Adam Biton
- Listed as
- authorized agent-others, contractor, designer
- Firm
- Green Group Remodeling Inc
- Based in
- Concord
- On San Francisco permits
- Mar 2020 to Sep 2026
96 permits since 2000 (contractor on 96 permits, authorized agent-others on 2 permits, designer on 1 permit): 69 completed, 12 in progress, 8 never finaled, 7 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 22, 2026 | In progress issued Sep 2026 | 4023 Folsom St | Green Group Remodeling Inc | revision to 202609097853. underpinning the foundation in specific locationsDetails
revision to 202609097853. underpinning the foundation in specific locations | $3,000 |
| Sep 21, 2026 | In progress issued Sep 2026 | 1011 23rd St | Green Group Remodeling Inc | upper level bathroom partial remodel - convert tub to walk-in shower, upgrade plumbing in shower area only.Details
upper level bathroom partial remodel - convert tub to walk-in shower, upgrade plumbing in shower area only. | $12,000 |
| Sep 9, 2026 | In progress issued Sep 2026 | 4023 Folsom St | Green Group Remodeling Inc | new front stairs, reframe front porch walls and roof.Details
new front stairs, reframe front porch walls and roof. | $10,000 |
| Sep 9, 2026 | In progress issued Sep 2026 | 1955 Eddy St | Green Group Remodeling Inc | bathroom remodel_ full remodel of existing bathroom on upper level(1955 eddy st), including non-structural wall removal to expand shower into adjacent pantry, new walk-in shower, plumbing, electrical, and finishes.Details
bathroom remodel_ full remodel of existing bathroom on upper level(1955 eddy st), including non-structural wall removal to expand shower into adjacent pantry, new walk-in shower, plumbing, electrical, and finishes. | $31,000 |
| Aug 7, 2026 | Completed final sign-off Sep 2026 | 3241 Mission St | Green Group Remodeling Inc | revision to pa # 202606072274 - repair 100% of the patio structure on the 2nd floor. all work in-kind.Details
revision to pa # 202606072274 - repair 100% of the patio structure on the 2nd floor. all work in-kind. | $4,000 |
| Jun 10, 2026 | In progress issued Jun 2026 | 431 Teresita Bl | Green Group Remodeling Inc | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $90,000 |
| Jun 1, 2026 | In progress issued Jun 2026 | 1515 26th Av | Green Group Remodeling Inc | kitchen remodel. demo wall to expand kitchen. remove and replace cabinetry to new design. update mep as needed per code.Details
kitchen remodel. demo wall to expand kitchen. remove and replace cabinetry to new design. update mep as needed per code. | $38,000 |
| Jun 1, 2026 | Completed final sign-off Sep 2026 | 3241 Mission St | Green Group Remodeling Inc | revision to bpa 202605151329: unit 93: more water damage found on outside deck. repair deck less than 50% repair. back of bldgDetails
revision to bpa 202605151329: unit 93: more water damage found on outside deck. repair deck less than 50% repair. back of bldg | $2,000 |
| May 28, 2026 | Completed final sign-off Aug 2026 | 2403 23rd St | Green Group Remodeling Inc | in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $19,000 |
| May 15, 2026 | Completed final sign-off Sep 2026 | 3241 Mission St | Green Group Remodeling Inc | 3rd floor unit# 97 - deck rebuild due to dry-rot/water damage. 2nd floor unit# 93 - ceiling repair due to water damage from unit 97. water damage on the outside deck around the unpermitted skylight above garage - 1st floor.Details
3rd floor unit# 97 - deck rebuild due to dry-rot/water damage. 2nd floor unit# 93 - ceiling repair due to water damage from unit 97. water damage on the outside deck around the unpermitted skylight above garage - 1st floor. | $45,000 |
| May 4, 2026 | In progress issued Jun 2026 | 614 06th Av | Green Group Remodeling Inc | bathroom remodel_full remodel of existing hallway bathroom on third floor, including remodel of non-load bearing wall, cancel tub, install new walk-in shower, relocate toilet and vanity. upgrade plumbing and electrical per code.Details
bathroom remodel_full remodel of existing hallway bathroom on third floor, including remodel of non-load bearing wall, cancel tub, install new walk-in shower, relocate toilet and vanity. upgrade plumbing and electrical per code. | $21,500 |
