Craig O'connell
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Craig O'connell, Architect
- Based in
- San Francisco
- On San Francisco permits
- May 2009 to Sep 2026
82 permits since 2000 (architect on 80 permits, engineer on 2 permits, authorized agent-others on 1 permit): 45 completed, 15 in progress, 14 never finaled, 8 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 23, 2026 | In progress issued Sep 2026 | 2171 39th Av | Canseco Construction Corp | revision to pa #202203109681. close existing door opening between hallway and garage.Details
revision to pa #202203109681. close existing door opening between hallway and garage. | |
| Aug 18, 2026 | In progress filed Aug 2026, not yet issued | 1030 Leavenworth St | field revision to 201805079427 s1/r1, minor interior reconfiguration levels 2-3, 4th level expansion per planning approval 2025-010791 prt. glass roof variance approval over rear yard 2023-006751 varDetails
field revision to 201805079427 s1/r1, minor interior reconfiguration levels 2-3, 4th level expansion per planning approval 2025-010791 prt. glass roof variance approval over rear yard 2023-006751 var | $150,000 | |
| Jul 9, 2026 | In progress issued Jul 2026 | 2939 Vallejo St | Seamus Melaugh Construction | demo sections of wall and install new railing and gate new tile on stepsDetails
demo sections of wall and install new railing and gate new tile on steps | $80,000 |
| Mar 31, 2026 | Completed final sign-off Jun 2026 | 115 Nevada St | Perez Construction Llc. | revision to permit 202512101385. install new skylight at roof and window at garage. underpinning approx. 10' on the north side of first floor.Details
revision to permit 202512101385. install new skylight at roof and window at garage. underpinning approx. 10' on the north side of first floor. | $20,000 |
| Mar 27, 2026 | In progress issued Mar 2026 | 3338 Scott St | Next Level Construction | skylight installation in primary bathroom. revision to bpa: 2026.0116.4049Details
skylight installation in primary bathroom. revision to bpa: 2026.0116.4049 | $5,800 |
| Jan 16, 2026 | In progress issued Jan 2026 | 3338 Scott St | The Meticulous Handyman Llc, Next Level Construction | remodel 1 bathroom & 1 kitchen. add 1 new bathroom to (e) footprint. washer/dryer in-unit relocation. all work on level 3.Details
remodel 1 bathroom & 1 kitchen. add 1 new bathroom to (e) footprint. washer/dryer in-unit relocation. all work on level 3. | $98,000 |
| Dec 10, 2025 | Completed final sign-off Jun 2026 | 115 Nevada St | Perez Construction Llc. | interior remodel - level 1 bath 404 sf of renovation within level 1 only existing office, living room, bath. new storageDetails
interior remodel - level 1 bath 404 sf of renovation within level 1 only existing office, living room, bath. new storage | $95,000 |
| Dec 9, 2025 | In progress issued Jan 2026 | 161 Del Monte St | Bay Build Design Inc | provide new bedroom, new bathroom and media area at existing level 1 garage and storage area. new interior stair from level 1 to level 2. minor interior remodel at level 2 living room.Details
provide new bedroom, new bathroom and media area at existing level 1 garage and storage area. new interior stair from level 1 to level 2. minor interior remodel at level 2 living room. | $120,000 |
| Dec 9, 2025 | In progress issued Mar 2026 | 3776 Cesar Chavez St | Canseco Construction Corp | revision to pa# 2025-0702-0033: expand the area of the previously approved roof deck, add new rolling skylight adjacent to roof hatch, construct new bathroom and media room in level 1, perform minor structural modifications per field/construction conditions.Details
revision to pa# 2025-0702-0033: expand the area of the previously approved roof deck, add new rolling skylight adjacent to roof hatch, construct new bathroom and media room in level 1, perform minor structural modifications per field/construction conditions. | $10,000 |
