Clifton Lowe
- License
- 1985
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- architect
- On San Francisco permits
- Sep 2021 to May 2023
3 permits since 2000 (architect on 3 permits): 1 completed, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Nibbi Bros Assoc Inc. (2), Kz Better Building Construction
- Architects
- Pamela Anee Collier
Where they worked
- Single-family 1
- Multi-family (2-family, apartments) 2
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 26, 2023 | Completed final sign-off Feb 2025 | 2774 California St | Kz Better Building Construction | replacement of front exterior railingDetails
replacement of front exterior railing | $6,000 |
| Mar 7, 2022 | Never finaled issued Jun 2022, no final | 650 Linden St | Nibbi Bros Assoc Inc. | revision for scope market by mod as "deferred approval" on sheet l103 + l700 during permit review. scope is limited to accessible paths for pa# 201912270759, 201912270764, 201912270766, 201912270767, 201912270768, 201912270769.Details
revision for scope market by mod as "deferred approval" on sheet l103 + l700 during permit review. scope is limited to accessible paths for pa# 201912270759, 201912270764, 201912270766, 201912270767, 201912270768, 201912270769. | |
| Sep 23, 2021 | Never finaled issued Oct 2021, no final | 650 Linden St | Nibbi Bros Assoc Inc. | adminstrative permit to remove street tree irrigation as shown on sheets l400, l401, l402, l403, l404. ref. bpa #'s 20191227-0759, -0764, -0765, -0766, -0767, -0768, -0769. mayoral ed-13-01. 100% affordable housing. proposed irrigation was never installed.Details
adminstrative permit to remove street tree irrigation as shown on sheets l400, l401, l402, l403, l404. ref. bpa #'s 20191227-0759, -0764, -0765, -0766, -0767, -0768, -0769. mayoral ed-13-01. 100% affordable housing. proposed irrigation was never installed. |