507 permits since 2000 (contractor on 507 permits, authorized agent-others on 6 permits, designer on 5 permits): 390 completed, 8 in progress, 59 never finaled, 50 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. Their ranked record as a contractor is on their contractor page. How to read these records
Worked with
Every other licensed party on the 100 most recent of their permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Universe Alliance Inc Dba Universe Cons (2), Pete Moffat Construction Inc
- Architects
- Fredrick Charles Walovich
- Engineers
- Jeff Tunison (7), Joseph Quilici (2), Albert Urrutia, Jeff Williams, Kirk Wagner
Most recent permits
Showing the 100 most recent of 507.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 15, 2025 | Completed final sign-off Jan 2026 | 1660 20th Av | Axis Construction | water proofing, stucco and trim surrounding existing windows, replace windows with new vinyl windows, existing opening, install new gsm flashing and water proofing, paint to resemble existing, inlcudes interior repairs, like for like, no changes to size and configuration.Details
water proofing, stucco and trim surrounding existing windows, replace windows with new vinyl windows, existing opening, install new gsm flashing and water proofing, paint to resemble existing, inlcudes interior repairs, like for like, no changes to size and configuration. | $10,406 |
| Nov 13, 2025 | Completed final sign-off Sep 2026 | 1804 Ellis St | Axis Construction | partial repairs to ext bldg envelope, as-needed basis, replace (e) wood siding w? james hardie cementitious siding to resemble (e) & other voluntary repairs. rr windows within (e) framed openings, rr & repair (e) trellis, bldg materials will be replaced inkind. repaint bldg to (e) color. common areaDetails
partial repairs to ext bldg envelope, as-needed basis, replace (e) wood siding w? james hardie cementitious siding to resemble (e) & other voluntary repairs. rr windows within (e) framed openings, rr & repair (e) trellis, bldg materials will be replaced inkind. repaint bldg to (e) color. common area | $110,438 |
| Nov 13, 2025 | Completed final sign-off Oct 2026 | 1860 Ellis St | Axis Construction | partial repairs to ext bldg envelope, as-needed basis, replace (e) wood siding w? james hardie cementitious siding to resemble (e) & other voluntary repairs. rr windows within (e) framed openings, rr & repair (e) trellis, bldg materials will be replaced inkind. repaint bldg to (e) color. common areaDetails
partial repairs to ext bldg envelope, as-needed basis, replace (e) wood siding w? james hardie cementitious siding to resemble (e) & other voluntary repairs. rr windows within (e) framed openings, rr & repair (e) trellis, bldg materials will be replaced inkind. repaint bldg to (e) color. common area | $190,980 |
| Nov 13, 2025 | Completed final sign-off Oct 2026 | 1310 Scott St | Axis Construction | partial repairs to ext bldg envelope, as-needed basis, replace (e) wood siding w? james hardie cementitious siding to resemble (e) & other voluntary repairs. rr windows within (e) framed openings, rr & repair (e) trellis, bldg materials will be replaced inkind. repaint bldg to (e) color. common areaDetails
partial repairs to ext bldg envelope, as-needed basis, replace (e) wood siding w? james hardie cementitious siding to resemble (e) & other voluntary repairs. rr windows within (e) framed openings, rr & repair (e) trellis, bldg materials will be replaced inkind. repaint bldg to (e) color. common area | $185,790 |
| Nov 13, 2025 | Completed final sign-off Oct 2026 | 1830 Ellis St | Axis Construction | partial repairs to ext bldg envelope, as-needed basis, replace (e) wood siding w? james hardie cementitious siding to resemble (e) & other voluntary repairs. rr windows within (e) framed openings, rr & repair (e) trellis, bldg materials will be replaced inkind. repaint bldg to (e) color. common areaDetails
partial repairs to ext bldg envelope, as-needed basis, replace (e) wood siding w? james hardie cementitious siding to resemble (e) & other voluntary repairs. rr windows within (e) framed openings, rr & repair (e) trellis, bldg materials will be replaced inkind. repaint bldg to (e) color. common area | $109,902 |
| Nov 13, 2025 | Completed final sign-off Sep 2026 | 1810 Ellis St | Axis Construction | partial repairs to ext bldg envelope, as-needed basis, replace (e) wood siding w? james hardie cementitious siding to resemble (e) & other voluntary repairs. rr windows within (e) framed openings, rr & repair (e) trellis, bldg materials will be replaced inkind. repaint bldg to (e) color. common areaDetails
partial repairs to ext bldg envelope, as-needed basis, replace (e) wood siding w? james hardie cementitious siding to resemble (e) & other voluntary repairs. rr windows within (e) framed openings, rr & repair (e) trellis, bldg materials will be replaced inkind. repaint bldg to (e) color. common area | $75,553 |
| Nov 3, 2025 | Completed final sign-off Dec 2025 | 2363 31st Av | Axis Construction | waterproofing repair remove *e) damaged roof memebrane at 7'x2' lightwell. install (n) flashing and (n) waterproof membrane, replacement is like for like not visible from street.Details
waterproofing repair remove *e) damaged roof memebrane at 7'x2' lightwell. install (n) flashing and (n) waterproof membrane, replacement is like for like not visible from street. | $8,800 |
| Sep 11, 2025 | Completed final sign-off Sep 2026 | 1864 Ellis St | Axis Construction | common area partial repairs to ext'r of bldg envelope, on an as needed basis including replacing (e) wood siding w/james hardie cementitious siding to resemble (e) and other misc voluntary repairs; other bldg materials will be replaced "in-kind";re-paint bldg to match (e) colors.Details
common area partial repairs to ext'r of bldg envelope, on an as needed basis including replacing (e) wood siding w/james hardie cementitious siding to resemble (e) and other misc voluntary repairs; other bldg materials will be replaced "in-kind";re-paint bldg to match (e) colors. | $98,444 |
| Sep 11, 2025 | Completed final sign-off Sep 2026 | 1320 Scott St | Axis Construction | partial repair to ext'r of bldg envelope, on as needed basis including replacing (e) wood siding to resemble 9e) and other misc voluntary repairs; other bldg materials will be replaced "in-kind" re-paint bldg match 9e) colors. work in common areaDetails
partial repair to ext'r of bldg envelope, on as needed basis including replacing (e) wood siding to resemble 9e) and other misc voluntary repairs; other bldg materials will be replaced "in-kind" re-paint bldg match 9e) colors. work in common area | $21,143 |
| Sep 11, 2025 | Completed final sign-off Oct 2026 | 1862 Ellis St | Axis Construction | common area - partial repairs to ext'r of bldg envelope on an as needed basis including replacing (e) wood siding with james hardie cementitious siding to resemble (e), and other misc voluntary repairs; other bldg materials will be replaced in-kind; re-paint bldg to match (e) colors.Details