| Apr 29, 2026 | In progress issued May 2026 | 1915 21st Av | Green Group Remodeling Inc | full remodel of existing bathroom, including adding a half bath. full kitchen remodel includes removal of non-load bearing wall, open a wall and frame new entry-way, relocate sink, hood, 7 range stove, and refrigerator. install new 100 amp subpanel in garage.Details
full remodel of existing bathroom, including adding a half bath. full kitchen remodel includes removal of non-load bearing wall, open a wall and frame new entry-way, relocate sink, hood, 7 range stove, and refrigerator. install new 100 amp subpanel in garage. | $100,000 |
| Apr 16, 2026 | In progress issued Jun 2026 | 4023 Folsom St | Green Group Remodeling Inc | remove existing wood-framed/stucco front stairs and replace with r/f concrete stairs with metal guardrail; remove and replace existing wood landing; all work within existing footprint.Details
remove existing wood-framed/stucco front stairs and replace with r/f concrete stairs with metal guardrail; remove and replace existing wood landing; all work within existing footprint. | $16,000 |
| Apr 16, 2026 | Completed final sign-off Aug 2026 | 2031 42nd Av | Green Group Remodeling Inc | bathroom remodel: full remodel, swap vanity & toilet location. upgrade plumbing & electrical per code; install pocket door;install lighting & moisture sensor fan. kitchen remodel full remodel, remove non-load wall around linen closet, frame to close off door;cancel/cap e gas pipe for stove,Details
bathroom remodel: full remodel, swap vanity & toilet location. upgrade plumbing & electrical per code; install pocket door;install lighting & moisture sensor fan. kitchen remodel full remodel, remove non-load wall around linen closet, frame to close off door;cancel/cap e gas pipe for stove, | $80,000 |
| Apr 16, 2026 | In progress issued Apr 2026 | 4023 Folsom St | Green Group Remodeling Inc | kitchen remodel like for like, main panel upgrade.Details
kitchen remodel like for like, main panel upgrade. | $35,000 |
| Mar 16, 2026 | Completed final sign-off Jul 2026 | 1406 Golden Gate Av | Green Group Remodeling Inc, San Francisco Design Build | legalization of an (e) deck to resolve compliant#: 200988622.Details
legalization of an (e) deck to resolve compliant#: 200988622. | $5,500 |
| Feb 17, 2026 | Completed final sign-off Apr 2026 | 1462 30th Av | Green Group Remodeling Inc | revision to pa # 2025-1217-2084: original like to like. convert walk in shower to tub/shower combo. swap locations of toilet & vanity. no wall construction, no wall demolition, no change in plumbing fixtures.Details
revision to pa # 2025-1217-2084: original like to like. convert walk in shower to tub/shower combo. swap locations of toilet & vanity. no wall construction, no wall demolition, no change in plumbing fixtures. | |
| Dec 30, 2025 | Completed final sign-off Feb 2026 | 441 Laidley St | Green Group Remodeling Inc | in-kind remodeling of 1 bathroom(s) in basement with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in basement with 0 shower pan(s). | $16,978 |
| Dec 17, 2025 | Completed final sign-off Apr 2026 | 1462 30th Av | Green Group Remodeling Inc | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $20,000 |
| Dec 15, 2025 | In progress issued Dec 2025 | 202 Roosevelt Wy | Green Group Remodeling Inc | kitchen remodel-includes removal of load bearing wall. upgrade plumbing and electrical per code. bathroom remodel-3rd level hallway bathroom. upgrade plumbing and electrical per code. window replacement of 4 existing windows. convert window in living room to sliding doors.Details
kitchen remodel-includes removal of load bearing wall. upgrade plumbing and electrical per code. bathroom remodel-3rd level hallway bathroom. upgrade plumbing and electrical per code. window replacement of 4 existing windows. convert window in living room to sliding doors. | $80,000 |
| Dec 10, 2025 | Completed final sign-off Feb 2026 | 1255 Potrero Av | Green Group Remodeling Inc | frame wall to close off area for new half bath on main level. demolish (e) hardwood fl in work area. install new plumbing for sink and toilet per code. install wall mounted toilet. install exhaust fan. install switches and outlets per code. install lighting.Details
frame wall to close off area for new half bath on main level. demolish (e) hardwood fl in work area. install new plumbing for sink and toilet per code. install wall mounted toilet. install exhaust fan. install switches and outlets per code. install lighting. | $20,000 |
