Liran Biton
- Listed as
- authorized agent-others, contractor, designer
- Firm
- Lb Construction & Remodeling
- Based in
- San Leandro
- On San Francisco permits
- Jul 2019 to Aug 2025
24 permits since 2000 (contractor on 24 permits, authorized agent-others on 3 permits, designer on 1 permit): 18 completed, 5 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 1, 2025 | Completed final sign-off Jun 2026 | 1219 Fitzgerald Av | Lb Construction & Remodeling | revision to pa#2023-0605-9257; on site footing detail revisionDetails
revision to pa#2023-0605-9257; on site footing detail revision | $5,000 |
| Jun 9, 2025 | Completed final sign-off Aug 2025 | 234 Richland Av | Lb Construction & Remodeling | bathroom remodel, like for like, no relocation involved. replace vanity, toilet, (e) fan, (e) shower pan and shower. hand replace floor of bath area. run dedicated circuits per code. no layout change.Details
bathroom remodel, like for like, no relocation involved. replace vanity, toilet, (e) fan, (e) shower pan and shower. hand replace floor of bath area. run dedicated circuits per code. no layout change. | $20,000 |
| Sep 9, 2024 | Completed final sign-off Nov 2024 | 3699 Market St | Lb Construction & Remodeling | like for like 2 windows replacement at the second floor on the right side of the house. windows located at the master bedroom. windows (36x56 wood window) not visible from the street. uf<=0.3Details
like for like 2 windows replacement at the second floor on the right side of the house. windows located at the master bedroom. windows (36x56 wood window) not visible from the street. uf<=0.3 | $15,000 |
| May 9, 2024 | Completed final sign-off Jan 2025 | 2635 Buchanan St | Lb Construction & Remodeling | kitchen remodel like for like no relocation included. replace kitchen cabinet *install 6 new recess light. replace countertop in kitchen area. run dedicated circuts per code in kitchen area. install new appliances.Details
kitchen remodel like for like no relocation included. replace kitchen cabinet *install 6 new recess light. replace countertop in kitchen area. run dedicated circuts per code in kitchen area. install new appliances. | $30,000 |
| May 9, 2024 | Completed final sign-off Jan 2025 | 2635 Buchanan St | Lb Construction & Remodeling | (e) basement level family room to be converted to partial family room, additional bedroom, & adding den area closet to (e) basement level. upper level the windows getting changed, front windows will be wood, 2 side facing & 1 front side.Details
(e) basement level family room to be converted to partial family room, additional bedroom, & adding den area closet to (e) basement level. upper level the windows getting changed, front windows will be wood, 2 side facing & 1 front side. | $45,000 |
| Oct 20, 2023 | Completed final sign-off Oct 2023 | 414 27th St | Lb Construction & Remodeling | window replacement like for like no changes involved 3 windows in total. 2 in living room, 1 in bathroom (non facing frontage)Details
window replacement like for like no changes involved 3 windows in total. 2 in living room, 1 in bathroom (non facing frontage) | $20,000 |
| Sep 12, 2023 | Completed final sign-off Apr 2024 | 154 Seneca Av | Lb Construction & Remodeling | replace (5) windows like for like on second floor with new vinyl windows same sizes. patch stucco as needed. window in front will be replaced with wood. window same size.Details
replace (5) windows like for like on second floor with new vinyl windows same sizes. patch stucco as needed. window in front will be replaced with wood. window same size. | $15,000 |
| Jun 5, 2023 | Completed final sign-off Jun 2026 | 1219 Fitzgerald Av | Lb Construction & Remodeling | convert lower floor to jadu. 2nd fl kitchen & bathroom remodel. fire damage repair and roof retrofit. units will be added per govt code section 65852.22( and/or section 65852.2 for hybrid adu)Details
convert lower floor to jadu. 2nd fl kitchen & bathroom remodel. fire damage repair and roof retrofit. units will be added per govt code section 65852.22( and/or section 65852.2 for hybrid adu) | $350,000 |
| May 5, 2023 | Expired or cancelled withdrawn Oct 2023 | 414 27th St | Lb Construction & Remodeling | demolition of interior fire place. demolition of two 2'6" x 5'10" windows. installation of one new 8' x 4' 10" new window. replacement of a 2' x 5'10" window.Details
demolition of interior fire place. demolition of two 2'6" x 5'10" windows. installation of one new 8' x 4' 10" new window. replacement of a 2' x 5'10" window. | $25,000 |
| Nov 14, 2022 | Never finaled issued Nov 2022, no final | 111 Middlefield Dr | Lb Construction & Remodeling | remove (e) walls between kitchen & dining room & family roomDetails
remove (e) walls between kitchen & dining room & family room | $20,000 |
| Oct 28, 2022 | Completed final sign-off Jan 2023 | 2040 Sutter St | Lb Construction & Remodeling | bathroom remodeling like for like no relocation involved. replace toilet, replace vanity, replace shower pan, replace existing fan, run dedicated circuits per code.Details
bathroom remodeling like for like no relocation involved. replace toilet, replace vanity, replace shower pan, replace existing fan, run dedicated circuits per code. | $20,000 |