common area - partial repairs to ext'r of bldg envelope on an as needed basis including replacing (e) wood siding with james hardie cementitious siding to resemble (e), and other misc voluntary repairs; other bldg materials will be replaced in-kind; re-paint bldg to match (e) colors. | $136,373 |
| Sep 11, 2025 | Completed final sign-off Oct 2026 | 1332 Scott St | Axis Construction | common area partial repairs to ext'r of bldg envelope, on an as needed basis including replacing (e) wood siding with james hardi cementitious siding to resemble (e) and other misc voluntary repairs other bldg materials will be replaced "in-kind"; re-paint bldg to match (e) colors.Details
common area partial repairs to ext'r of bldg envelope, on an as needed basis including replacing (e) wood siding with james hardi cementitious siding to resemble (e) and other misc voluntary repairs other bldg materials will be replaced "in-kind"; re-paint bldg to match (e) colors. | $177,772 |
| Sep 11, 2025 | Completed final sign-off Oct 2026 | 1326 Scott St | Axis Construction | common area - partial repairs to ext'r of bldg envelope, on as needed bsis including replacing (e) wood siding w/james hardi cementitious siding to resemble (e) and other misc voluntary repairs; other bldg materials will be replaced in-kind. re-paint bldg to match (e) colorsDetails
common area - partial repairs to ext'r of bldg envelope, on as needed bsis including replacing (e) wood siding w/james hardi cementitious siding to resemble (e) and other misc voluntary repairs; other bldg materials will be replaced in-kind. re-paint bldg to match (e) colors | $146,154 |
| Jun 30, 2025 | Completed final sign-off Jan 2026 | 2875 21st St | Axis Construction | water proofing repairs: r/r approx 80 sq ft existing stucco. remove/ re set one set of existing windows, install new water proofing and flashing. paint to resemble existing, includes associated interior repair. repair and replace is like for like. work is hoa/ common area.Details
water proofing repairs: r/r approx 80 sq ft existing stucco. remove/ re set one set of existing windows, install new water proofing and flashing. paint to resemble existing, includes associated interior repair. repair and replace is like for like. work is hoa/ common area. | $17,324 |
| May 19, 2025 | Completed final sign-off Nov 2025 | 1685 19th Av | Axis Construction | existing drain line repairs: r/r approx 3' x 5' portion of (e) interior concrete slab; repair approx .5 l.f portion of (e) sewer drain line below (e) slab. replacement work is like for like. not visible from street. work is hoa includeds associated interior repairsDetails
existing drain line repairs: r/r approx 3' x 5' portion of (e) interior concrete slab; repair approx .5 l.f portion of (e) sewer drain line below (e) slab. replacement work is like for like. not visible from street. work is hoa includeds associated interior repairs | $8,000 |
| Apr 17, 2025 | Completed final sign-off Jun 2025 | 1979 Ofarrell St | Axis Construction | replace 8 (e) windows within (e) frame openings; work is replacement in-kind with no changes in size or configuration. voluntary repairs. work is common area | hoa. max u-factor 0.30.Details
replace 8 (e) windows within (e) frame openings; work is replacement in-kind with no changes in size or configuration. voluntary repairs. work is common area | hoa. max u-factor 0.30. | $5,736 |
| Apr 17, 2025 | Completed final sign-off Jan 2026 | 1977 Ofarrell St | Axis Construction | replace 20 (e) windows within (e) frame openings; work is replacement in-kind with no changes in size or configuration. voluntary repairs. work is common area | hoa. max u-factor 0.30.Details
replace 20 (e) windows within (e) frame openings; work is replacement in-kind with no changes in size or configuration. voluntary repairs. work is common area | hoa. max u-factor 0.30. | $16,135 |
| Jan 31, 2025 | Completed final sign-off Feb 2026 | 1340 Scott St | Axis Construction | partial repair to exterior bldg envelope, on an as-needed basis, including replace e) wood sidings w/ james hardie cementions siding to resemble e). other miscellaneous voluntary repairs. other building materials will be replaced in kind, re paint bldg to match e) colors, work in common areaDetails
partial repair to exterior bldg envelope, on an as-needed basis, including replace e) wood sidings w/ james hardie cementions siding to resemble e). other miscellaneous voluntary repairs. other building materials will be replaced in kind, re paint bldg to match e) colors, work in common area | $90,385 |
| Jan 31, 2025 | Completed final sign-off Feb 2026 | 1350 Scott St | Axis Construction | partial repair to exterior bldg envelope, on an as-needed basis, including replace e) wood sidings w/ james hardie cementions siding to resemble e). other miscellaneous voluntary repairs. other building materials will be replaced in kind, re paint bldg to match e) colors, work in common areaDetails
partial repair to exterior bldg envelope, on an as-needed basis, including replace e) wood sidings w/ james hardie cementions siding to resemble e). other miscellaneous voluntary repairs. other building materials will be replaced in kind, re paint bldg to match e) colors, work in common area | $193,299 |
| Jan 31, 2025 | Completed final sign-off Feb 2026 | 1979 Ofarrell St | Axis Construction | partial repair to exterior bldg envelope, on an as-needed basis, including replace e) wood sidings w/ james hardie cementions siding to resemble e). other miscellaneous voluntary repairs. other building materials will be replaced in kind, re paint bldg to match e) colors, work in common areaDetails
partial repair to exterior bldg envelope, on an as-needed basis, including replace e) wood sidings w/ james hardie cementions siding to resemble e). other miscellaneous voluntary repairs. other building materials will be replaced in kind, re paint bldg to match e) colors, work in common area | $220,921 |
| Jan 31, 2025 | Completed final sign-off Feb 2026 | 1977 Ofarrell St | Axis Construction | partial repair to exterior bldg envelope, on an as-needed basis, including replace e) wood sidings w/ james hardie cementions siding to resemble e). other miscellaneous voluntary repairs. other building materials will be replaced in kind, re paint bldg to match e) colors, work in common areaDetails
partial repair to exterior bldg envelope, on an as-needed basis, including replace e) wood sidings w/ james hardie cementions siding to resemble e). other miscellaneous voluntary repairs. other building materials will be replaced in kind, re paint bldg to match e) colors, work in common area | $249,855 |
| Jan 31, 2025 | Completed final sign-off Feb 2026 | 1348 Scott St | Axis Construction | partial repair to exterior bldg envelope, on an as-needed basis, including replace e) wood sidings w/ james hardie cementions siding to resemble e). other miscellaneous voluntary repairs. other building materials will be replaced in kind, re paint bldg to match e) colors, work in common areaDetails
