Permit GraphShortlistSan Francisco building permits since 2000

Igor Taratakovsky

License
22463
Board not determined from the city's record: no role or letter places this number
About the state's license search
Search the state's license records (not the contractors board)
Listed as
architect, engineer
On San Francisco permits
Dec 2005 to Aug 2021

4 permits since 2000 (engineer on 3 permits, architect on 1 permit): 2 completed, 2 never finaled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Centric Construction Inc, Edri Construction Inc *See Notes*, Swinerton Builders

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Aug 12, 2021Completed
final sign-off Mar 2023
8 10th StEdri Construction Inc *See Notes*to comply with nov202179519 dated 7/12/2021: legalize air conditioning units for 31 units. electrical under sep permit.
Details
Permit
202108126343
Permit issued
Sep 9, 2021
Final sign-off
Mar 2, 2023

to comply with nov202179519 dated 7/12/2021: legalize air conditioning units for 31 units. electrical under sep permit.

Open the permit page

$300,000
Jul 23, 2021Never finaled
issued Aug 2021, no final
361 Turk StCentric Construction Increvision to pa#202106011408: protion of bldg storm water is directed to flow-thru bio-retention planter that is located below the sewer lvl. storm sump is located on the basement lvl to collect&lift the storm water to gravity flow storm drain. 3way failsafe valves are utilized to re-direct stormwate
Details
Permit
202107234956
Permit issued
Aug 12, 2021

revision to pa#202106011408: protion of bldg storm water is directed to flow-thru bio-retention planter that is located below the sewer lvl. storm sump is located on the basement lvl to collect&lift the storm water to gravity flow storm drain. 3way failsafe valves are utilized to re-direct stormwate

Open the permit page

Nov 20, 2012Completed
final sign-off Mar 2015
1411 Market StSwinerton Buildersrevision to approved pa#200903234623/s3/r3. provide welded construction grease duct riser and dishwahser exhaust riser from level 2 to the level 15 roof. terminate and cap for future tenant connection at level 2 and at level 15. provide grease clean out access doors at each floor level.
Details
Permit
201211204601
Permit issued
Dec 7, 2012
Final sign-off
Mar 11, 2015

revision to approved pa#200903234623/s3/r3. provide welded construction grease duct riser and dishwahser exhaust riser from level 2 to the level 15 roof. terminate and cap for future tenant connection at level 2 and at level 15. provide grease clean out access doors at each floor level.

Open the permit page

$8,000
Dec 15, 2005Never finaled
issued Dec 2005, no final
449 10th Stalteration to opening door no exterior work
Details
Permit
200512150460
Permit issued
Dec 15, 2005

alteration to opening door no exterior work

Open the permit page

$3,000