| Sep 3, 2025 | Completed final sign-off Sep 2026 | 999 Green St | The Meticulous Handyman Llc | unit 2902: revision to permit 202508042250 - move primary bathroom wall (non load bearing) 2 feet to relocate laundry closet and relocate bathroom vanity.Details
unit 2902: revision to permit 202508042250 - move primary bathroom wall (non load bearing) 2 feet to relocate laundry closet and relocate bathroom vanity. | $2,000 |
| Jul 9, 2025 | In progress issued Jul 2026 | 308 Seacliff Av | Van Acker Const Assoc Inc | addition of structural slab & guardrail at rear yard.Details
addition of structural slab & guardrail at rear yard. | $10,000 |
| Jul 2, 2025 | In progress issued Aug 2025 | 3776 Cesar Chavez St | Canseco Construction Corp | interior renovation: vertical addition (329 sq.ft) on level 3 with roof deck above.Details
interior renovation: vertical addition (329 sq.ft) on level 3 with roof deck above. | $237,000 |
| May 21, 2025 | Completed final sign-off Apr 2026 | 707 Douglass St | Pristine Builders Group | revision to pa # 202409181084: expansion of lower level shop. removal of interior bearing wall at storage area. new steel beam per structural. no exterior alteration visible from st.Details
revision to pa # 202409181084: expansion of lower level shop. removal of interior bearing wall at storage area. new steel beam per structural. no exterior alteration visible from st. | $35,000 |
| Dec 9, 2024 | In progress filed Dec 2024, not yet issued | 2631 Ulloa St | Canseco Construction Corp | revision to pa # 2021-0712-4131 installing metal rail instead of glass and install regular door instead of hatchDetails
revision to pa # 2021-0712-4131 installing metal rail instead of glass and install regular door instead of hatch | |
| Oct 21, 2024 | In progress issued Mar 2025 | 707 Douglass St | Pristine Builders Group | foundation replacement; new interior stair; remodel 2 bathrooms; new platform at grade; convert laundry to shop. no exterior alterationsDetails
foundation replacement; new interior stair; remodel 2 bathrooms; new platform at grade; convert laundry to shop. no exterior alterations | $387,000 |
| Oct 4, 2023 | In progress issued Feb 2024 | 1980 Sutter St | unit 305: level 1 - remove ladder to level 2 balcony. bathroom replace in kind. level 2 - infill ladder opening. add 4 skylights over open air parapet/balcony area to enclose within level 2. bathroom replace in kind.Details
unit 305: level 1 - remove ladder to level 2 balcony. bathroom replace in kind. level 2 - infill ladder opening. add 4 skylights over open air parapet/balcony area to enclose within level 2. bathroom replace in kind. | $25,000 | |
| Jun 28, 2023 | Never finaled filed Jun 2023, never issued | 1030 Leavenworth St | Union Pierce Construction | retain glass roof at rear yard & 3 exterior walls that require legalization.Details
retain glass roof at rear yard & 3 exterior walls that require legalization. | $15,000 |
| Jun 14, 2023 | In progress issued Feb 2024 | 3625 Jackson St | Francis Mullan Construction | new 413 sf roof deck at existing level 3 of single family homeDetails
new 413 sf roof deck at existing level 3 of single family home | $50,000 |
| Apr 21, 2023 | In progress issued Sep 2024 | 1701 Broderick St | Seamus Melaugh Construction | foundation update for lvel 1 addition (unit 1701): (n) bath , kitchenette, bedroom. level 2 & 3 (unit 1703): renovation to (e) floor plan layouts. (n) level 3 interior stair to roof deck. (n) roof deck w/ pop up stair & trellis. 2nd fl rear deckDetails
foundation update for lvel 1 addition (unit 1701): (n) bath , kitchenette, bedroom. level 2 & 3 (unit 1703): renovation to (e) floor plan layouts. (n) level 3 interior stair to roof deck. (n) roof deck w/ pop up stair & trellis. 2nd fl rear deck | $150,000 |
| Mar 9, 2023 | Never finaled issued May 2023, no final | 205 Chenery St | infill addition under 10'-0. remodel (e) bedroom @ level 1 and bathroom. existing garage area to remainDetails
