Brian D Baird
- Listed as
- authorized agent-others, contractor
- Firm
- Corestates Construction Services Inc
- Based in
- Duluth
- On San Francisco permits
- Aug 2013 to Sep 2026
25 permits since 2000 (contractor on 25 permits, authorized agent-others on 2 permits): 12 completed, 12 in progress, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 28, 2026 | In progress filed Sep 2026, not yet issued | 1880 Steiner St | Corestates Construction Services Inc | level 2 ev chargers, installation of two (2) tesla universal wall connector (¿evse¿) to be assigned to residents and/or staff ev drivers in private parking areas of underground parking garage. addendum to permit 202604028792Details
level 2 ev chargers, installation of two (2) tesla universal wall connector (¿evse¿) to be assigned to residents and/or staff ev drivers in private parking areas of underground parking garage. addendum to permit 202604028792 | $45,521 |
| Sep 10, 2026 | In progress filed Sep 2026, not yet issued | 1483 Mason St | Corestates Construction Services Inc | installatoin of 4 artemis plugzio 48a level 2 ev chargers. evse to be shared by resident and staff ev drivers in ground level covered garage.Details
installatoin of 4 artemis plugzio 48a level 2 ev chargers. evse to be shared by resident and staff ev drivers in ground level covered garage. | $48,408 |
| Sep 2, 2026 | In progress filed Sep 2026, not yet issued | 2200 Mission St | Corestates Construction Services Inc | level 2 ev chargers. installation of 11 tesla universal wall connectors. to be assigned to resident and / or staff ev drivers. in assigned stalls in a parking garage.Details
level 2 ev chargers. installation of 11 tesla universal wall connectors. to be assigned to resident and / or staff ev drivers. in assigned stalls in a parking garage. | $84,308 |
| Aug 13, 2026 | In progress issued Aug 2026 | 1150 Lombard St | Corestates Construction Services Inc | installation of 2 evc level 2 ev charges. 9 total evercharge ev002 ev chargers (evse) to be assigned to staff/residents in assigned parking areas.Details
installation of 2 evc level 2 ev charges. 9 total evercharge ev002 ev chargers (evse) to be assigned to staff/residents in assigned parking areas. | $57,669 |
| Jul 27, 2026 | In progress issued Sep 2026 | 2190 Broadway | Corestates Construction Services Inc | level 2 ev chargers, the installation of 9 tesla wall mounted ev chargers, to be assigned to resident ev drivers in assigned parking areas.Details
level 2 ev chargers, the installation of 9 tesla wall mounted ev chargers, to be assigned to resident ev drivers in assigned parking areas. | $68,312 |
| Apr 23, 2026 | In progress issued Sep 2026 | 3590 20th St | Corestates Construction Services Inc | level 2 ev chargers, installation of nine (9) evercharge.ev002 ev chargers ("evse") to be assigned to staff / resident ev drivers in assigned parking areas.Details
level 2 ev chargers, installation of nine (9) evercharge.ev002 ev chargers ("evse") to be assigned to staff / resident ev drivers in assigned parking areas. | $62,300 |
| Apr 21, 2026 | In progress issued Aug 2026 | 1880 Steiner St | Corestates Construction Services Inc | level 2 ev chargers: installation of (5) tesla universal wall connectors ("evse") to be assigned to residents and/or staff. ev drivers in private parking areas of underground parking garage.Details
level 2 ev chargers: installation of (5) tesla universal wall connectors ("evse") to be assigned to residents and/or staff. ev drivers in private parking areas of underground parking garage. | $45,521 |
| Feb 26, 2026 | In progress filed Feb 2026, not yet issued | 1301 La Playa | Corestates Construction Services Inc | installation of level 2 evcs, 9 tesla universal wall connector 48a ev chargers ("evse") to be assigned to staff/ resident ev drivers in assigned parking areas.Details
installation of level 2 evcs, 9 tesla universal wall connector 48a ev chargers ("evse") to be assigned to staff/ resident ev drivers in assigned parking areas. | $69,739 |
