Kersey Clausen
- Listed as
- engineer
- Firm
- W.B. Clausen S.E.
- Based in
- Emeryville
- On San Francisco permits
- Apr 2005 to May 2023
36 permits since 2000 (engineer on 36 permits): 27 completed, 3 never finaled, 6 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 11, 2023 | Completed final sign-off Dec 2023 | 1980 Oakdale Av | barrier removal: ada upgrade including demising partition @ mezzanine, ada restroom, addition of lift, ada restroom, ada restriping inside parking lot not public right away; accessory open office in reduced mezzanine approximately 3,000 sfDetails
barrier removal: ada upgrade including demising partition @ mezzanine, ada restroom, addition of lift, ada restroom, ada restriping inside parking lot not public right away; accessory open office in reduced mezzanine approximately 3,000 sf | $65,000 | |
| Mar 25, 2022 | Completed final sign-off Apr 2023 | 54 Landers St | remove (e) wood stairs from deck, spiral stair to remain. infill demolished stair opening w/new deck construction inreasing deck from 101 sq.ft. to 137 sq.ft., provide new deck guardrail around perimeter of deck & new decking. (e) foundation to be reused.Details
remove (e) wood stairs from deck, spiral stair to remain. infill demolished stair opening w/new deck construction inreasing deck from 101 sq.ft. to 137 sq.ft., provide new deck guardrail around perimeter of deck & new decking. (e) foundation to be reused. | $2,000 | |
| Sep 9, 2021 | Completed final sign-off Feb 2022 | 1734 Gough St | Mueller Nicholls Inc | revision to pa 202106041696 revisions to office layout, revision to mep, revisions to structural (voluntary) work.Details
revision to pa 202106041696 revisions to office layout, revision to mep, revisions to structural (voluntary) work. | |
| Jan 29, 2021 | Never finaled issued Apr 2021, no final | 3914 Cesar Chavez St | Hawke Construction | interior remodel of upper unit only including kitchen & bath. create 2nd bathroom & associated m.e.p. work. new windows at rear, no change to footprint.Details
interior remodel of upper unit only including kitchen & bath. create 2nd bathroom & associated m.e.p. work. new windows at rear, no change to footprint. | $110,000 |
| Oct 22, 2020 | Completed final sign-off Jan 2023 | 27 Christopher Dr | Chl Construction Company | interior renovation w/ (n) legal stair, (n) bathroom. replace (e) bathrooms, kitchen & finishes. partition reconfiguration. replace portion of hipped roof w/ continuation of (e) ridge beam & (n) gable end at rear. remove decorative railing & posts at front. replace railing & tile on (e) porch.Details
interior renovation w/ (n) legal stair, (n) bathroom. replace (e) bathrooms, kitchen & finishes. partition reconfiguration. replace portion of hipped roof w/ continuation of (e) ridge beam & (n) gable end at rear. remove decorative railing & posts at front. replace railing & tile on (e) porch. | $100,000 |
| Dec 19, 2019 | Completed final sign-off Jan 2023 | 273 Page St | Barcewski Inc Dba Sunshine Construction, Division Sf Inc Dba: Hawke Bldg Company | renovation of 1st & 2nd floor fountain repair / replacement. new ground floor unit. add one studio unit.Details
renovation of 1st & 2nd floor fountain repair / replacement. new ground floor unit. add one studio unit. | $200,000 |
| Sep 3, 2019 | Completed final sign-off Jan 2022 | 635 Scott St | De Brus Construction Inc | rev. to pa#201703070906. replace floor joists and plywood in kind current timber has rotted.Details
rev. to pa#201703070906. replace floor joists and plywood in kind current timber has rotted. | $50,000 |
| Jul 3, 2019 | Completed final sign-off Nov 2019 | 3021 26th Av | Christopher Gate Construction Inc | rev to pa201812279206. add deck replacement.Details
rev to pa201812279206. add deck replacement. | $12,000 |
| Oct 26, 2018 | Completed final sign-off Aug 2019 | 758 Clayton St | Simmons Stairways Inc | interior: replace (e) interior stairs and install new glass stair system from 2/f to 3/f.Details