infill addition under 10'-0. remodel (e) bedroom @ level 1 and bathroom. existing garage area to remain | $150,000 | |
| Jan 9, 2023 | Completed final sign-off Mar 2024 | 4300 17th St | revsion to pa# 2022-0314-9894, intent to comply w/2022 ca code and delete fire sprinklers work scope. and revise occupancy change from r-2 to r-3, (two units + 1 adu).Details
revsion to pa# 2022-0314-9894, intent to comply w/2022 ca code and delete fire sprinklers work scope. and revise occupancy change from r-2 to r-3, (two units + 1 adu). | ||
| Dec 19, 2022 | Completed final sign-off May 2023 | 2394 Folsom St | Northbay Home Construction Solutions Inc | tenant improvement of existing space into pottery studio with kiln. new sinks. no exterior work.Details
tenant improvement of existing space into pottery studio with kiln. new sinks. no exterior work. | $47,200 |
| Aug 8, 2022 | Never finaled issued Oct 2022, no final | 255 Eureka St | Francis Mullan Construction | remodel of basement level constructing w/ new interior stair to level 2 which included new media, new l/r, new office & new bath. no exterior workDetails
remodel of basement level constructing w/ new interior stair to level 2 which included new media, new l/r, new office & new bath. no exterior work | $45,732 |
| Jun 16, 2022 | Completed final sign-off Mar 2023 | 3650 17th St | Diaz Construction | remodel (e) kitchen and bathroom. addition of (n) full bath. (n) skylights per plan.Details
remodel (e) kitchen and bathroom. addition of (n) full bath. (n) skylights per plan. | $250,000 |
| Mar 21, 2022 | Completed final sign-off Aug 2023 | 549 Bowdoin St | Beyond The Horizon Construction | remodel of kitchen, removal of load bearing wall. new interior stair linking level 1 to level 2. level 1: new glass door system to rear yard + minor interior structural work around new stair.Details
remodel of kitchen, removal of load bearing wall. new interior stair linking level 1 to level 2. level 1: new glass door system to rear yard + minor interior structural work around new stair. | $200,000 |
| Mar 10, 2022 | In progress issued Apr 2025 | 2171 39th Av | Canseco Construction Corp | two story addition @ rear yard (18'x20ft+720 sqft (n) primary bedroom & bath, gym, living space, (n) exterior deck (115 sqft). remodel (e) kitchen @ 2nd level, 2 (n) skylights.Details
two story addition @ rear yard (18'x20ft+720 sqft (n) primary bedroom & bath, gym, living space, (n) exterior deck (115 sqft). remodel (e) kitchen @ 2nd level, 2 (n) skylights. | $150,000 |
| Mar 1, 2022 | Completed final sign-off Sep 2022 | 1412 Golden Gate Av | Beyond The Horizon Construction | revision to 202111233036. relocation of structural work.Details
revision to 202111233036. relocation of structural work. | |
| Sep 20, 2021 | Completed final sign-off May 2025 | 457 Diamond St | Andrew Gallagher Construction, Beyond The Horizon Construction | one story horizontal addition. (n) bedrooms (2) ground floor level 1. addition of interior stair from level to level 2.(n) bathroom @ level 1.Details
one story horizontal addition. (n) bedrooms (2) ground floor level 1. addition of interior stair from level to level 2.(n) bathroom @ level 1. | $500,000 |
| Sep 14, 2021 | Completed final sign-off May 2023 | 851 27th St | Beyond The Horizon Construction | addition to 182 sf roof deck and exterior spiral stairs access roof deck at rear yardDetails
addition to 182 sf roof deck and exterior spiral stairs access roof deck at rear yard | $70,000 |
| Jul 12, 2021 | Never finaled issued Oct 2022, no final | 2631 Ulloa St | addition of 375 sf roof deck and addition of interior stair to deck from 2nd level, and accessDetails
addition of 375 sf roof deck and addition of interior stair to deck from 2nd level, and access | $150,000 | |
| Feb 23, 2021 | Expired or cancelled cancelled Jan 2026 | 878 Lombard St | roof deck addition of 500 sqft (private) over 3rd floor unit. utilize existing stair access. new guardrails + small outdoor cabinetry with sink.Details