| Feb 19, 2026 | In progress filed Feb 2026, not yet issued | 81 Lansing St | Corestates Construction Services Inc | the installation of nine (9) evercharge ev002 48a wifi enabled ev chargers in parking area.Details
the installation of nine (9) evercharge ev002 48a wifi enabled ev chargers in parking area. | $87,067 |
| Dec 31, 2025 | In progress issued Jun 2026 | 241 Loomis St | Corestates Construction Services Inc | add modular unit and guard shack. revised 202511179793. revision to include 1) install 12 lota poles, install pre fabricated bldg, stairs, and ada lift; install guard shack and storage container.Details
add modular unit and guard shack. revised 202511179793. revision to include 1) install 12 lota poles, install pre fabricated bldg, stairs, and ada lift; install guard shack and storage container. | $250,000 |
| Nov 17, 2025 | In progress issued Dec 2025 | 241 Loomis St | Corestates Construction Services Inc | revision to pa #202310108308. revision to include: grading of surfaces assoc. areas with evse-new surfaces and striping associated with new evse. install 28 delta hpc 350 kw fast charging dispensers. install 5 lota pole devices. install 18 site light poles.install automatic swing gate.Details
revision to pa #202310108308. revision to include: grading of surfaces assoc. areas with evse-new surfaces and striping associated with new evse. install 28 delta hpc 350 kw fast charging dispensers. install 5 lota pole devices. install 18 site light poles.install automatic swing gate. | |
| Nov 17, 2025 | Completed final sign-off Oct 2026 | 1750 Taylor St | Corestates Construction Services Inc | installation of (5) zerova ax48 ev chargers (evse).Details
installation of (5) zerova ax48 ev chargers (evse). | $52,925 |
| Dec 30, 2024 | Completed final sign-off Jul 2025 | 1530 Galvez Av | Corestates Construction Services Inc | ev charger for 3 parking lots(001,007,031) install 3 delta 350 kw hp chargers and cabinets. install 3 charging equip skids and foundatoins. install evgo provided signage. install switchgear assemble and all underground conduit and conductors. perform all civil work required for chargersDetails
ev charger for 3 parking lots(001,007,031) install 3 delta 350 kw hp chargers and cabinets. install 3 charging equip skids and foundatoins. install evgo provided signage. install switchgear assemble and all underground conduit and conductors. perform all civil work required for chargers | $40,000 |
| Dec 30, 2024 | Completed final sign-off Jul 2025 | 3911 03rd St | Corestates Construction Services Inc | install 3 delta 350 kw hp chargers and cabinets. install 3 charging equip skids and foundatoins. install evgo provided signage. install switchgear assemble and all underground conduit and conductors. perform all civil work required for chargers. restripe parking stalls.Details
install 3 delta 350 kw hp chargers and cabinets. install 3 charging equip skids and foundatoins. install evgo provided signage. install switchgear assemble and all underground conduit and conductors. perform all civil work required for chargers. restripe parking stalls. | $40,000 |
| Dec 30, 2024 | Completed final sign-off Jul 2025 | 1501 Newhall St | Corestates Construction Services Inc | ev charger in 3 lots(001,007,031)install 3 delta 350 kw hp chargers and cabinets. install 3 charging equip skids and foundatoins. install evgo provided signage. install switchgear assemble and all underground conduit and conductors. perform all civil work required for chargers.Details
ev charger in 3 lots(001,007,031)install 3 delta 350 kw hp chargers and cabinets. install 3 charging equip skids and foundatoins. install evgo provided signage. install switchgear assemble and all underground conduit and conductors. perform all civil work required for chargers. | $40,000 |
| Oct 10, 2023 | In progress issued Mar 2024 | 241 Loomis St | Corestates Construction Services Inc | change from private parking lot to vehicle fleet changing. demo (e) surfaces for ev charger, grading surfaces & new surfaces & striping, install 30 delta hpc 200kw fast charging dispensers, 2 switchboard assembly, install 2 utility transformer, commmunication, and security systems.Details