interior: replace (e) interior stairs and install new glass stair system from 2/f to 3/f. | $4,000 |
| Mar 8, 2017 | Completed final sign-off Sep 2022 | 635 Scott St | De Brus Construction Inc | conversion of back of garage to 2 accessory dwelling unit w/ patio & garden, reference soft story application #201703070906 adding units per ordinance no. 162-16Details
conversion of back of garage to 2 accessory dwelling unit w/ patio & garden, reference soft story application #201703070906 adding units per ordinance no. 162-16 | $250,000 |
| Mar 7, 2017 | Completed final sign-off Jan 2022 | 635 Scott St | De Brus Construction Inc | soft story retrofit per sfebc chapter 4d, fema p-807. n/a ordinance #155-13Details
soft story retrofit per sfebc chapter 4d, fema p-807. n/a ordinance #155-13 | $100,000 |
| Nov 23, 2016 | Expired or cancelled withdrawn May 2017 | 3737 Jackson St | horizontal addition. add 1,261 sf on 3rd levels to expand ext.structure. rear addition only. n/a for maher ordinance no155-13.Details
horizontal addition. add 1,261 sf on 3rd levels to expand ext.structure. rear addition only. n/a for maher ordinance no155-13. | $296,000 | |
| May 25, 2016 | Completed final sign-off Aug 2018 | 1400 Mcallister St | Graham Moore Construction Inc | revision to pa #201601076585 soft story ordinance 66-13 : move moment frames locations (2).Details
revision to pa #201601076585 soft story ordinance 66-13 : move moment frames locations (2). | |
| Jan 7, 2016 | Completed final sign-off Aug 2018 | 1400 Mcallister St | Graham Moore Construction Inc | structural strengtheing to mitigate soft story and strengthening 1st level wall to bring building into compliance with sf ordinance 66-13. ref wb clasen drawing project 25579 dated 9/14/15Details
structural strengtheing to mitigate soft story and strengthening 1st level wall to bring building into compliance with sf ordinance 66-13. ref wb clasen drawing project 25579 dated 9/14/15 | $80,000 |
| Jul 30, 2015 | Never finaled issued Aug 2015, no final | 1355 Market St | Terra Nova Industries | revision to app#201312194586. reduce mezzanine by 320 sq ft adjust layout of mezz. and kitchen, add brewery equipment. remove employee restroom. add fire resisitant paint detail. added kitchen and hood drawings. n/a for the maherDetails
revision to app#201312194586. reduce mezzanine by 320 sq ft adjust layout of mezz. and kitchen, add brewery equipment. remove employee restroom. add fire resisitant paint detail. added kitchen and hood drawings. n/a for the maher | |
| Feb 9, 2015 | Completed final sign-off Aug 2016 | 550 Florida St | t.i. of approx 5090 sq. ft. to include: bread baking facility, commissary kitchen & full service restaurant. (all ada work (bathrooms, path of travel to space under ref pa# 2011/09/20/5060) separate plumbing, electrical & sprinkler permits. building is fully sprinklered. ** maher: yes **Details
t.i. of approx 5090 sq. ft. to include: bread baking facility, commissary kitchen & full service restaurant. (all ada work (bathrooms, path of travel to space under ref pa# 2011/09/20/5060) separate plumbing, electrical & sprinkler permits. building is fully sprinklered. ** maher: yes ** | $800,000 | |
| Mar 5, 2014 | Completed final sign-off Apr 2016 | 823 Alvarado St | Mulhall Construction Inc. | remodel of existing kitchen & family rm. addition of bay window off of family rm. rebuild deck and exterior stair at back of house. expand basement level art studio under family rm. adding approx 325 sf useable.Details
remodel of existing kitchen & family rm. addition of bay window off of family rm. rebuild deck and exterior stair at back of house. expand basement level art studio under family rm. adding approx 325 sf useable. | $125,000 |
| Apr 2, 2013 | Completed final sign-off Jan 2014 | 550 Florida St | space d -remove concrete flr slab & excavate down approx 5", pour (n) slab, reconfigure mezz framing, move corridor wall 2ft so. provide (n) foundation, 5'x8' cut thru concrete wall per walk-thru, (n) wood framed stair to access second level mezz. repl (e) front window, new entries, stairs, ramps,Details