roof deck addition of 500 sqft (private) over 3rd floor unit. utilize existing stair access. new guardrails + small outdoor cabinetry with sink. | $75,000 | |
| Sep 1, 2020 | Completed final sign-off Dec 2021 | 559 32nd Av | interior renovations including updating kitchen, bathrooms, dining rooms, and bedrooms.Details
interior renovations including updating kitchen, bathrooms, dining rooms, and bedrooms. | $250,000 | |
| Jan 13, 2020 | Never finaled issued Jan 2020, no final | 1386 10th Av | provide new deck landings and 6'diameter steel spiral stair for access from 2nd & 3rd floor yard. spiral stair provided by steel stair subcontractor insall of stair by local generalDetails
provide new deck landings and 6'diameter steel spiral stair for access from 2nd & 3rd floor yard. spiral stair provided by steel stair subcontractor insall of stair by local general | $19,000 | |
| Dec 31, 2019 | Expired or cancelled withdrawn Dec 2021 | 4300 17th St | construction of accessory dwelling unit under ord 162-16Details
construction of accessory dwelling unit under ord 162-16 | $100,000 | |
| Dec 31, 2019 | Expired or cancelled withdrawn Dec 2021 | 4300 17th St | roofdeck on existing bldg to large project (2019-013808 prj)Details
roofdeck on existing bldg to large project (2019-013808 prj) | $25,000 | |
| Dec 18, 2019 | Expired or cancelled withdrawn Mar 2022 | 4300 17th St | to erect a detached 4-story, no basement, type 3a, 2 residential units + 1 adu unit(per ord# 162-17) building.Details
to erect a detached 4-story, no basement, type 3a, 2 residential units + 1 adu unit(per ord# 162-17) building. | $950,000 | |
| Oct 15, 2019 | Never finaled issued Oct 2019, no final | 370 02nd Av | Wah Wong Construction Inc | demo fireplace and chimney at all 3 levels. demo level 2 bath and level 2 kitchen. demo/remove part of wall at level 2 kitchen to analyze possible structural and remove if possible. n/a for maherDetails
demo fireplace and chimney at all 3 levels. demo level 2 bath and level 2 kitchen. demo/remove part of wall at level 2 kitchen to analyze possible structural and remove if possible. n/a for maher | $2,000 |
| Aug 19, 2019 | Never finaled filed Aug 2019, never issued | 149 London St | renovate (e) home @ each level. (n) foundation & expansion of 1st fl level. addition to rear of house & @ 3rd fl level. (n) roof. (n) 2-story deck @ rear yard. (n) front entry stair to replace (e) non-conforming stairDetails
renovate (e) home @ each level. (n) foundation & expansion of 1st fl level. addition to rear of house & @ 3rd fl level. (n) roof. (n) 2-story deck @ rear yard. (n) front entry stair to replace (e) non-conforming stair | $375,000 | |
| Jul 3, 2019 | Expired or cancelled withdrawn Feb 2023 | 2717 Union St | Beyond The Horizon Construction | addition of 491 sq ft roof deck with internal access from 4th fl unit only.Details
addition of 491 sq ft roof deck with internal access from 4th fl unit only. | $105,000 |
| May 29, 2019 | Completed final sign-off May 2020 | 1386 10th Av | Steadfast Bay Construction | remodel of (e) 1st flr - bathrm, ofc & den in kind. 2nd flr - kitchen, open wall to (e) medica rm. replace windows at rear ext wall. repair (e) dryrot deck and ext stair less than 50%Details
remodel of (e) 1st flr - bathrm, ofc & den in kind. 2nd flr - kitchen, open wall to (e) medica rm. replace windows at rear ext wall. repair (e) dryrot deck and ext stair less than 50% | $105,000 |
| Feb 11, 2019 | Completed final sign-off Jun 2020 | 811 41st Av | Creative Designs Construction | interior remodel of existing 1st floor garage space. provide bedroom, media room & den. relocate existing bath, replace garage door in same opening, relocate existing garage entry, door to opposite side of alcoveDetails
interior remodel of existing 1st floor garage space. provide bedroom, media room & den. relocate existing bath, replace garage door in same opening, relocate existing garage entry, door to opposite side of alcove | $50,000 |