| Sep 14, 2022 | Never finaled issued Sep 2022, no final | 1495 31st Av | Lb Construction & Remodeling, Prosper Construction Dev Inc. | one kitchen remodeling like for like, no relocation involved. replace kitchen cabinets, replace appliances, run dedicated circuits per code, install recess lights in kitchen area.Details
one kitchen remodeling like for like, no relocation involved. replace kitchen cabinets, replace appliances, run dedicated circuits per code, install recess lights in kitchen area. | $25,000 |
| May 13, 2022 | Completed final sign-off Oct 2025 | 315 Santa Ana Av | Lb Construction & Remodeling | new concrete stairs to basement. new door on south side of buildingDetails
new concrete stairs to basement. new door on south side of building | $5,000 |
| May 6, 2022 | Completed final sign-off Jun 2023 | 2130 Harrison St | Lb Construction & Remodeling | 1st fl restroom renovation; (n) lighting, shower addition, relocate wash/dry, in-kind kitchen, renovation of cabinets, lighting fixtures, appliances, upgrade lighting throughout, paint & new lvt flooring.Details
1st fl restroom renovation; (n) lighting, shower addition, relocate wash/dry, in-kind kitchen, renovation of cabinets, lighting fixtures, appliances, upgrade lighting throughout, paint & new lvt flooring. | $85,000 |
| Apr 20, 2022 | Completed final sign-off Oct 2023 | 1939 Fulton St | Lb Construction & Remodeling | kitchen remodel like for like. add 70 amp subpanel. bathroom remodel. adding toilet & sink in half bath.Details
kitchen remodel like for like. add 70 amp subpanel. bathroom remodel. adding toilet & sink in half bath. | $50,000 |
| Apr 28, 2021 | Completed final sign-off Aug 2021 | 221 Clara St | Lb Construction & Remodeling | bathroom remodeling like to like, remove replace toliet, replace shower pan , replace double sink vanity, bathroom remodel in kind comply w/150.0(k)5Details
bathroom remodeling like to like, remove replace toliet, replace shower pan , replace double sink vanity, bathroom remodel in kind comply w/150.0(k)5 | $15,000 |
| Mar 5, 2021 | Completed final sign-off Aug 2021 | 2931 20th St | Lb Construction & Remodeling | bathroom remodeling like for like, no relocaiton. master: tub & shower replace toilet replace sink, replace existing fan replace 3 recess light. guest tub, replace toilet, replace sink, replace fan.Details
bathroom remodeling like for like, no relocaiton. master: tub & shower replace toilet replace sink, replace existing fan replace 3 recess light. guest tub, replace toilet, replace sink, replace fan. | $30,000 |
| Jan 4, 2021 | Completed final sign-off Jun 2021 | 221 Clara St | Lb Construction & Remodeling | #4: bathroom remodel like to like. no any relocation. replace toilet, vanity, tile on floor & wall, fan, lights, shower pan, shower head & gfi.Details
#4: bathroom remodel like to like. no any relocation. replace toilet, vanity, tile on floor & wall, fan, lights, shower pan, shower head & gfi. | $21,000 |
| Oct 7, 2020 | Never finaled issued Dec 2020, no final | 68 Rosemont Pl | Greenstar Builders Inc, Lb Construction & Remodeling | remodel master bathroom and add guest bathroom at 3rd fl, replace 1 rear window if needed.Details
remodel master bathroom and add guest bathroom at 3rd fl, replace 1 rear window if needed. | $30,000 |
| Aug 25, 2020 | Never finaled issued Aug 2020, no final | 1754 Larkin St | Lb Construction & Remodeling | unit 3: remove tub, install washer/dryer instead, run 240 amp & 110 for washer, upgrde drainage as neededDetails
unit 3: remove tub, install washer/dryer instead, run 240 amp & 110 for washer, upgrde drainage as needed | $8,000 |
| Jul 22, 2020 | Completed final sign-off Jun 2021 | 341 Kirkham St | Lb Construction & Remodeling | bath room remodel with reloaded new bearing wall, replace vanity and replace toilet, replace tub, replace (e) fan, remove non bearing wall and build new wall with 2x4 studs 16" on center install 4x6 header above doorDetails
bath room remodel with reloaded new bearing wall, replace vanity and replace toilet, replace tub, replace (e) fan, remove non bearing wall and build new wall with 2x4 studs 16" on center install 4x6 header above door | $25,000 |
| Feb 6, 2020 | Completed final sign-off Sep 2020 | 3329 Scott St | Lb Construction & Remodeling, L T Construction | remove e laundry area and add a full bath at 2nd fl bedroom. maher not reqDetails
remove e laundry area and add a full bath at 2nd fl bedroom. maher not req | $30,000 |
| Nov 15, 2019 | Never finaled issued Nov 2019, no final | 1734 Lombard St | Lb Construction & Remodeling | unit 6: kitchen remodel. replace cabinets & counterop in same exact location. replace in kind. no structural work. comply w/cec150.0(k)3.Details
unit 6: kitchen remodel. replace cabinets & counterop in same exact location. replace in kind. no structural work. comply w/cec150.0(k)3. | $20,000 |
| Jul 29, 2019 | Completed final sign-off Dec 2019 | 1400 Mission St | Lb Construction & Remodeling | unit 810: partial bath remodel, replace tub, mixer valve, tiles on walls/floor, replace vanity. no electrical work to be done. no walls removed.Details
unit 810: partial bath remodel, replace tub, mixer valve, tiles on walls/floor, replace vanity. no electrical work to be done. no walls removed. | $7,000 |