | $15,000 |
| Jul 12, 2023 | Completed final sign-off Dec 2023 | 595 Diamond St | Lyne Construction | demo of 2 bathroomsDetails
demo of 2 bathrooms | $5,000 |
| Jul 6, 2023 | Completed final sign-off Apr 2024 | 2330 40th Av | Lyne Construction | (2) front windows to be wood alum clad.Details
(2) front windows to be wood alum clad. | $6,000 |
| Jun 15, 2023 | Expired or cancelled expired Sep 2025 | 3350 Taraval St | to comply w/nov# 202308977,demo & remove e fridges, install n walk-in 14 door frdige move non structrial wall @ back of store, install n tile throughout store, add 2 new 20amp breaker to e sub panel dfor walk-in fridge, install n ada compliant counter.Details
to comply w/nov# 202308977,demo & remove e fridges, install n walk-in 14 door frdige move non structrial wall @ back of store, install n tile throughout store, add 2 new 20amp breaker to e sub panel dfor walk-in fridge, install n ada compliant counter. | $5,000 | |
| Dec 13, 2022 | In progress issued Nov 2023 | 4 Persia Av | Lyne Construction | install door bell, install door kick plate, replace extg handle to be ada compliant. add bevelling to extg scope at elevation. application attached to abe 201912109593.Details
install door bell, install door kick plate, replace extg handle to be ada compliant. add bevelling to extg scope at elevation. application attached to abe 201912109593. | $200 |
| Sep 6, 2022 | Completed final sign-off Apr 2023 | 2519 Pacific Av | Lyne Construction | referencing 202008222433, 202106102133 change to location of therapy spa and adjustments to structural detailsDetails
referencing 202008222433, 202106102133 change to location of therapy spa and adjustments to structural details | |
| May 16, 2022 | Completed final sign-off Jul 2022 | 2299 Sacramento St | Lyne Construction | bathroom remodel replacement in kind. apt 4.Details
bathroom remodel replacement in kind. apt 4. | $20,000 |
| Feb 28, 2022 | Completed final sign-off Apr 2022 | 128 Lundys Ln | Lyne Construction | in-kind remodeling of 1 kitchen(s) in 1st flDetails
in-kind remodeling of 1 kitchen(s) in 1st fl | $11,000 |
| Dec 14, 2021 | Completed final sign-off Jan 2023 | 595 Vienna St | Lyne Construction | replace (e) rear exterior stairway in-kind per sf bldg code 1011.12.3, stairway replacementDetails
replace (e) rear exterior stairway in-kind per sf bldg code 1011.12.3, stairway replacement | $8,000 |
| Jun 10, 2021 | Completed final sign-off Apr 2023 | 2519 Pacific Av | Lyne Construction, Doherty Restoration, Inc. | ref pa# 202008222433. new concrete floor slab and new concrete wall & footing at (e) basement level: (e) bathroom & (e) office area only.Details
ref pa# 202008222433. new concrete floor slab and new concrete wall & footing at (e) basement level: (e) bathroom & (e) office area only. | $15,000 |
| Feb 11, 2021 | Completed final sign-off Nov 2021 | 3960 20th St | Lyne Construction | removal of post at 3rd floor. ref pa# 202012019915.Details
removal of post at 3rd floor. ref pa# 202012019915. | $10,000 |
| Dec 11, 2020 | Completed final sign-off Jul 2021 | 2087 46th Av | Lyne Construction | construction of indoor gas fireplace in family room. installation of backyard gas fireplace.Details
construction of indoor gas fireplace in family room. installation of backyard gas fireplace. | $10,000 |
| Dec 1, 2020 | Completed final sign-off Nov 2021 | 3960 20th St | Lyne Construction | kitchen remodelDetails
kitchen remodel | $25,000 |
| Dec 1, 2020 | Completed final sign-off Mar 2021 | 145 25th Av | Lyne Construction | bathroom remodel, replacement in-kindDetails
bathroom remodel, replacement in-kind | $8,000 |
| Aug 22, 2020 | Completed final sign-off Apr 2023 | 2519 Pacific Av | Lyne Construction, Doherty Restoration, Inc., Mrcc | renovate existing exterior deck system at rear yard area. new therapy spa at exterior deck. new exterior stairs on grade at rear yard. new exterior doors and window system to replace existing at basement and 1st fl(rear elevation).Details
renovate existing exterior deck system at rear yard area. new therapy spa at exterior deck. new exterior stairs on grade at rear yard. new exterior doors and window system to replace existing at basement and 1st fl(rear elevation). | $75,000 |
| Mar 2, 2020 | Completed final sign-off Jul 2020 | 198 Dolores St | Lyne Construction | #6: remodel 1 kitchen & 1 bath. demo floor and wall tiles in bathroom plus toilet sink and vanity. replace with (n) tile new plumbing valve new toilet to shower. in kitchen remove 1 cabinet, add 6 lights, paint cabinets and replace countertops.Details
#6: remodel 1 kitchen & 1 bath. demo floor and wall tiles in bathroom plus toilet sink and vanity. replace with (n) tile new plumbing valve new toilet to shower. in kitchen remove 1 cabinet, add 6 lights, paint cabinets and replace countertops. | $14,000 |
| Nov 9, 2018 | Never finaled issued Nov 2018, no final | 222 Anderson St | Lyne Construction | replacement of downdraft & remote blowerDetails
replacement of downdraft & remote blower | $500 |
| Jun 20, 2018 | Completed final sign-off Aug 2018 | 222 Anderson St | Lyne Construction | structural repair, add grade beam to (e) foundation to tie together (e) footings, also add joists to create 16" oc framiing where as now is 24" oc, some plumbing & elec to be reroutedDetails
structural repair, add grade beam to (e) foundation to tie together (e) footings, also add joists to create 16" oc framiing where as now is 24" oc, some plumbing & elec to be rerouted | $8,000 |
| May 25, 2018 | Completed final sign-off Nov 2018 | 2090 Castro St | Lyne Construction | install new gas direct vent fireplace with complete fireplace flue venting. run electrical junction box from garage below. gas line already exist. gas connect only. install per mfr instructionsDetails
install new gas direct vent fireplace with complete fireplace flue venting. run electrical junction box from garage below. gas line already exist. gas connect only. install per mfr instructions | $550 |