space d -remove concrete flr slab & excavate down approx 5", pour (n) slab, reconfigure mezz framing, move corridor wall 2ft so. provide (n) foundation, 5'x8' cut thru concrete wall per walk-thru, (n) wood framed stair to access second level mezz. repl (e) front window, new entries, stairs, ramps, | $30,000 | |
| Dec 13, 2012 | Completed final sign-off Dec 2013 | 1493 Mcallister St | remodel kitchen, new appliances, lighting, finishes, demo wall.Details
remodel kitchen, new appliances, lighting, finishes, demo wall. | $20,000 | |
| Jul 24, 2012 | Completed final sign-off Jul 2013 | 22 Terra Vista Av | Kelly Construction | unit #1g - to comply with ab-094. structural strengthening to mitigate soft story of bldg. new steel moment frames at east face of bldg with new concrete foundations. provide stucco over steel to match bldg. 2 new monment frame along north face of building with concrete foundations.Details
unit #1g - to comply with ab-094. structural strengthening to mitigate soft story of bldg. new steel moment frames at east face of bldg with new concrete foundations. provide stucco over steel to match bldg. 2 new monment frame along north face of building with concrete foundations. | $30,000 |
| Jul 24, 2012 | Completed final sign-off Jul 2013 | 22 Terra Vista Av | Kelly Construction | unit #1a - to comply with ab-094. structural strengthening to mitigate soft story of bldg. install 2 steel moment frames at front of bldg with new concrete foundations & stucco over to match in-kind. crawlspace retrofit w/ new plywood and anchorbolts.Details
unit #1a - to comply with ab-094. structural strengthening to mitigate soft story of bldg. install 2 steel moment frames at front of bldg with new concrete foundations & stucco over to match in-kind. crawlspace retrofit w/ new plywood and anchorbolts. | $30,000 |
| Jul 24, 2012 | Completed final sign-off Jul 2013 | 22 Terra Vista Av | Kelly Construction | unit #2d - to comply with ab-094. structural strengthening to mitigate soft story of bldg. install 2 steel moment frames at front of bldg with new concrete foundations. provide stucco over steel to match bldg. crawlspace retrofit w/ new plywood and anchorbolts.Details
unit #2d - to comply with ab-094. structural strengthening to mitigate soft story of bldg. install 2 steel moment frames at front of bldg with new concrete foundations. provide stucco over steel to match bldg. crawlspace retrofit w/ new plywood and anchorbolts. | $30,000 |
| Jul 24, 2012 | Completed final sign-off Jul 2013 | 22 Terra Vista Av | Kelly Construction | unit #1c - to comply with ab-094. structural strengthening to mitigate soft story of bldg. crawlspace retrofit w/ new plywood and anchorbolts.Details
unit #1c - to comply with ab-094. structural strengthening to mitigate soft story of bldg. crawlspace retrofit w/ new plywood and anchorbolts. | $30,000 |
| Jul 24, 2012 | Completed final sign-off Jul 2013 | 22 Terra Vista Av | Kelly Construction | unit #1f - to comply with ab-094. structural strengthening to mitigate soft story of bldg. new steel moment frames at front of bldg with new concrete foundations.Details
unit #1f - to comply with ab-094. structural strengthening to mitigate soft story of bldg. new steel moment frames at front of bldg with new concrete foundations. | $30,000 |
| Jul 24, 2012 | Completed final sign-off Jul 2013 | 22 Terra Vista Av | Kelly Construction | unit #1e - to comply with ab-094. structural strengthening to mitigate soft story of bldg. install 2 steel moment frames at front of bldg with new concrete foundations. provide stucco over steel to match (e) building & wood sheetng.Details
unit #1e - to comply with ab-094. structural strengthening to mitigate soft story of bldg. install 2 steel moment frames at front of bldg with new concrete foundations. provide stucco over steel to match (e) building & wood sheetng. | $30,000 |
