Block 0728, lot 120
1804 Ellis St
- City’s use
- Single Family Residential
- Built
- 1986
- Units
- 1
- Rooms
- 2 bedrooms, 1 bathroom
- Building
- 875 sq ft
- Zoning
- RM3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 13, 2025 | Completed final sign-off Sep 2026 | 1804 Ellis St | Axis Construction | partial repairs to ext bldg envelope, as-needed basis, replace (e) wood siding w? james hardie cementitious siding to resemble (e) & other voluntary repairs. rr windows within (e) framed openings, rr & repair (e) trellis, bldg materials will be replaced inkind. repaint bldg to (e) color. common areaDetails
partial repairs to ext bldg envelope, as-needed basis, replace (e) wood siding w? james hardie cementitious siding to resemble (e) & other voluntary repairs. rr windows within (e) framed openings, rr & repair (e) trellis, bldg materials will be replaced inkind. repaint bldg to (e) color. common area | $110,438 |
| Oct 10, 2023 | Completed final sign-off Nov 2023 | 1804 Ellis St | Axis Construction | exterior railing and landing repairs: on extg railings and landings. r/r selective surface boards, top rail/cap, fascia, railing post, prime and paint to resemble extg. replacement is like for like. not visible from street. less then 50%. work on common area.Details
exterior railing and landing repairs: on extg railings and landings. r/r selective surface boards, top rail/cap, fascia, railing post, prime and paint to resemble extg. replacement is like for like. not visible from street. less then 50%. work on common area. | $2,154 |
| May 26, 2023 | Completed final sign-off Nov 2023 | 1804 Ellis St | Axis Construction | work to the (e) stairway to remove and replace damaged/dry rot structure framing members per engineers plans. work is all like-for-like with no change in size or appearance and envelope.Details
work to the (e) stairway to remove and replace damaged/dry rot structure framing members per engineers plans. work is all like-for-like with no change in size or appearance and envelope. | $59,715 |
| Sep 20, 2019 | Never finaled issued Sep 2019, no final | 1804 Ellis St | Axis Construction | revision to app#201905100346. local shearwall analysis at east elevation due to dry rot repair. n/a for maherDetails
revision to app#201905100346. local shearwall analysis at east elevation due to dry rot repair. n/a for maher | $15,000 |
| May 10, 2019 | Completed final sign-off Oct 2019 | 1804 Ellis St | Axis Construction | siding and trim repairs: remove and replace 1510 sf of james hardi plank siding and 1510 sf of dens glass gold and 220 sf of trim. all like for like. paint to match existing color. common areaDetails
siding and trim repairs: remove and replace 1510 sf of james hardi plank siding and 1510 sf of dens glass gold and 220 sf of trim. all like for like. paint to match existing color. common area | $47,800 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.