partial repair to exterior bldg envelope, on an as-needed basis, including replace e) wood sidings w/ james hardie cementions siding to resemble e). other miscellaneous voluntary repairs. other building materials will be replaced in kind, re paint bldg to match e) colors, work in common area | $39,037 |
| Oct 29, 2024 | In progress issued Oct 2024 | 1020 Mariposa St | Axis Construction | unit# 3: water proofing repairs remove deck surface at (e) balcony r/r (e) stucco at balcony perimeter, balcony fl. membrane, substante and flashing install new excel coat decking system remove re-install (e) light fixture repair associated interior surfaces paint to match replay is like-for-likeDetails
unit# 3: water proofing repairs remove deck surface at (e) balcony r/r (e) stucco at balcony perimeter, balcony fl. membrane, substante and flashing install new excel coat decking system remove re-install (e) light fixture repair associated interior surfaces paint to match replay is like-for-like | $14,645 |
| Oct 7, 2024 | Expired or cancelled withdrawn Mar 2025 | 1979 O'farrell St | Axis Construction | partial repairs to exterior building envelope on an as needed basis including replacing (e) wood sidng with james hardie connections siding to resemble (e) and other misc. voluntary repairs. other building materials will be replaced in kind. repaint building to match (e) colors, work in common area.Details
partial repairs to exterior building envelope on an as needed basis including replacing (e) wood sidng with james hardie connections siding to resemble (e) and other misc. voluntary repairs. other building materials will be replaced in kind. repaint building to match (e) colors, work in common area. | $220,920 |
| Oct 7, 2024 | Expired or cancelled withdrawn Mar 2025 | 1977 Ofarrell St | Axis Construction | partial repairs to exterior building envelope,on an as needed basis. inluding replacing e wood siding with james hardie cementitious siding to resemble existing, and other misc voluntary repairs. other building materirals will be replaced in kind. repaint building to match e colors. work common areaDetails
partial repairs to exterior building envelope,on an as needed basis. inluding replacing e wood siding with james hardie cementitious siding to resemble existing, and other misc voluntary repairs. other building materirals will be replaced in kind. repaint building to match e colors. work common area | $249,855 |
| Sep 24, 2024 | Completed final sign-off Mar 2025 | 11 Franklin St | Axis Construction | installl (n) metal catwalk at roof area per attached engineer plans. work not visible from street and is in the common areaDetails
installl (n) metal catwalk at roof area per attached engineer plans. work not visible from street and is in the common area | $19,450 |
| Aug 9, 2024 | Completed final sign-off Sep 2024 | 1020 Mariposa St | Axis Construction | waterproofing repairs: r/r existing stucco at deck & surrounding sliding glass door. remove/reinstall existing sliding glass door; remove existing concrete deck surface. r/r plywood substrate; install new waterproofing, flashing, door pan; prime/paint affected areas to resembleDetails
waterproofing repairs: r/r existing stucco at deck & surrounding sliding glass door. remove/reinstall existing sliding glass door; remove existing concrete deck surface. r/r plywood substrate; install new waterproofing, flashing, door pan; prime/paint affected areas to resemble | $43,809 |
| Jun 17, 2024 | In progress issued Jun 2024 | 1020 Mariposa St | Axis Construction | unit #3: beams repair to dry rotted section at first living level, front of building of unit 3 (beam located at ceiling of unit 1)Details
unit #3: beams repair to dry rotted section at first living level, front of building of unit 3 (beam located at ceiling of unit 1) | $2,000 |
| May 30, 2024 | In progress issued May 2024 | 1020 Mariposa St | Axis Construction | revision to permit#: 2023.0823.5023. repair to (e) framing in (e) exterior drywall, work is like for like. visible from the street.Details
revision to permit#: 2023.0823.5023. repair to (e) framing in (e) exterior drywall, work is like for like. visible from the street. | $54,774 |
| May 30, 2024 | Completed final sign-off Apr 2026 | 1020 Mariposa St | Axis Construction | exploratory permit work: remove portions of existing interior drywall for investigation and observation. investigative work no repairs. (if no issues, patch up)Details
exploratory permit work: remove portions of existing interior drywall for investigation and observation. investigative work no repairs. (if no issues, patch up) | $12,368 |
| May 20, 2024 | In progress issued May 2024 | 1310 Scott St | Axis Construction | exterior waterproofing repairs: at (e) window r/r (e) siding and trim, exterior drywall, insullation, waterproofing, gsm head flashings; rime and paint to resemble (e). includes associated interior repair work. work is like for like, no change in size or configuration. work is exterior hoa/common.Details
exterior waterproofing repairs: at (e) window r/r (e) siding and trim, exterior drywall, insullation, waterproofing, gsm head flashings; rime and paint to resemble (e). includes associated interior repair work. work is like for like, no change in size or configuration. work is exterior hoa/common. | $7,501 |
| Apr 2, 2024 | Completed final sign-off Apr 2024 | 35 Dolores St | Axis Construction | scupper repairs: r/r (e) roof cover adjacent to scupper; r/r approx. 48sqft, (e) siding; replace metal scupper including new flashing, waterproofing and sealant; prime and paint to resemble (e) repairs like for like; work is exterior common area, adjacent unit 404; not visible from the street.Details
scupper repairs: r/r (e) roof cover adjacent to scupper; r/r approx. 48sqft, (e) siding; replace metal scupper including new flashing, waterproofing and sealant; prime and paint to resemble (e) repairs like for like; work is exterior common area, adjacent unit 404; not visible from the street. | $20,771 |
| Apr 2, 2024 | In progress issued Apr 2024 | 2875 21st St | Axis Construction | revision to pa#: 2023.1204.1891 additional waterproofing repairs: r/r approx 325 sq ft. (e) exterior stucco around 7 windows; includes tie-in new waterproofing lath, new gsm head flashings; paint to resemble (e); work is exterior common area, not visible from street, replacement is like for like.Details
revision to pa#: 2023.1204.1891 additional waterproofing repairs: r/r approx 325 sq ft. (e) exterior stucco around 7 windows; includes tie-in new waterproofing lath, new gsm head flashings; paint to resemble (e); work is exterior common area, not visible from street, replacement is like for like. | $30,608 |
| Feb 13, 2024 | In progress issued Feb 2024 | 1020 Mariposa St | Axis Construction | waterproofing repairs: r/r (e) stucco @ rear perimeter & around door; remove/reinstall (e) door; remove (e) concrete deck surface; r/r plywood substrate; install new waterproofing, flashing, door pan excel-coat deck membrane; repair interior surfaces @ door; prime/paint affected areas to resemble...Details
waterproofing repairs: r/r (e) stucco @ rear perimeter & around door; remove/reinstall (e) door; remove (e) concrete deck surface; r/r plywood substrate; install new waterproofing, flashing, door pan excel-coat deck membrane; repair interior surfaces @ door; prime/paint affected areas to resemble... | $53,568 |
