Permit GraphShortlistSan Francisco building permits since 2000

Brian D Baird

License
948816
Contractor
About the Contractors State License Board
State contractor license record
Listed as
authorized agent-others, contractor
Firm
Corestates Construction Services Inc
Based in
Duluth
On San Francisco permits
Aug 2013 to Oct 2026

25 permits since 2000 (contractor on 25 permits, authorized agent-others on 2 permits): 12 completed, 12 in progress, 1 never finaled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. Their ranked record as a contractor is on their contractor page. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Architects
Stanislav Y. Gorbis (3)
Engineers
Daniel Marketta (6), Benjamin J Liu (2), Justin Uihlein, Trent Robert Martin
Authorized agents
David J. Costello

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in. 1 of 25 have no building type on record and are shown as other.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Oct 16, 2026In progress
issued Nov 2026
1880 Steiner StCorestates Construction Services Increvision to pa 202604028792, reduction from five to two charging stations.
Details
Permit
202609288687
Permit issued
Nov 20, 2026

revision to pa 202604028792, reduction from five to two charging stations.

Open the permit page

$45,521
Sep 10, 2026In progress
filed Sep 2026, not yet issued
1483 Mason StCorestates Construction Services Incinstallation of 4 artemis plugzio 48a level 2 ev chargers. evse to be shared by resident and staff ev drivers in ground level covered garage.
Details
Permit
202609107924

installation of 4 artemis plugzio 48a level 2 ev chargers. evse to be shared by resident and staff ev drivers in ground level covered garage.

Open the permit page

$48,408
Sep 2, 2026In progress
filed Sep 2026, not yet issued
2200 Mission StCorestates Construction Services Inclevel 2 ev chargers. installation of 11 tesla universal wall connectors. to be assigned to resident and / or staff ev drivers. in assigned stalls in a parking garage.
Details
Permit
202607245518

level 2 ev chargers. installation of 11 tesla universal wall connectors. to be assigned to resident and / or staff ev drivers. in assigned stalls in a parking garage.

Open the permit page

$84,308
Aug 13, 2026In progress
issued Aug 2026
1150 Lombard StCorestates Construction Services Incinstallation of 2 evc level 2 ev charges. 9 total evercharge ev002 ev chargers (evse) to be assigned to staff/residents in assigned parking areas.
Details
Permit
202607245559
Permit issued
Aug 28, 2026

installation of 2 evc level 2 ev charges. 9 total evercharge ev002 ev chargers (evse) to be assigned to staff/residents in assigned parking areas.

Open the permit page

$57,669
Jul 27, 2026In progress
issued Sep 2026
2190 BroadwayCorestates Construction Services Inclevel 2 ev chargers, the installation of 9 tesla wall mounted ev chargers, to be assigned to resident ev drivers in assigned parking areas.
Details
Permit
202607074620
Permit issued
Sep 10, 2026

level 2 ev chargers, the installation of 9 tesla wall mounted ev chargers, to be assigned to resident ev drivers in assigned parking areas.

Open the permit page

$68,312
Apr 23, 2026In progress
issued Sep 2026
3590 20th StCorestates Construction Services Inclevel 2 ev chargers, installation of nine (9) evercharge.ev002 ev chargers ("evse") to be assigned to staff / resident ev drivers in assigned parking areas.
Details
Permit
202604149404
Permit issued
Sep 4, 2026

level 2 ev chargers, installation of nine (9) evercharge.ev002 ev chargers ("evse") to be assigned to staff / resident ev drivers in assigned parking areas.

Open the permit page

$62,300
Apr 21, 2026In progress
issued Aug 2026
1880 Steiner StCorestates Construction Services Inclevel 2 ev chargers: installation of (5) tesla universal wall connectors ("evse") to be assigned to residents and/or staff. ev drivers in private parking areas of underground parking garage.
Details
Permit
202604028792
Permit issued
Aug 25, 2026

level 2 ev chargers: installation of (5) tesla universal wall connectors ("evse") to be assigned to residents and/or staff. ev drivers in private parking areas of underground parking garage.

Open the permit page

$45,521
Feb 26, 2026In progress
filed Feb 2026, not yet issued
1301 La PlayaCorestates Construction Services Incinstallation of level 2 evcs, 9 tesla universal wall connector 48a ev chargers ("evse") to be assigned to staff/ resident ev drivers in assigned parking areas.
Details
Permit
202601234460

installation of level 2 evcs, 9 tesla universal wall connector 48a ev chargers ("evse") to be assigned to staff/ resident ev drivers in assigned parking areas.