| Nov 17, 2025 | Completed final sign-off Jan 2026 | 1140 Silver Av | Green Group Remodeling Inc | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $12,000 |
| Nov 10, 2025 | Completed final sign-off Jan 2026 | 338 Spear St | Green Group Remodeling Inc | unit 16e: master bathroom remodel (no structural changes). - convert bathtub to walk-in shower. redo vanity plumbing to accommodate 2 sinks. upgrade plumbing and electrical per code. install moisture sensor fan.Details
unit 16e: master bathroom remodel (no structural changes). - convert bathtub to walk-in shower. redo vanity plumbing to accommodate 2 sinks. upgrade plumbing and electrical per code. install moisture sensor fan. | $20,000 |
| Oct 28, 2025 | Completed final sign-off Mar 2026 | 154 Stanyan St | Green Group Remodeling Inc | bathroom remodel for full bath, upgrade plumbing and elec per code. relocate vanity toilet. relocate walk in shower to new wet area with free standing tub. cancel pocket door. install new door. install new lighting and moisture sensor fan. (half bath) upgrade plumbing and electrical per code.Details
bathroom remodel for full bath, upgrade plumbing and elec per code. relocate vanity toilet. relocate walk in shower to new wet area with free standing tub. cancel pocket door. install new door. install new lighting and moisture sensor fan. (half bath) upgrade plumbing and electrical per code. | $28,000 |
| Sep 19, 2025 | Completed final sign-off Sep 2025 | 1732 Keith St | Green Group Remodeling Inc | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $7,000 |
| Jul 21, 2025 | Completed final sign-off Aug 2025 | 661 Peralta Av | Green Group Remodeling Inc | reseal existing roof up to 500 sf. prepare south side of building non street visible for siding installation. approx. 1,100 sf. install ply sheeting and waterproof paper 2 layers of tyvek. install flashing. install james hardie siding. repair siding on front and back of building as needed.Details
reseal existing roof up to 500 sf. prepare south side of building non street visible for siding installation. approx. 1,100 sf. install ply sheeting and waterproof paper 2 layers of tyvek. install flashing. install james hardie siding. repair siding on front and back of building as needed. | $25,000 |
| Jul 14, 2025 | Completed final sign-off Sep 2025 | 27 Arnold Av | Green Group Remodeling Inc | garage remodel install insulation and drywall on walls and ceilng (5/8 gyp-x). upgrade plumbing for washer. replace garage door. install car charger. install pocket door in (e) opening to den (4x10 hdr). replace 4 panels of siding on back of home. all work in kind. no wall removal or layout change.Details
garage remodel install insulation and drywall on walls and ceilng (5/8 gyp-x). upgrade plumbing for washer. replace garage door. install car charger. install pocket door in (e) opening to den (4x10 hdr). replace 4 panels of siding on back of home. all work in kind. no wall removal or layout change. | $20,000 |
| Jun 23, 2025 | Completed final sign-off Sep 2025 | 614 06th Av | Green Group Remodeling Inc | in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). | $19,000 |
| Jun 4, 2025 | Completed final sign-off Jul 2025 | 644 Clayton St | Green Group Remodeling Inc | in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $14,000 |
| Apr 29, 2025 | In progress issued Apr 2025 | 1969 Pine St | Green Group Remodeling Inc | in-kind remodeling of 1 kitchen(s) in 1st flDetails
in-kind remodeling of 1 kitchen(s) in 1st fl | $15,000 |
| Mar 20, 2025 | Completed final sign-off Apr 2025 | 1920 Laguna St | Green Group Remodeling Inc | to obtain final inspection for work approved under pa# 202301099895, 202302212344, 202304196028. all work is complete.Details
to obtain final inspection for work approved under pa# 202301099895, 202302212344, 202304196028. all work is complete. | |
| Mar 19, 2025 | Completed final sign-off Apr 2025 | 39 Jersey St | Green Group Remodeling Inc | repair 300 sq ft of siding on south wall not street visibleDetails
repair 300 sq ft of siding on south wall not street visible | $7,000 |
| Oct 11, 2024 | Completed final sign-off Jul 2025 | 619 33rd Av | Green Group Remodeling Inc | demo (e) staircase and landing at backyard. remove (e) door and window at ground floor living room. install new sliding door at ground floor living room. build new staircase and deck at backyard.Details