| Jan 24, 2024 | In progress issued Feb 2024 | 325 Berry St | Axis Construction | exterior repair: r/r portion of (e) exterior concrete topping slab at patio area. non structural work. exterior work -common/hoa area. one location adjustment to unit 105. replace is like for like with no change in size or configuration.Details
exterior repair: r/r portion of (e) exterior concrete topping slab at patio area. non structural work. exterior work -common/hoa area. one location adjustment to unit 105. replace is like for like with no change in size or configuration. | $10,150 |
| Jan 17, 2024 | Completed final sign-off Feb 2024 | 325 Berry St | Axis Construction | exterior repair: install new gsm head flashing over existing exterior awning, kerf cut into existing stucco, sqt in mastic, exterior work- common/hoa area, one location adjacent to unit 725. not visible from street.Details
exterior repair: install new gsm head flashing over existing exterior awning, kerf cut into existing stucco, sqt in mastic, exterior work- common/hoa area, one location adjacent to unit 725. not visible from street. | $16,000 |
| Jan 3, 2024 | Completed final sign-off Jan 2025 | 260 Clara St | Axis Construction | common area; waterproofing repairs: r/r waterproofing coating on existing exterior deck, including new plywood substrate and new perimeter flashing, replacment is like for like. no change size or configuration. work is exterior/hoa. adjacent to unit 4. not visible from streetDetails
common area; waterproofing repairs: r/r waterproofing coating on existing exterior deck, including new plywood substrate and new perimeter flashing, replacment is like for like. no change size or configuration. work is exterior/hoa. adjacent to unit 4. not visible from street | $39,353 |
| Dec 13, 2023 | Completed final sign-off Nov 2024 | 350 Broderick St | Axis Construction | window and door replacement: r/r existing trim around selected windows and doors. r/r selected windows & doors including new waterproofing, paint trim to resemble existing color, replacement is like for like: no change to size or configuration. work is exterior/ hoa.(1) window is street facingDetails
window and door replacement: r/r existing trim around selected windows and doors. r/r selected windows & doors including new waterproofing, paint trim to resemble existing color, replacement is like for like: no change to size or configuration. work is exterior/ hoa.(1) window is street facing | $152,907 |
| Dec 4, 2023 | Completed final sign-off Apr 2024 | 2875 21st St | Axis Construction | waterproofing repairs: r/r approx 50 sq ft. (e) exterior stucco around one window; includes tie-in new waterproofing lath, new gsm head flashings; paint to resemble (e); work is exterior common area, not visible from street, replacement is like for like.Details
waterproofing repairs: r/r approx 50 sq ft. (e) exterior stucco around one window; includes tie-in new waterproofing lath, new gsm head flashings; paint to resemble (e); work is exterior common area, not visible from street, replacement is like for like. | $5,239 |
| Nov 20, 2023 | In progress issued Nov 2023 | 221 Clara St | Axis Construction | unit 2: exploratory permit/work: remove portions of (e) exterior stucco for invetigation and observation. investigative work - non-structural, no repairs, exterior common area sufaces, not visible from street. patch back like-for-likeDetails
unit 2: exploratory permit/work: remove portions of (e) exterior stucco for invetigation and observation. investigative work - non-structural, no repairs, exterior common area sufaces, not visible from street. patch back like-for-like | $3,836 |
| Oct 11, 2023 | Completed final sign-off Nov 2023 | 1979 Ofarrell St | Axis Construction | exterior railing and landing repairs: on existing railings and landings, r/r selective surface boards, top rails/cap, fiascia, railing post; prime and paint to resemble existing. replacement is like-for-like. not visible from street. work is in common area.Details
exterior railing and landing repairs: on existing railings and landings, r/r selective surface boards, top rails/cap, fiascia, railing post; prime and paint to resemble existing. replacement is like-for-like. not visible from street. work is in common area. | $5,278 |
| Oct 11, 2023 | Completed final sign-off Nov 2023 | 1350 Scott St | Axis Construction | exterior railing and landing repairs: on existing railings and landings, r/r selective surface boards, top rails/cap, fiascia, railing post; prime and paint to resemble existing. replacement is like-for-like. not visible from street. work is in common area.Details
exterior railing and landing repairs: on existing railings and landings, r/r selective surface boards, top rails/cap, fiascia, railing post; prime and paint to resemble existing. replacement is like-for-like. not visible from street. work is in common area. | $2,154 |
| Oct 10, 2023 | Completed final sign-off Nov 2023 | 1804 Ellis St | Axis Construction | exterior railing and landing repairs: on extg railings and landings. r/r selective surface boards, top rail/cap, fascia, railing post, prime and paint to resemble extg. replacement is like for like. not visible from street. less then 50%. work on common area.Details
exterior railing and landing repairs: on extg railings and landings. r/r selective surface boards, top rail/cap, fascia, railing post, prime and paint to resemble extg. replacement is like for like. not visible from street. less then 50%. work on common area. | $2,154 |
| Oct 10, 2023 | Completed final sign-off Nov 2023 | 1864 Ellis St | Axis Construction | exterior railing and landing repairs: on extg railings and landings. r/r selective surface boards, top rail/cap, fascia, railing post, prime and paint to resemble extg. replacement is like for like. no visible from street. less than 50%. work on common area.Details
exterior railing and landing repairs: on extg railings and landings. r/r selective surface boards, top rail/cap, fascia, railing post, prime and paint to resemble extg. replacement is like for like. no visible from street. less than 50%. work on common area. | $2,154 |
| Oct 6, 2023 | Never finaled issued Oct 2023, no final | 1461 Broadway | Axis Construction | roof walking surface repairs: install new drainage mat and new walking surface composite boards at existing area. not visible from street.Details
roof walking surface repairs: install new drainage mat and new walking surface composite boards at existing area. not visible from street. | $10,826 |
| Sep 20, 2023 | Completed final sign-off Dec 2023 | 11 Franklin St | Axis Construction | hvac repairs: remove an replace insulation on (e) refrigerant lines. replace (e) clamps on same refrigerant lines with new cushion type clamps. work at roof location (not visible from street). clamps per manufacturers's recommendations.Details