| Jul 24, 2012 | Completed final sign-off Jul 2013 | 22 Terra Vista Av | Kelly Construction | unit #1b - to comply with ab-094. structural strengthening to mitigate soft story of bldg. install 2 steel moment frames at front of bldg with new concrete foundations. crawlspace retrofit w/ new plywood and anchorbolts.Details
unit #1b - to comply with ab-094. structural strengthening to mitigate soft story of bldg. install 2 steel moment frames at front of bldg with new concrete foundations. crawlspace retrofit w/ new plywood and anchorbolts. | $30,000 |
| Apr 30, 2012 | Expired or cancelled expired Apr 2017 | 550 Florida St | double faced nonelectric blade signDetails
double faced nonelectric blade sign | $2,000 | |
| Apr 30, 2012 | Expired or cancelled expired Apr 2017 | 550 Florida St | double faced electric blade signDetails
double faced electric blade sign | $20,000 | |
| Apr 30, 2012 | Expired or cancelled expired Apr 2017 | 550 Florida St | corrugated metal awning structure above entry. size approx 8'x18'. structural drawings included. 7 canvas awnings of various sizesDetails
corrugated metal awning structure above entry. size approx 8'x18'. structural drawings included. 7 canvas awnings of various sizes | $8,000 | |
| Nov 21, 2011 | Completed final sign-off Apr 2012 | 1485 Mcallister St | Westwind Builders | kitchen & bathroom remodel to include opening up the kitchen onto dining room, removing an interior wall between the water closet & bathroom, & reorganizing the closets between the dining room & bedroom.Details
kitchen & bathroom remodel to include opening up the kitchen onto dining room, removing an interior wall between the water closet & bathroom, & reorganizing the closets between the dining room & bedroom. | $75,000 |
| May 12, 2011 | Expired or cancelled withdrawn Sep 2011 | 890 Valencia St | eliminate 8 sidewalk skylights & replace with concrete sidewalk. eliminate 1 coal loading shaft opening & replace with concrete sidewalk, elimnate 1 elevator shaft opening & replace with concrete sidewalkDetails
eliminate 8 sidewalk skylights & replace with concrete sidewalk. eliminate 1 coal loading shaft opening & replace with concrete sidewalk, elimnate 1 elevator shaft opening & replace with concrete sidewalk | $35,000 | |
| Feb 22, 2011 | Never finaled issued Mar 2011, no final | 890 Valencia St | Whiteside Construction Corp. | construction of new concrete shearwalls in basemnt for voluntary structural strengthening. new steel frames behind windows, no change to (e) facade/storefront. add ada bath to 1st level.Details
construction of new concrete shearwalls in basemnt for voluntary structural strengthening. new steel frames behind windows, no change to (e) facade/storefront. add ada bath to 1st level. | $80,000 |
| Feb 4, 2010 | Completed final sign-off Jul 2011 | 366 Chenery St | Rick Davis | replace foundation @ sides & rear.Details
replace foundation @ sides & rear. | $75,000 |
| Oct 6, 2008 | Completed final sign-off Dec 2008 | 84 Richland Av | Mark Scott Construction Inc | removing existing brick foundation under garage and replace w/ concrete foundation.Details
removing existing brick foundation under garage and replace w/ concrete foundation. | $15,773 |
| Oct 2, 2007 | Completed final sign-off Jul 2008 | 2655 Hyde St | Dinyari Construction Inc. | replace ex. flooring and railing materials on ex. roof deck. ex. mental railing to be replaced by glass pannels. demolish ladder to ex. fire escape and replace with diagonal ladder to comply with nov 200794506Details
replace ex. flooring and railing materials on ex. roof deck. ex. mental railing to be replaced by glass pannels. demolish ladder to ex. fire escape and replace with diagonal ladder to comply with nov 200794506 | $11,700 |
| Apr 1, 2005 | Expired or cancelled expired Dec 2010 | 2899 19th Av | revision to app3200406085874. structural details of caropy shackles.Details
revision to app3200406085874. structural details of caropy shackles. | $10,000 |