Open the permit page

$69,739
Feb 19, 2026In progress
issued Nov 2026
81 Lansing StCorestates Construction Services Incthe installation of nine (9) evercharge ev002 48a wifi enabled ev chargers in parking area.
Details
Permit
202602045239
Permit issued
Nov 2, 2026

the installation of nine (9) evercharge ev002 48a wifi enabled ev chargers in parking area.

Open the permit page

$87,067
Dec 31, 2025In progress
issued Jun 2026
241 Loomis StCorestates Construction Services Incadd modular unit and guard shack. revised 202511179793. revision to include 1) install 12 lota poles, install pre fabricated bldg, stairs, and ada lift; install guard shack and storage container.
Details
Permit
202512313115
Permit issued
Jun 3, 2026

add modular unit and guard shack. revised 202511179793. revision to include 1) install 12 lota poles, install pre fabricated bldg, stairs, and ada lift; install guard shack and storage container.

Open the permit page

$250,000
Nov 17, 2025In progress
issued Dec 2025
241 Loomis StCorestates Construction Services Increvision to pa #202310108308. revision to include: grading of surfaces assoc. areas with evse-new surfaces and striping associated with new evse. install 28 delta hpc 350 kw fast charging dispensers. install 5 lota pole devices. install 18 site light poles.install automatic swing gate.
Details
Permit
202511179793
Permit issued
Dec 11, 2025

revision to pa #202310108308. revision to include: grading of surfaces assoc. areas with evse-new surfaces and striping associated with new evse. install 28 delta hpc 350 kw fast charging dispensers. install 5 lota pole devices. install 18 site light poles.install automatic swing gate.

Open the permit page

Nov 17, 2025Completed
final sign-off Oct 2026
1750 Taylor StCorestates Construction Services Incinstallation of (5) zerova ax48 ev chargers (evse).
Details
Permit
202510086964
Permit issued
Jun 23, 2026
Final sign-off
Oct 2, 2026

installation of (5) zerova ax48 ev chargers (evse).

Open the permit page

$52,925
Dec 30, 2024Completed
final sign-off Jul 2025
1530 Galvez AvCorestates Construction Services Incev charger for 3 parking lots(001,007,031) install 3 delta 350 kw hp chargers and cabinets. install 3 charging equip skids and foundatoins. install evgo provided signage. install switchgear assemble and all underground conduit and conductors. perform all civil work required for chargers
Details
Permit
202409130751
Permit issued
Feb 14, 2025
Final sign-off
Jul 29, 2025

ev charger for 3 parking lots(001,007,031) install 3 delta 350 kw hp chargers and cabinets. install 3 charging equip skids and foundatoins. install evgo provided signage. install switchgear assemble and all underground conduit and conductors. perform all civil work required for chargers

Open the permit page

$40,000
Dec 30, 2024Completed
final sign-off Jul 2025
3911 03rd StCorestates Construction Services Incinstall 3 delta 350 kw hp chargers and cabinets. install 3 charging equip skids and foundatoins. install evgo provided signage. install switchgear assemble and all underground conduit and conductors. perform all civil work required for chargers. restripe parking stalls.
Details
Permit
202409110518
Permit issued
Feb 14, 2025
Final sign-off
Jul 29, 2025

install 3 delta 350 kw hp chargers and cabinets. install 3 charging equip skids and foundatoins. install evgo provided signage. install switchgear assemble and all underground conduit and conductors. perform all civil work required for chargers. restripe parking stalls.

Open the permit page

$40,000
Dec 30, 2024Completed
final sign-off Jul 2025
1501 Newhall StCorestates Construction Services Incev charger in 3 lots(001,007,031)install 3 delta 350 kw hp chargers and cabinets. install 3 charging equip skids and foundatoins. install evgo provided signage. install switchgear assemble and all underground conduit and conductors. perform all civil work required for chargers.
Details
Permit
202409130750
Permit issued
Feb 14, 2025
Final sign-off
Jul 29, 2025

ev charger in 3 lots(001,007,031)install 3 delta 350 kw hp chargers and cabinets. install 3 charging equip skids and foundatoins. install evgo provided signage. install switchgear assemble and all underground conduit and conductors. perform all civil work required for chargers.

Open the permit page

$40,000
Oct 10, 2023In progress
issued Mar 2024
241 Loomis StCorestates Construction Services Incchange from private parking lot to vehicle fleet changing. demo (e) surfaces for ev charger, grading surfaces & new surfaces & striping, install 30 delta hpc 200kw fast charging dispensers, 2 switchboard assembly, install 2 utility transformer, commmunication, and security systems.
Details
Permit
202310108308
Permit issued
Mar 5, 2024

change from private parking lot to vehicle fleet changing. demo (e) surfaces for ev charger, grading surfaces & new surfaces & striping, install 30 delta hpc 200kw fast charging dispensers, 2 switchboard assembly, install 2 utility transformer, commmunication, and security systems.