hvac repairs: remove an replace insulation on (e) refrigerant lines. replace (e) clamps on same refrigerant lines with new cushion type clamps. work at roof location (not visible from street). clamps per manufacturers's recommendations. | $22,427 |
| Sep 18, 2023 | Completed final sign-off Feb 2024 | 161 Gilbert St | Axis Construction | waterproofing repairs: r/r existing stucco around exisiting window: install new flashing and waterproofing at window. repair existing interior drywall around window; trim and paint to resemble existing: repacement is like for like: not visible from the street.Details
waterproofing repairs: r/r existing stucco around exisiting window: install new flashing and waterproofing at window. repair existing interior drywall around window; trim and paint to resemble existing: repacement is like for like: not visible from the street. | $15,802 |
| Sep 18, 2023 | Completed final sign-off Feb 2024 | 161 Gilbert St | Axis Construction | waterproofing repairs: r/r existing stucco around exisiting window: install new flashing and waterproofing at window. repair existing interior drywall around window; trim and paint to resemble existing: repacement is like for like: not visible from the street.Details
waterproofing repairs: r/r existing stucco around exisiting window: install new flashing and waterproofing at window. repair existing interior drywall around window; trim and paint to resemble existing: repacement is like for like: not visible from the street. | $4,472 |
| Sep 8, 2023 | Completed final sign-off Sep 2023 | 1716 20th Av | Axis Construction | insullation and drywall repairs:r/r insulation and drywall at existing affected wall and ceiling areas at interior of garage; includes fire tape at new drywall; new materials and finishes to resemble existing.Details
insullation and drywall repairs:r/r insulation and drywall at existing affected wall and ceiling areas at interior of garage; includes fire tape at new drywall; new materials and finishes to resemble existing. | $8,793 |
| Aug 23, 2023 | Never finaled issued Aug 2023, no final | 1020 Mariposa St | Axis Construction | exploratory permit work: remove portions of exterior existing stucco for investigation and observation. investigative work no repairs, not to exceed 200 square feetDetails
exploratory permit work: remove portions of exterior existing stucco for investigation and observation. investigative work no repairs, not to exceed 200 square feet | $10,323 |
| Jul 18, 2023 | Completed final sign-off Aug 2023 | 1020 Mariposa St | Axis Construction | waterproofing repairs: r/r stucco deck perimeter and surrounding sliding glass door; remove/reinstall (e) remove (e) concrete dock surface, r/r plywood substaate, install new waterproofing, flashhing and door pan, install new coat fire system membrane, repair interior surfaces around glass door...Details
waterproofing repairs: r/r stucco deck perimeter and surrounding sliding glass door; remove/reinstall (e) remove (e) concrete dock surface, r/r plywood substaate, install new waterproofing, flashhing and door pan, install new coat fire system membrane, repair interior surfaces around glass door... | $27,687 |
| Jun 21, 2023 | Completed final sign-off Aug 2023 | 1687 19th Av | Axis Construction | waterproofing repairs: including r/r stucco above (e) catwalk structure; install new 2 bar as head flashing above catwalk; install new waterproofing; prime/paint new stucco to resemble (e) color. (approx. 16 sq. ft area at court yard, not facing st.)Details
waterproofing repairs: including r/r stucco above (e) catwalk structure; install new 2 bar as head flashing above catwalk; install new waterproofing; prime/paint new stucco to resemble (e) color. (approx. 16 sq. ft area at court yard, not facing st.) | $4,163 |
| Jun 21, 2023 | Completed final sign-off Aug 2023 | 1747 19th Av | Axis Construction | waterproofing repairs: exterior - r/r stucco and trim surrounding (e) window; install new waterproofing; prime/paint new stucco to resemble (e) color. interior - r/r affected sheetrock surrounding (e) windows; prime/paint enire affected wall to resemble (e) color. (facing st. approx. 30 sq. ft. areaDetails
waterproofing repairs: exterior - r/r stucco and trim surrounding (e) window; install new waterproofing; prime/paint new stucco to resemble (e) color. interior - r/r affected sheetrock surrounding (e) windows; prime/paint enire affected wall to resemble (e) color. (facing st. approx. 30 sq. ft. area | $9,390 |
| May 26, 2023 | Completed final sign-off Nov 2023 | 1804 Ellis St | Axis Construction | work to the (e) stairway to remove and replace damaged/dry rot structure framing members per engineers plans. work is all like-for-like with no change in size or appearance and envelope.Details
work to the (e) stairway to remove and replace damaged/dry rot structure framing members per engineers plans. work is all like-for-like with no change in size or appearance and envelope. | $59,715 |
| May 16, 2023 | Completed final sign-off Sep 2023 | 1145 Pine St | Axis Construction | waterproofing repairs: r/r waterproofing membrane and flashing at floor of lightwell. r/r trim and siding at two (e) wood windows and remove the windows, and replace with (n) windows with fiber glass exterior frame and wood interior frame, including new gsm heat flashing and waterproofing; paint toDetails
waterproofing repairs: r/r waterproofing membrane and flashing at floor of lightwell. r/r trim and siding at two (e) wood windows and remove the windows, and replace with (n) windows with fiber glass exterior frame and wood interior frame, including new gsm heat flashing and waterproofing; paint to | $18,382 |
| May 5, 2023 | Completed final sign-off May 2023 | 1804 Ellis St | Axis Construction | installation of drywall repairs: install ceiling insullation, install ceiling and wall drywall, prime and paint to resemble existing work is like for like. 5/8 type 'x' glue at celings and unit demising wallsDetails
installation of drywall repairs: install ceiling insullation, install ceiling and wall drywall, prime and paint to resemble existing work is like for like. 5/8 type 'x' glue at celings and unit demising walls | $3,836 |
| Apr 4, 2023 | Completed final sign-off Apr 2023 | 1710 20th Av | Axis Construction | waterproofing repairs: including r/r stucco on exisitng walls in affected area: r/r roof shingles on existing roof in affected area: install new flashing and waterproofing: paint affected areas to resemble existing. replacement is like for like. not visible from street.Details
waterproofing repairs: including r/r stucco on exisitng walls in affected area: r/r roof shingles on existing roof in affected area: install new flashing and waterproofing: paint affected areas to resemble existing. replacement is like for like. not visible from street. | $13,388 |
| Mar 6, 2023 | Never finaled issued Mar 2023, no final | 1687 19th Av | Axis Construction | administrative permit to correct incorrect address on 202204142222: correct address is 1687 19th avenueDetails
administrative permit to correct incorrect address on 202204142222: correct address is 1687 19th avenue | |