| Dec 4, 2018 | Never finaled issued Feb 2019, no final | 1030 Leavenworth St | Union Pierce Construction | foundation upgrade to existing basement level. excavation and expansion of existing wine cellar. minor remodel to existing bath, re-frame existing stair to 1st level.Details
foundation upgrade to existing basement level. excavation and expansion of existing wine cellar. minor remodel to existing bath, re-frame existing stair to 1st level. | $60,000 |
| Nov 29, 2018 | Completed final sign-off May 2019 | 3735 20th St | Spryscapes Const Inc. | new deck at rear yard within setback line, small patio on grade off new deck. existing deck and stairs to remain.Details
new deck at rear yard within setback line, small patio on grade off new deck. existing deck and stairs to remain. | $20,000 |
| Nov 8, 2018 | Expired or cancelled withdrawn Jul 2026 | 3355 21st St | remove existing dry rot damaged egress wood stairs at rear yard, new 3-story stair as designed to replace previously permitted stairDetails
remove existing dry rot damaged egress wood stairs at rear yard, new 3-story stair as designed to replace previously permitted stair | $30,000 | |
| Aug 29, 2018 | Completed final sign-off Feb 2019 | 811 41st Av | Creative Designs Construction | kitchen remodel and new stackable washer & dryer off kitchen. full bathroom remodel and powder room update. all work is 2nd fl.Details
kitchen remodel and new stackable washer & dryer off kitchen. full bathroom remodel and powder room update. all work is 2nd fl. | $35,000 |
| Jun 1, 2018 | Never finaled filed Jun 2018, never issued | 53 Diamond St | replace (e) rear stairs & deck.Details
replace (e) rear stairs & deck. | $8,000 | |
| May 17, 2018 | Never finaled issued Jun 2021, no final | 1030 Leavenworth St | Union Pierce Construction | remodel work @ (e) levels 1-3 remove (e) roof deck @ roof above. addition @ 3rd level. add observation deck. no excavation work under this pa. ** maher: n/a **; refer to bldg routing/addenda report for change of description of proposed work, dmj, 04/14/2021;Details
remodel work @ (e) levels 1-3 remove (e) roof deck @ roof above. addition @ 3rd level. add observation deck. no excavation work under this pa. ** maher: n/a **; refer to bldg routing/addenda report for change of description of proposed work, dmj, 04/14/2021; | $200,000 |
| Nov 30, 2017 | Completed final sign-off Nov 2018 | 1133 Greenwich St | Amn Construction | remodel existing kitchen at 2nd flr including cabinets and new lighting. remodel bathrooms on 3rd and 4th flrs. maher naDetails
remodel existing kitchen at 2nd flr including cabinets and new lighting. remodel bathrooms on 3rd and 4th flrs. maher na | $30,000 |
| Sep 8, 2017 | Completed final sign-off Jan 2018 | 530 Chestnut St | A M G Construction | 302c: remodel extg kitchen in kind, remodel extg master bathroom in kind on 3rd floor of multi unit bldg. n/a for maherDetails
302c: remodel extg kitchen in kind, remodel extg master bathroom in kind on 3rd floor of multi unit bldg. n/a for maher | $25,000 |
| Aug 25, 2017 | Completed final sign-off Jul 2019 | 3735 20th St | Spryscapes Const Inc. | repair (e) wood framed windows at gront of house; provide new window at level bathroom. repair other windows ash shown in kind.Details
repair (e) wood framed windows at gront of house; provide new window at level bathroom. repair other windows ash shown in kind. | $15,000 |
| Jul 25, 2017 | Completed final sign-off Jul 2018 | 1530 11th Av | Mizen Construction Inc | 67 sf addition @ corner of 1st flr & sitting room on 2nd flr to nort east corner of house.Details
67 sf addition @ corner of 1st flr & sitting room on 2nd flr to nort east corner of house. | $5,000 |
| Jul 21, 2017 | Completed final sign-off Aug 2018 | 200 Andover St | provide new wet bar @ 2nd fl including new sink, lighting & prep area. new cased opening at hallway between dining & wet barDetails
