Cory Bannon
- Listed as
- engineer
- Firm
- Kpff
- Based in
- San Francisco
- On San Francisco permits
- Sep 2020 to Jul 2026
3 permits since 2000 (engineer on 3 permits): 2 completed, 1 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 22, 2026 | In progress filed Jul 2026, not yet issued | 490 Jamestown Av | candlestick area south of harney way development block grades- deep dynamic compaction, surcharge wick drain; site will be raised 2 to 10 feet above the existing ground surface to between elevation 105 feet to 107.5 feet.Details
candlestick area south of harney way development block grades- deep dynamic compaction, surcharge wick drain; site will be raised 2 to 10 feet above the existing ground surface to between elevation 105 feet to 107.5 feet. | $3,000,000 | |
| Sep 30, 2020 | Completed final sign-off Aug 2025 | 4200 Geary Bl | Nibbi Bros Assoc Inc. | 100% affordable housing. to erect a type 1-a, 7-story, 98 senior residential units over ground floor commerical space. open space includes a rear yard and two 7th floor open spaces. all units are adaptable or mobility units. to be on 3 lots 1438-017a, 017 and 016.Details
100% affordable housing. to erect a type 1-a, 7-story, 98 senior residential units over ground floor commerical space. open space includes a rear yard and two 7th floor open spaces. all units are adaptable or mobility units. to be on 3 lots 1438-017a, 017 and 016. | $44,800,000 |
| Sep 30, 2020 | Completed final sign-off Aug 2025 | 4200 Geary Bl | Nibbi Bros Assoc Inc. | to demolish a 2-story, mortuary with one basement.Details
to demolish a 2-story, mortuary with one basement. | $224,982 |