change from private parking lot to vehicle fleet changing. demo (e) surfaces for ev charger, grading surfaces & new surfaces & striping, install 30 delta hpc 200kw fast charging dispensers, 2 switchboard assembly, install 2 utility transformer, commmunication, and security systems. | $300,000 |
| Mar 17, 2023 | Completed final sign-off Sep 2025 | 1001 Harrison St | Corestates Construction Services Inc | install ev chargers in (e) asphalt parking area on concrete pad out doors. change of use (e) automative wash to (n) electric vehicle charging location with 15 (n) ev charging stalls.Details
install ev chargers in (e) asphalt parking area on concrete pad out doors. change of use (e) automative wash to (n) electric vehicle charging location with 15 (n) ev charging stalls. | $300,000 |
| Oct 5, 2022 | Completed final sign-off Dec 2022 | 261 Loomis St | Corestates Construction Services Inc | to obtain final inspection for work approved under pa#201811135761Details
to obtain final inspection for work approved under pa#201811135761 | |
| Oct 5, 2022 | Completed final sign-off Dec 2023 | 241 Loomis St | Corestates Construction Services Inc | to obtain final inspection for work approved under pa# 2018-0810-7048: all work is complete.Details
to obtain final inspection for work approved under pa# 2018-0810-7048: all work is complete. | |
| May 25, 2022 | Completed final sign-off Sep 2022 | 2860 16th St | Corestates Construction Services Inc | to obtain final inspection for work approved under pa# 200606123766 & 200606123771. all work was complete. (structure burned down in 2016).Details
to obtain final inspection for work approved under pa# 200606123766 & 200606123771. all work was complete. (structure burned down in 2016). | |
| Feb 16, 2022 | Completed final sign-off Oct 2023 | 850 La Playa | Corestates Construction Services Inc | install 4 public use ev charging stations within an (e) parking lot; install(1) delta 350kw charger & cabinet, (2)delta 100kw city chargers, evgo provided signage, (1)utility transformer, switch gear assembly and all underground conduit and conductors, perform all civil work required forDetails
install 4 public use ev charging stations within an (e) parking lot; install(1) delta 350kw charger & cabinet, (2)delta 100kw city chargers, evgo provided signage, (1)utility transformer, switch gear assembly and all underground conduit and conductors, perform all civil work required for | $300,000 |
| Oct 12, 2016 | Never finaled issued Oct 2016, no final | 400 North Point St | Corestates Construction Services Inc | installation of non-structural signDetails
installation of non-structural sign | |
| Jul 19, 2016 | Completed final sign-off Oct 2016 | 400 North Point St | Corestates Construction Services Inc | replacement of concrete landing approximately 60 sq ft of, installation of (1) new ncr 6634 self serice ada compliant atm machineDetails
replacement of concrete landing approximately 60 sq ft of, installation of (1) new ncr 6634 self serice ada compliant atm machine | $15,000 |
| Oct 29, 2013 | Completed final sign-off Nov 2013 | 375 Newhall St | Corestates Construction Services Inc | two concrete equipment pads. subsequent permit to show equipment, pa#201308144277Details
two concrete equipment pads. subsequent permit to show equipment, pa#201308144277 | $500 |
| Aug 14, 2013 | Completed final sign-off Jan 2014 | 375 Newhall St | Corestates Construction Services Inc | site work to include parking pavement removal for energy server installation and accessory equipment intallation. placing underground utilities(water and gas) and interconnection with extg system.Details
site work to include parking pavement removal for energy server installation and accessory equipment intallation. placing underground utilities(water and gas) and interconnection with extg system. | $300,000 |