Leroy Chan
- License
- 73217
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- engineer
- Firm
- Engeo
- Based in
- San Francisco
- On San Francisco permits
- Mar 2012 to Jul 2026
3 permits since 2000 (engineer on 3 permits): 2 completed, 1 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Cahill-Nibbi Joint Venture (2), De Silva Gates Construction Llc
- Engineers
- James Fain (2), Cory Michael Bannon
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 0
- Other or unknown 3
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in. 1 of 3 have no building type on record and are shown as other.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 22, 2026 | In progress issued Oct 2026 | 490 Jamestown Av | De Silva Gates Construction Llc | candlestick area south of harney way development block grades- deep dynamic compaction, surcharge wick drain; site will be raised 2 to 10 feet above the existing ground surface to between elevation 105 feet to 107.5 feet.Details
candlestick area south of harney way development block grades- deep dynamic compaction, surcharge wick drain; site will be raised 2 to 10 feet above the existing ground surface to between elevation 105 feet to 107.5 feet. | $3,000,000 |
| Sep 11, 2012 | Completed final sign-off Apr 2014 | 60 West Point Rd | Cahill-Nibbi Joint Venture | revision to appl #2011.0302.1205 (original appl #2010.0722.7184): replace gabion walls (retaining) with keystone walls in grading for a new private park, no structural changes.Details
revision to appl #2011.0302.1205 (original appl #2010.0722.7184): replace gabion walls (retaining) with keystone walls in grading for a new private park, no structural changes. | |
| Mar 8, 2012 | Completed final sign-off Apr 2014 | 519 Keith St | Cahill-Nibbi Joint Venture | revision to pa #201103021206 - to allow construction of an additional mse wall.Details
revision to pa #201103021206 - to allow construction of an additional mse wall. | $20,000 |