provide new wet bar @ 2nd fl including new sink, lighting & prep area. new cased opening at hallway between dining & wet bar | $5,000 | |
| Apr 24, 2017 | Completed final sign-off Mar 2019 | 2336 Divisadero St | Avila & Wadlington Contractors Inc | remodel 1st level inlaw unit. minor structural work 1st slvel. kitchen remdoel 2nd fl, new master bath, remodel and addition of kids bath 3rd flDetails
remodel 1st level inlaw unit. minor structural work 1st slvel. kitchen remdoel 2nd fl, new master bath, remodel and addition of kids bath 3rd fl | $200,000 |
| Jul 28, 2016 | Never finaled issued Feb 2017, no final | 1530 11th Av | Mizen Construction Inc | remodel of (e) kitchen, new deck, remodel of (e) 2nd floor bath.Details
remodel of (e) kitchen, new deck, remodel of (e) 2nd floor bath. | $30,000 |
| Jun 7, 2016 | Completed final sign-off Jan 2017 | 2540 Vallejo St | Centric Building Inc. | minor work at 1st floor garage level incl demo mechanical equip & relocate water heater, new post & footing. kitchen remodel at 2nd floor, bathroom remodel at 3rd floor, replace existing hvac units with new.Details
minor work at 1st floor garage level incl demo mechanical equip & relocate water heater, new post & footing. kitchen remodel at 2nd floor, bathroom remodel at 3rd floor, replace existing hvac units with new. | $150,000 |
| Feb 3, 2016 | Completed final sign-off Sep 2016 | 530 Flood Av | Mizen Construction Inc | remodel of (e) 1st flr garage space into bedroom, bath & study.new open interior stair to replace non-conforming stair. minor interior remodel work at 2nd flr, removal of interior walls to open space. new radiant floor heat throughout.Details
remodel of (e) 1st flr garage space into bedroom, bath & study.new open interior stair to replace non-conforming stair. minor interior remodel work at 2nd flr, removal of interior walls to open space. new radiant floor heat throughout. | $120,000 |
| Jan 14, 2016 | Never finaled filed Jan 2016, never issued | 4448 24th St | renovation of an (e) single family cottage. keep (e) 1st floor with east & west facing exterior walls. provide new garage level, remodel kitchen and bath at 1st floor. provide updated 3rd floor with guest bedrooms. extension @ 2nd floor.Details
renovation of an (e) single family cottage. keep (e) 1st floor with east & west facing exterior walls. provide new garage level, remodel kitchen and bath at 1st floor. provide updated 3rd floor with guest bedrooms. extension @ 2nd floor. | $180,000 | |
| Dec 17, 2015 | Completed final sign-off Jul 2016 | 1448 10th Av | Mizen Construction Inc | remodel of existing 3rd floor unit. provide new master bathroom. provide new kitchen. extend landing for egress stair. seismic under seperate permit.Details
remodel of existing 3rd floor unit. provide new master bathroom. provide new kitchen. extend landing for egress stair. seismic under seperate permit. | $130,000 |
| Aug 13, 2015 | Completed final sign-off Mar 2016 | 111 Germania St | revision to app#201503201493. installation of 3 new skylights in kitchen and replace one skylight in bath. not visible from street.Details
revision to app#201503201493. installation of 3 new skylights in kitchen and replace one skylight in bath. not visible from street. | $2,000 | |
| Feb 26, 2015 | Completed final sign-off Mar 2015 | 88 King St | Doyle Developments | #510 - revision to pa #2013.0918.7139: moving laundry from outside bathroom to inside the bathroom. n/a maher ordinanceDetails
#510 - revision to pa #2013.0918.7139: moving laundry from outside bathroom to inside the bathroom. n/a maher ordinance | |
| Aug 22, 2014 | Completed final sign-off Mar 2016 | 222 Walnut St | Plath & Company Inc | expand existing single car garage for side by side 2 car garage. additional 208 sf of garage added to south side of space. minor interior remodeling work of laundry room & interior stair.Details