Open the permit page

$300,000
Mar 17, 2023Completed
final sign-off Sep 2025
1001 Harrison StCorestates Construction Services Incinstall ev chargers in (e) asphalt parking area on concrete pad out doors. change of use (e) automative wash to (n) electric vehicle charging location with 15 (n) ev charging stalls.
Details
Permit
202303173906
Permit issued
Sep 24, 2024
Final sign-off
Sep 25, 2025

install ev chargers in (e) asphalt parking area on concrete pad out doors. change of use (e) automative wash to (n) electric vehicle charging location with 15 (n) ev charging stalls.

Open the permit page

$300,000
Oct 5, 2022Completed
final sign-off Dec 2022
261 Loomis StCorestates Construction Services Incto obtain final inspection for work approved under pa#201811135761
Details
Permit
202210053816
Permit issued
Oct 5, 2022
Final sign-off
Dec 9, 2022

to obtain final inspection for work approved under pa#201811135761

Open the permit page

Oct 5, 2022Completed
final sign-off Dec 2023
241 Loomis StCorestates Construction Services Incto obtain final inspection for work approved under pa# 2018-0810-7048: all work is complete.
Details
Permit
202210053777
Permit issued
Oct 5, 2022
Final sign-off
Dec 5, 2023

to obtain final inspection for work approved under pa# 2018-0810-7048: all work is complete.

Open the permit page

May 25, 2022Completed
final sign-off Sep 2022
2860 16th StCorestates Construction Services Incto obtain final inspection for work approved under pa# 200606123766 & 200606123771. all work was complete. (structure burned down in 2016).
Details
Permit
202205254980
Permit issued
Aug 31, 2022
Final sign-off
Sep 9, 2022

to obtain final inspection for work approved under pa# 200606123766 & 200606123771. all work was complete. (structure burned down in 2016).

Open the permit page

Feb 16, 2022Completed
final sign-off Oct 2023
850 La PlayaCorestates Construction Services Incinstall 4 public use ev charging stations within an (e) parking lot; install(1) delta 350kw charger & cabinet, (2)delta 100kw city chargers, evgo provided signage, (1)utility transformer, switch gear assembly and all underground conduit and conductors, perform all civil work required for
Details
Permit
202202168135
Permit issued
Dec 14, 2022
Final sign-off
Oct 31, 2023

install 4 public use ev charging stations within an (e) parking lot; install(1) delta 350kw charger & cabinet, (2)delta 100kw city chargers, evgo provided signage, (1)utility transformer, switch gear assembly and all underground conduit and conductors, perform all civil work required for

Open the permit page

$300,000
Oct 12, 2016Never finaled
issued Oct 2016, no final
400 North Point StCorestates Construction Services Incinstallation of non-structural sign
Details
Permit
201610120042
Permit issued
Oct 12, 2016

installation of non-structural sign

Open the permit page

Jul 19, 2016Completed
final sign-off Oct 2016
400 North Point StCorestates Construction Services Increplacement of concrete landing approximately 60 sq ft of, installation of (1) new ncr 6634 self serice ada compliant atm machine
Details
Permit
201607192775
Permit issued
Jul 20, 2016
Final sign-off
Oct 13, 2016

replacement of concrete landing approximately 60 sq ft of, installation of (1) new ncr 6634 self serice ada compliant atm machine

Open the permit page

$15,000
Oct 29, 2013Completed
final sign-off Nov 2013
375 Newhall StCorestates Construction Services Inctwo concrete equipment pads. subsequent permit to show equipment, pa#201308144277
Details
Permit
201310290562
Permit issued
Oct 29, 2013
Final sign-off
Nov 25, 2013

two concrete equipment pads. subsequent permit to show equipment, pa#201308144277

Open the permit page

$500
Aug 14, 2013Completed
final sign-off Jan 2014
375 Newhall StCorestates Construction Services Incsite work to include parking pavement removal for energy server installation and accessory equipment intallation. placing underground utilities(water and gas) and interconnection with extg system.
Details
Permit
201308144277
Permit issued
Nov 12, 2013
Final sign-off
Jan 8, 2014

site work to include parking pavement removal for energy server installation and accessory equipment intallation. placing underground utilities(water and gas) and interconnection with extg system.

Open the permit page

$300,000