demo (e) staircase and landing at backyard. remove (e) door and window at ground floor living room. install new sliding door at ground floor living room. build new staircase and deck at backyard. | $7,000 |
| Sep 24, 2024 | Completed final sign-off Dec 2024 | 140 Jerrold Av | Green Group Remodeling Inc | kitchen remodel- demolish pony wall btwn kitchen & living room. cancel door opening into kitchen (frame & drywall). relocate sink. add plumbing for dishwasher. upgrade electrical & plumbing per code. install pendant light over sink. install 4 recessed lights. upgrade subpanelDetails
kitchen remodel- demolish pony wall btwn kitchen & living room. cancel door opening into kitchen (frame & drywall). relocate sink. add plumbing for dishwasher. upgrade electrical & plumbing per code. install pendant light over sink. install 4 recessed lights. upgrade subpanel | $28,000 |
| Sep 17, 2024 | Completed final sign-off Jan 2025 | 101 Lombard St | Green Group Remodeling Inc | unit 515- kitchen remodel like for like no change to layout or wall removal. remove cabinets, countertops appliances and floor upgrade. electrical and plumbing per code. install (n) cabinets, countertops,backsplash, flooring and appliances.Details
unit 515- kitchen remodel like for like no change to layout or wall removal. remove cabinets, countertops appliances and floor upgrade. electrical and plumbing per code. install (n) cabinets, countertops,backsplash, flooring and appliances. | $50,000 |
| Aug 16, 2024 | Completed final sign-off Dec 2024 | 116 Bemis St | Green Group Remodeling Inc | bathroom remodel in kind no layout change. upgrade plumbing per code. convert tub to walk in shower. shower to be same footprint as (e) tub.no change of floor elevation. no change to floor/wall layout. no structural work. replace bath window in kind 35"x33"-not st visible. window to be temperedDetails
bathroom remodel in kind no layout change. upgrade plumbing per code. convert tub to walk in shower. shower to be same footprint as (e) tub.no change of floor elevation. no change to floor/wall layout. no structural work. replace bath window in kind 35"x33"-not st visible. window to be tempered | $17,000 |
| Aug 14, 2024 | Completed final sign-off Oct 2024 | 39 Douglass St | Green Group Remodeling Inc | bathroom remodel - like for like (no change to layout). upgrade plumbing per code. install moisture sensor fan.Details
bathroom remodel - like for like (no change to layout). upgrade plumbing per code. install moisture sensor fan. | $15,000 |
| Jul 16, 2024 | Completed final sign-off Oct 2024 | 39 Jersey St | Green Group Remodeling Inc | revision to no plan pa# 202406114168. demolish and replace additional 1000 sqft of siding.Details
revision to no plan pa# 202406114168. demolish and replace additional 1000 sqft of siding. | $10,000 |
| Jun 11, 2024 | Completed final sign-off Oct 2024 | 39 Jersey St | Green Group Remodeling Inc | replace (e) french door w/ new. demo and replace siding. demo balcony flooring and rewaterproof. repair in like kind. note: all work is on none st side of structure.common area.Details
replace (e) french door w/ new. demo and replace siding. demo balcony flooring and rewaterproof. repair in like kind. note: all work is on none st side of structure.common area. | $50,000 |
| May 17, 2024 | Completed final sign-off Sep 2024 | 140 Pennsylvania Av | Green Group Remodeling Inc | partial master bath remodel: convert tub to walk in shower. upgrade plumbing per code. no change to layout.Details
partial master bath remodel: convert tub to walk in shower. upgrade plumbing per code. no change to layout. | $8,000 |
| Dec 28, 2023 | Expired or cancelled cancelled Jan 2025 | 2889 Cesar Chavez St | Green Group Remodeling Inc | siding repair. remove and replace 1350sf of roofing and repair approx. 20sf of siding (non-street facing). (reroofing pa# 202312283207)Details
siding repair. remove and replace 1350sf of roofing and repair approx. 20sf of siding (non-street facing). (reroofing pa# 202312283207) | $16,000 |
| Dec 28, 2023 | Completed final sign-off Feb 2024 | 2889 Cesar Chavez St | Green Group Remodeling Inc | reroofing (ref siding permit pa# 2023-1228-3195)Details
reroofing (ref siding permit pa# 2023-1228-3195) | $15,000 |