| Feb 2, 2023 | Completed final sign-off Mar 2023 | 1716 20th Av | Axis Construction | waterproofing repairs: r/r stucco and trim surrounding (e) window, r/r wdw with new vinyl window to resemble (e). install new gsm head flashing and waterproofing; paint affected areas to resemble (e). replcement is like-for-like with no change in size or configuration.Details
waterproofing repairs: r/r stucco and trim surrounding (e) window, r/r wdw with new vinyl window to resemble (e). install new gsm head flashing and waterproofing; paint affected areas to resemble (e). replcement is like-for-like with no change in size or configuration. | $9,277 |
| Jan 30, 2023 | Completed final sign-off Apr 2023 | 1320 Scott St | Axis Construction | repairs to existing exterior stairs: r/r existing stair treads/risers and one stringer, replacement is like-for-like. r/r existing stair railing to match adjacent stair railing and meet code. paint affected areas to match existing. less the 50% repair.Details
repairs to existing exterior stairs: r/r existing stair treads/risers and one stringer, replacement is like-for-like. r/r existing stair railing to match adjacent stair railing and meet code. paint affected areas to match existing. less the 50% repair. | $12,514 |
| Nov 15, 2022 | Never finaled issued Nov 2022, no final | 739 36th Av | Axis Construction | exploratory permit/ work: water test and remove portion of stucco for investigation and observation investigation work. patch everything back in-kindDetails
exploratory permit/ work: water test and remove portion of stucco for investigation and observation investigation work. patch everything back in-kind | $2,000 |
| Sep 30, 2022 | Completed final sign-off Oct 2022 | 1804 Ellis St | Axis Construction | remove and replace (3) 3x6x4 deck boards at top landing: less than 50%. ref bpa#2022-0209-7652Details
remove and replace (3) 3x6x4 deck boards at top landing: less than 50%. ref bpa#2022-0209-7652 | $1,000 |
| Sep 19, 2022 | Completed final sign-off May 2023 | 1805 Pine St | Axis Construction | waterproofing repairs: remove/replace approx 84sqft of stucco-including gsm head flashing new waterproofing, wood window trim and paint to match existing. replacement is like for like: no change in appearance.Details
waterproofing repairs: remove/replace approx 84sqft of stucco-including gsm head flashing new waterproofing, wood window trim and paint to match existing. replacement is like for like: no change in appearance. | $8,413 |
| Sep 8, 2022 | Never finaled issued Sep 2022, no final | 751 36th Av | Axis Construction | interior sheetrock work: remove portion of interior sheetrock for investigation and observation, immediately re-install (e) sheetrock to match (e) work in approx 2 units, investigative work no repairsDetails
interior sheetrock work: remove portion of interior sheetrock for investigation and observation, immediately re-install (e) sheetrock to match (e) work in approx 2 units, investigative work no repairs | $1,500 |
| Sep 8, 2022 | Completed final sign-off Oct 2022 | 739 36th Av | Axis Construction | interior sheetrock work: remove portion of interior sheetrock for investigation and observation, immediately re-install (e) sheetrock to match (e) work in approx 2 units, investigative work no repairsDetails
interior sheetrock work: remove portion of interior sheetrock for investigation and observation, immediately re-install (e) sheetrock to match (e) work in approx 2 units, investigative work no repairs | $1,500 |
| Sep 8, 2022 | Completed final sign-off Oct 2022 | 757 36th Av | Axis Construction | interior sheetrock work: remove portion of interior sheetrock for investigation and observation, immediately re-install (e) sheetrock to match (e) work in approx 2 units, investigative work no repairsDetails
interior sheetrock work: remove portion of interior sheetrock for investigation and observation, immediately re-install (e) sheetrock to match (e) work in approx 2 units, investigative work no repairs | $1,500 |
| Jun 23, 2022 | Completed final sign-off Jul 2022 | 101 Valencia St | Axis Construction | unit a-208: repair & replace stucco immediately surrounding existing window; install new flashing and waterproofing; like for like with no change in size, configuration or appearance. not visible from street.Details
unit a-208: repair & replace stucco immediately surrounding existing window; install new flashing and waterproofing; like for like with no change in size, configuration or appearance. not visible from street. | $10,433 |
| Jun 23, 2022 | Completed final sign-off Sep 2022 | 101 Valencia St | Axis Construction | unit a-406: repair & replace stucco immediately surrounding existing window; install new flashing and waterproofing; like for like with no change in size, configuration.Details
unit a-406: repair & replace stucco immediately surrounding existing window; install new flashing and waterproofing; like for like with no change in size, configuration. | $10,433 |
| Jun 8, 2022 | Completed final sign-off Jul 2022 | 1687 19th Av | Axis Construction | install new flashing including r/r approx 54 concrete deck topping slab, including substraight membraine, flashing and drainage, no change to size or configuration or appearance not visible from the streetDetails
install new flashing including r/r approx 54 concrete deck topping slab, including substraight membraine, flashing and drainage, no change to size or configuration or appearance not visible from the street | |
| May 18, 2022 | Completed final sign-off Jun 2022 | 1668 20th Av | Axis Construction | remove replace approx 9 sqft stucco at roof/ wall connection including new gsm flashing and waterproofing. replacement is like for like. not visible from streetDetails
remove replace approx 9 sqft stucco at roof/ wall connection including new gsm flashing and waterproofing. replacement is like for like. not visible from street | $8,000 |
| May 2, 2022 | Completed final sign-off Sep 2022 | 2875 21st St | Axis Construction | water proofing & repairs. remove & replace approx. 200 sqft stucco around (4) existing windows; remove and re-install the windows, including new sgm head and pan flashings and new waterproofing. not visible from street.Details
water proofing & repairs. remove & replace approx. 200 sqft stucco around (4) existing windows; remove and re-install the windows, including new sgm head and pan flashings and new waterproofing. not visible from street. | $16,194 |
| Apr 25, 2022 | Completed final sign-off May 2022 | 317 Harriet St | Axis Construction | remove & replace ~40 sf stucco between upper glass wall & sliding glass door. install waterproof membrane & gsm flushing. paint addected areas. not visible from street.Details
remove & replace ~40 sf stucco between upper glass wall & sliding glass door. install waterproof membrane & gsm flushing. paint addected areas. not visible from street. | $11,976 |
| Apr 25, 2022 | Completed final sign-off Feb 2023 | 2919 Pacific Av | Axis Construction | #10: hall bathroom repairs & replace shower. remove toilet & vanity. replace shower pan, surround & door, floor cover, paint. washer / dryer: relocate water supply in hallway. repair fan. new drywall. master bathroom: repairs/ replace tub/shower . new shower surround, tub & tile. reconf plumbing.Details