expand existing single car garage for side by side 2 car garage. additional 208 sf of garage added to south side of space. minor interior remodeling work of laundry room & interior stair. | $235,000 |
| Jun 10, 2014 | Completed final sign-off Oct 2015 | 3735 20th St | Vonnegut Thoreau Construction | new interior staircase from 2nd floor to attic floor. type 13r sprinklers provided by subcontractor on separate permit for upper floor only.Details
new interior staircase from 2nd floor to attic floor. type 13r sprinklers provided by subcontractor on separate permit for upper floor only. | $15,000 |
| Jun 5, 2014 | Completed final sign-off Sep 2014 | 3245 21st St | K Bali Construction | remodel first floor per plan. kitchen and batroom remodel. new posts and beam.Details
remodel first floor per plan. kitchen and batroom remodel. new posts and beam. | $75,000 |
| May 15, 2014 | Completed final sign-off Mar 2016 | 3245 21st St | renovation of existing victorian flat & small adddition of habitable space within rear yard for laundry room.Details
renovation of existing victorian flat & small adddition of habitable space within rear yard for laundry room. | $70,000 | |
| Apr 14, 2014 | Completed final sign-off Jun 2015 | 1336 Vermont St | remodel at 1st & 2nd floor of a 2 unit, 3 story building. kitchen & bath, no work on top floor. compliance with ordinance no. 155-13 not required.Details
remodel at 1st & 2nd floor of a 2 unit, 3 story building. kitchen & bath, no work on top floor. compliance with ordinance no. 155-13 not required. | $100,000 | |
| Mar 31, 2014 | Never finaled issued Apr 2014, no final | 2 Fair Oaks St | unit #2 - renovation of a 911 s.f. apt - remodel existing kitchen & bathroom within (e) locations.Details
unit #2 - renovation of a 911 s.f. apt - remodel existing kitchen & bathroom within (e) locations. | $50,000 | |
| Dec 30, 2013 | Completed final sign-off Nov 2014 | 960 Wisconsin St | Phase 2 Builders | addition of (n) bathroom with (e) closet off hallway on 2nd floor. convert study to media center.Details
addition of (n) bathroom with (e) closet off hallway on 2nd floor. convert study to media center. | $15,000 |
| Sep 18, 2013 | Completed final sign-off Mar 2015 | 88 King St | Doyle Developments | unit #510-remodel of (e) kitchen & master bathroom. provide new fixtures & finishes as shown on new plans. relocate washer & dryer to hallwayDetails
unit #510-remodel of (e) kitchen & master bathroom. provide new fixtures & finishes as shown on new plans. relocate washer & dryer to hallway | $50,000 |
| May 29, 2013 | Completed final sign-off Dec 2013 | 1034 Noe St | Vonnegut Thoreau Construction | front elevation improvement to extg facade. provide new exterior material and details as indicated on plans. provide new code complaint handrail and guardrail at entry stair. new windows to fit within extg openings at 2nd floor. windows to match existing.Details
front elevation improvement to extg facade. provide new exterior material and details as indicated on plans. provide new code complaint handrail and guardrail at entry stair. new windows to fit within extg openings at 2nd floor. windows to match existing. | $60,000 |
| Dec 17, 2012 | Completed final sign-off Oct 2014 | 650 Delancey St | S.E.A Construction | #205 - remodel existing 120 sf ktichen @ main floor loft.Details
#205 - remodel existing 120 sf ktichen @ main floor loft. | $8,000 |
| Oct 26, 2012 | Completed final sign-off Nov 2013 | 650 Delancey St | S.E.A Construction | unit #103 - remodel of 2 existing bathrooms & 1 kitchen, full demo of spaces plus all new fixtures, finishes & lighting.Details
unit #103 - remodel of 2 existing bathrooms & 1 kitchen, full demo of spaces plus all new fixtures, finishes & lighting. | $60,000 |
| Sep 7, 2012 | Completed final sign-off Feb 2013 | 47 Levant St | K Bali Construction | new 400 sq. ft. roof deck over existing detached 2-car garageDetails
new 400 sq. ft. roof deck over existing detached 2-car garage | $50,000 |