#10: hall bathroom repairs & replace shower. remove toilet & vanity. replace shower pan, surround & door, floor cover, paint. washer / dryer: relocate water supply in hallway. repair fan. new drywall. master bathroom: repairs/ replace tub/shower . new shower surround, tub & tile. reconf plumbing. | $47,671 |
| Apr 19, 2022 | Completed final sign-off Sep 2022 | 1440 Broadway | Axis Construction | unit #306: remove (e) bathrub. remove & replace tile adjacent to bathtub. re-install (e) bathtub with appropriate components at same location. replacement is like for like.Details
unit #306: remove (e) bathrub. remove & replace tile adjacent to bathtub. re-install (e) bathtub with appropriate components at same location. replacement is like for like. | $11,000 |
| Apr 14, 2022 | Completed final sign-off Mar 2023 | 1685 19th Av | Axis Construction | install temporary scaffold; r/r stucco trim at patio door and window and stucco at deck-to-wall tranistion around door; demo approx 54 sqft deck concrete top slab, membrane, sheet metal flashings & plywood substrate; install new blocking, subsrate, sheet metal flashings, door pan, deck drain, deck..Details
install temporary scaffold; r/r stucco trim at patio door and window and stucco at deck-to-wall tranistion around door; demo approx 54 sqft deck concrete top slab, membrane, sheet metal flashings & plywood substrate; install new blocking, subsrate, sheet metal flashings, door pan, deck drain, deck.. | $17,395 |
| Apr 14, 2022 | Completed final sign-off Jul 2022 | 1745 19th Av | Axis Construction | install temporary scaffold; r/r stucco around (5) windows at 3rd fl & rhs catwalk; remove waterproofing and re-install (5) existing windows including new gsm head flashing at (5) windows and gsm flashing at catwalk; new foam trim at (3) windows; repaint to match (e). interior: r/r water damaged...Details
install temporary scaffold; r/r stucco around (5) windows at 3rd fl & rhs catwalk; remove waterproofing and re-install (5) existing windows including new gsm head flashing at (5) windows and gsm flashing at catwalk; new foam trim at (3) windows; repaint to match (e). interior: r/r water damaged... | $21,274 |
| Feb 24, 2022 | Never finaled issued Feb 2022, no final | 1490 Ocean Av | Axis Construction | to comply with nov 202185594: temporary stabilization of wall tiles -engineer plans & calcs to address nov.Details
to comply with nov 202185594: temporary stabilization of wall tiles -engineer plans & calcs to address nov. | $5,500 |
| Feb 9, 2022 | Completed final sign-off Dec 2023 | 1862 Ellis St | Axis Construction, Universe Alliance Inc Dba Universe Cons | stairs re-construction as per plans.rear of building(like for like) 1 ea.Details
stairs re-construction as per plans.rear of building(like for like) 1 ea. | $61,850 |
| Feb 9, 2022 | Completed final sign-off Dec 2023 | 1977 Ofarrell St | Axis Construction, Universe Alliance Inc Dba Universe Cons | stairs re-construction at rear of building as per plans. 2 ea. like for like.Details
stairs re-construction at rear of building as per plans. 2 ea. like for like. | $61,850 |
| Feb 9, 2022 | Completed final sign-off Jun 2022 | 444 Francisco St | Axis Construction | remove/replace approx 300 sq. ft. (e) siding @ (e) light well, new siding to be cementitious material, paint to match (e). no structural, no change in size or configuration.Details
remove/replace approx 300 sq. ft. (e) siding @ (e) light well, new siding to be cementitious material, paint to match (e). no structural, no change in size or configuration. | $35,000 |
| Jan 26, 2022 | Completed final sign-off Apr 2022 | 1425 Vallejo St | Axis Construction | remove replace approx 22 exisitng (front) stucco surrounding existing window; repair/ replace flashing around existing winodw. paint replacement stucco to match. no structural work. no chnage in size, configuration or appearance.Details
remove replace approx 22 exisitng (front) stucco surrounding existing window; repair/ replace flashing around existing winodw. paint replacement stucco to match. no structural work. no chnage in size, configuration or appearance. | $3,000 |
| Jan 20, 2022 | Completed final sign-off Feb 2022 | 2875 21st St | Axis Construction | remove and replace stucco at affected area 180 sf approx at rear. remove and replace waterproofing/lath. inspect framing conditions. prime/paint to match e color as close as possibleDetails
remove and replace stucco at affected area 180 sf approx at rear. remove and replace waterproofing/lath. inspect framing conditions. prime/paint to match e color as close as possible | $8,000 |
| Dec 20, 2021 | Completed final sign-off May 2022 | 701 Pennsylvania Av | Axis Construction | unit #209 deck. unit #109 deck & common area deck. r/r approx. 12" stucco @ perimeter bottom of wall & @ sliding glass door surround; remove/reinstall (e) slidng glass door; install (n) perimeter flashing; install (n) pan flashing @ sliding glass door; install (n) water proof membrane @ deck floor.Details
unit #209 deck. unit #109 deck & common area deck. r/r approx. 12" stucco @ perimeter bottom of wall & @ sliding glass door surround; remove/reinstall (e) slidng glass door; install (n) perimeter flashing; install (n) pan flashing @ sliding glass door; install (n) water proof membrane @ deck floor. | $43,295 |
| Dec 7, 2021 | Completed final sign-off Jun 2023 | 2363 Larkin St | Axis Construction | remove & replace (e) siding & windows within lightwell. install waterproofing for windows. replace windows with vinyl windows in-kind. replace siding with (n) cementitious siding like-for-like. all work not visible from street.Details
remove & replace (e) siding & windows within lightwell. install waterproofing for windows. replace windows with vinyl windows in-kind. replace siding with (n) cementitious siding like-for-like. all work not visible from street. | $60,000 |
| Sep 21, 2021 | Completed final sign-off Nov 2021 | 201 Folsom St | Axis Construction | exploratory search and observation. work is non-structural in nature. water testing to determine if water leaks or not at exterior facades and roofs.Details
exploratory search and observation. work is non-structural in nature. water testing to determine if water leaks or not at exterior facades and roofs. | $30,000 |
| Sep 1, 2021 | Completed final sign-off Aug 2024 | 35 Dolores St | Axis Construction | remove and replace gsm and sam flashing at e roof parapet caps, reglets and couner flashing at various locations. remove/repl tpo roof cover at roof drains,scuppers various ocatoins. r/r flashing, building wrap/sealant at ex wall penetrations,windows,ext doors, belly band, siding, deck gutters,ventiDetails
remove and replace gsm and sam flashing at e roof parapet caps, reglets and couner flashing at various locations. remove/repl tpo roof cover at roof drains,scuppers various ocatoins. r/r flashing, building wrap/sealant at ex wall penetrations,windows,ext doors, belly band, siding, deck gutters,venti | $1,200,000 |
| Jul 6, 2021 | Completed final sign-off Dec 2022 | 557 Fillmore St | Axis Construction | rot and structural repairs please see attached drawings and calcs. reference 2020102774Details
rot and structural repairs please see attached drawings and calcs. reference 2020102774 | $196,000 |
| Jul 1, 2021 | Completed final sign-off Apr 2022 | 35 Dolores St | Axis Construction | unit 206: move interior door and wall to create bike room. remove and replace upper and lower kitchen cabinet. add build in cabinetry.Details
unit 206: move interior door and wall to create bike room. remove and replace upper and lower kitchen cabinet. add build in cabinetry. | $110,000 |
| Jun 9, 2021 | Completed final sign-off Jul 2021 | 1200 Clayton St | Axis Construction | inspector's revision request per engineer's drawings. dryrot repairs at entrance door's framing. ref pa 202101192886.Details
inspector's revision request per engineer's drawings. dryrot repairs at entrance door's framing. ref pa 202101192886. | $3,000 |
| May 12, 2021 | Completed final sign-off Sep 2021 | 3045 Jackson St | Axis Construction | 2 exsting steel beams, ~ 32 lf each. clean beams, seal walls at beam penetratlons, prep prime and paint beams.Details
2 exsting steel beams, ~ 32 lf each. clean beams, seal walls at beam penetratlons, prep prime and paint beams. | $22,166 |
| May 10, 2021 | Completed final sign-off Jul 2021 | 3045 Jackson St | Axis Construction | replace in kind 99 sqft of stucco in garage ceiling.Details
replace in kind 99 sqft of stucco in garage ceiling. | $2,300 |
| Apr 1, 2021 | Completed final sign-off May 2021 | 101 Valencia St | Axis Construction | attach ridgid 6" flex line to existing (35) range ducts. terminate through doghouse walls. r&r stucco approx 140 sf. install water proofing flashing at all 35 area's and instal 35 6" wall ducts for proper ventilation to match existing & paint all previous surfaces.Details
attach ridgid 6" flex line to existing (35) range ducts. terminate through doghouse walls. r&r stucco approx 140 sf. install water proofing flashing at all 35 area's and instal 35 6" wall ducts for proper ventilation to match existing & paint all previous surfaces. | $25,538 |
| Mar 5, 2021 | Completed final sign-off Sep 2021 | 3045 Jackson St | Axis Construction, Pete Moffat Construction Inc | repair master bath and hallway due to water damage. no exterior work. no walls changed. repair floor finish.Details
repair master bath and hallway due to water damage. no exterior work. no walls changed. repair floor finish. | $20,000 |
| Mar 1, 2021 | Completed final sign-off May 2022 | 1326 Scott St | Axis Construction | retaining wall/fence replacement. demo ~25 lf of concrete retaining wall & wood fence. install & dowel in (n) rebar for (n) footing & retaining wall. set dowels in epoxy. pour concrete retaining wall to resemble (e) as close as possible. install (n) pt wood fence.Details
retaining wall/fence replacement. demo ~25 lf of concrete retaining wall & wood fence. install & dowel in (n) rebar for (n) footing & retaining wall. set dowels in epoxy. pour concrete retaining wall to resemble (e) as close as possible. install (n) pt wood fence. | $15,000 |
| Feb 26, 2021 | Completed final sign-off Jan 2023 | 2295 Vallejo St | Axis Construction | revision to app#202007310964. replacement of existing damaged structural members at elevated walkway.Details
revision to app#202007310964. replacement of existing damaged structural members at elevated walkway. | $450,000 |
| Jan 19, 2021 | Completed final sign-off Jul 2021 | 1200 Clayton St | Axis Construction | all work to be like for like, install temporary dust protection inside unit, remove & reset interior/exterior moulding around the door. contain & remove approx 6" of stucco around the exterior of the door. remove existing door & replace with new door, patch stucco, prime and paintto match existing.Details
all work to be like for like, install temporary dust protection inside unit, remove & reset interior/exterior moulding around the door. contain & remove approx 6" of stucco around the exterior of the door. remove existing door & replace with new door, patch stucco, prime and paintto match existing. | $2,000 |
| Jan 19, 2021 | Completed final sign-off Feb 2021 | 317 Harriet St | Axis Construction | suite #17:all work to be like for like. cut existing drywall for square edge & staggered layer of drywall. install 80 sq ft of new insulation at open area. install 80 sq ft of new double drywall, fire tape & float for smooth finish. prime & paint to match existing color. reset light fixturesDetails
suite #17:all work to be like for like. cut existing drywall for square edge & staggered layer of drywall. install 80 sq ft of new insulation at open area. install 80 sq ft of new double drywall, fire tape & float for smooth finish. prime & paint to match existing color. reset light fixtures | $2,500 |
| Jan 5, 2021 | Expired or cancelled cancelled Jan 2026 | 66 Cleary Ct | Axis Construction | remove (e) fence ~42 lf with same style fence with new brown tone pressure treated wood. 4x6 pt post (10), 4x8 pt top cap 42 lf, 2x4 pt ~ 126lf, 2x2 redwood con-heart pickets 140 pieces. (6) 4x6 post braces.Details
remove (e) fence ~42 lf with same style fence with new brown tone pressure treated wood. 4x6 pt post (10), 4x8 pt top cap 42 lf, 2x4 pt ~ 126lf, 2x2 redwood con-heart pickets 140 pieces. (6) 4x6 post braces. | $9,000 |
| Dec 4, 2020 | Completed final sign-off Jul 2024 | 1189 Tennessee St | Axis Construction | unit#102: remove and replace existing radiant heat floor. topping slab (non structural)to complete repairs and water proofing. repair in kind.Details
unit#102: remove and replace existing radiant heat floor. topping slab (non structural)to complete repairs and water proofing. repair in kind. | $20,000 |
| Nov 25, 2020 | Completed final sign-off Dec 2020 | 396 Faxon Av | Axis Construction | demo approx 60 sf of stucco around window. remove 2x4 window. install (n) gsm falsing for proper waterproof installation. reinstall 2x4 window. apply (n) coat stucco. prime & paint to match (e). any affected area will be replaced like for like. not visible from streetDetails
demo approx 60 sf of stucco around window. remove 2x4 window. install (n) gsm falsing for proper waterproof installation. reinstall 2x4 window. apply (n) coat stucco. prime & paint to match (e). any affected area will be replaced like for like. not visible from street | $5,000 |
| Nov 21, 2020 | Never finaled issued Mar 2021, no final | 66 Cleary Ct | Axis Construction | create new door entry opening in main lobby into office. remove approx 48sf on both sides of wall in lobby wall & office wall for new opening. remove 3 non-load barring 2"x2" hollow core metal studs. reframe opening to accomadate a 3.0x6.8 flush panel entry door. install entry door.Details
create new door entry opening in main lobby into office. remove approx 48sf on both sides of wall in lobby wall & office wall for new opening. remove 3 non-load barring 2"x2" hollow core metal studs. reframe opening to accomadate a 3.0x6.8 flush panel entry door. install entry door. | $2,000 |