| Sep 6, 2012 | Never finaled issued Sep 2012, no final | 127 Connecticut St | remodel of extg 3rd floor flat, remodel extg kitchen, remodel extg bathroom.Details
remodel of extg 3rd floor flat, remodel extg kitchen, remodel extg bathroom. | $114,000 | |
| Jun 20, 2012 | Completed final sign-off Feb 2013 | 28 Precita Av | Spotlight Construction Groups Inc | change of use from commercial to residential. interior remodel of bathroom, addition of kitchen & media room.Details
change of use from commercial to residential. interior remodel of bathroom, addition of kitchen & media room. | $25,000 |
| Nov 18, 2011 | Expired or cancelled expired Feb 2013 | 760 Market St | 8/f #888 - to comply w/ nov #201162467: interior remodel, minor work - new interior glazing walls & transoms, new lighting throughout, new elect outlets, data & switches, new carpet & paint throughout.Details
8/f #888 - to comply w/ nov #201162467: interior remodel, minor work - new interior glazing walls & transoms, new lighting throughout, new elect outlets, data & switches, new carpet & paint throughout. | $25,000 | |
| Sep 30, 2011 | Completed final sign-off Mar 2012 | 610 Noe St | Division Sf Inc Dba: Hawke Bldg Company | demo two interior walls in kitchen. provide new beams and posts to foundation.Details
demo two interior walls in kitchen. provide new beams and posts to foundation. | $40,000 |
| Sep 22, 2011 | Completed final sign-off Mar 2013 | 1750 43rd Av | addition of 161 sq. ft. master bedroom @ rear portion of house. interior remodel of (e) kitchen & (e) bathroom. new roof deck over addition of bedroom.Details
addition of 161 sq. ft. master bedroom @ rear portion of house. interior remodel of (e) kitchen & (e) bathroom. new roof deck over addition of bedroom. | $100,000 | |
| Aug 8, 2011 | Completed final sign-off Feb 2013 | 767 22nd Av | demolition of (e) rear yard deck. addition of 165 sq. ft structure. to fit (e) deck space. 2 story addtion (garage level & 1st floor). kitchen & bathroom remodel on 1st floor. (n) bedrood & bathroom @ garage level.Details
demolition of (e) rear yard deck. addition of 165 sq. ft structure. to fit (e) deck space. 2 story addtion (garage level & 1st floor). kitchen & bathroom remodel on 1st floor. (n) bedrood & bathroom @ garage level. | $100,000 | |
| Dec 14, 2010 | Expired or cancelled expired Dec 2015 | 33 Carl St | Cas Construction | unit #33: new powder room with stackable washer & dryer in nearby (e) closet on 1st floor. relocation of (e) toilet at garage level & new tub & vanity. remove stairs leading from 1st floor to garage level.Details
unit #33: new powder room with stackable washer & dryer in nearby (e) closet on 1st floor. relocation of (e) toilet at garage level & new tub & vanity. remove stairs leading from 1st floor to garage level. | $10,000 |
| Apr 19, 2010 | Completed final sign-off Aug 2010 | 255 Berry St | T H M Construction | renovation of kitchen, demo & replace, change closet into office space. replace wood floor in living room & kitchen. new lighting plan sheetorck & finishes.Details
renovation of kitchen, demo & replace, change closet into office space. replace wood floor in living room & kitchen. new lighting plan sheetorck & finishes. | $110,000 |
| Dec 14, 2009 | Completed final sign-off Dec 2010 | 12 Mint Pz | Paganelli Construction Inc. | revision to pa# 2009/05/15/8495 - re-configuration of entry floor plan.Details
revision to pa# 2009/05/15/8495 - re-configuration of entry floor plan. | |
| May 6, 2009 | Completed final sign-off Jul 2009 | 461 14th St | Vonnegut Thoreau Construction | remove/replace tub from east wall to south wall & replace vanity/sink, replace (e) & new fixtures, outlet, add skylight, toilet, sconce (light) at bathroom on 3rd floor.wall believed to be non bearing.Details
remove/replace tub from east wall to south wall & replace vanity/sink, replace (e) & new fixtures, outlet, add skylight, toilet, sconce (light) at bathroom on 3rd floor.wall believed to be non bearing. | $20,000 |