| Nov 28, 2023 | Completed final sign-off Dec 2023 | 881 San Jose Av | Green Group Remodeling Inc | siding removal and replacement - side of the building not facing the street 500-550 ftDetails
siding removal and replacement - side of the building not facing the street 500-550 ft | $25,000 |
| Oct 18, 2023 | Expired or cancelled cancelled Jun 2024 | 2185 Bush St | Green Group Remodeling Inc | bathroom in kind upgrade plumbing and electrical per code no change to layout or floor planDetails
bathroom in kind upgrade plumbing and electrical per code no change to layout or floor plan | $22,000 |
| Jul 11, 2023 | Completed final sign-off Aug 2023 | 242 Red Rock Wy | Green Group Remodeling Inc | unit a: kitchen remodel like for like. upgrade plumbing and electrical per code. no change to layout or floorplan.Details
unit a: kitchen remodel like for like. upgrade plumbing and electrical per code. no change to layout or floorplan. | $35,000 |
| May 22, 2023 | Completed final sign-off Aug 2023 | 4376 21st St | Green Group Remodeling Inc | in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $26,000 |
| Apr 19, 2023 | Expired or cancelled expired Apr 2025 | 1920 Laguna St | Green Group Remodeling Inc | revision of 202301099895; removing new furnance from scope of work. remove the new wood beam from scope of work.Details
revision of 202301099895; removing new furnance from scope of work. remove the new wood beam from scope of work. | |
| Mar 27, 2023 | Completed final sign-off Aug 2023 | 2546 45th Av | Green Group Remodeling Inc | revision to previously approved pa 2022-1222-9043 to add new roof beam and post down to existing foundation.Details
revision to previously approved pa 2022-1222-9043 to add new roof beam and post down to existing foundation. | $2,000 |
| Mar 24, 2023 | Completed final sign-off Jul 2023 | 431 Christopher Dr | Green Group Remodeling Inc | remodel master bath. expand bath approx 2' into bedroom. relocate toilet. add sink, upgrade plumbing and elec. remodel guest bath, like for like. upgrade plumbing and elecDetails
remodel master bath. expand bath approx 2' into bedroom. relocate toilet. add sink, upgrade plumbing and elec. remodel guest bath, like for like. upgrade plumbing and elec | $36,000 |
| Mar 24, 2023 | Completed final sign-off Nov 2023 | 322 22nd Av | Green Group Remodeling Inc | unit 301: remodel 3rd floor primary bathroom, extend bathroom into adjacent bedroom closet by approx 3 feet relocate vanity and toilet. upgrade plumbing and electrical. bathroom located on 3/fDetails
unit 301: remodel 3rd floor primary bathroom, extend bathroom into adjacent bedroom closet by approx 3 feet relocate vanity and toilet. upgrade plumbing and electrical. bathroom located on 3/f | $25,000 |
| Mar 1, 2023 | Completed final sign-off Dec 2024 | 118 Melrose Av | Green Group Remodeling Inc | 2nd fl - interior remodel of kitchen, family room and bathroom on the front of the building; remodeled area is 400 sf. no increase in bldg's sf. remove bearing wall & add new beam.Details
2nd fl - interior remodel of kitchen, family room and bathroom on the front of the building; remodeled area is 400 sf. no increase in bldg's sf. remove bearing wall & add new beam. | $100,000 |
| Feb 21, 2023 | Never finaled issued Feb 2023, no final | 870 North Point St | Green Group Remodeling Inc | unit#: 301; bathroom remodel 1 : full remodel, convert tub to walk in shower, upgrade electrical/plumbing per code. bath 2: full remodel, like for like, upgrade elec plumbingDetails
unit#: 301; bathroom remodel 1 : full remodel, convert tub to walk in shower, upgrade electrical/plumbing per code. bath 2: full remodel, like for like, upgrade elec plumbing | $30,000 |
| Feb 21, 2023 | Expired or cancelled expired Apr 2025 | 1920 Laguna St | Green Group Remodeling Inc | revision to pa# 202301099895, replace rotten wood, replace concrete slab w/ raised wood floor framing, reframe wood stud frame rear wall due to improper framing.Details
revision to pa# 202301099895, replace rotten wood, replace concrete slab w/ raised wood floor framing, reframe wood stud frame rear wall due to improper framing. | $10,000 |
| Feb 21, 2023 | Completed final sign-off Apr 2023 | 150 Page St | Green Group Remodeling Inc | unit#: 404; bath remodel in kind. add fan,Details
unit#: 404; bath remodel in kind. add fan, | $15,000 |
| Jan 26, 2023 | Completed final sign-off Feb 2023 | 2721 Jackson St | Green Group Remodeling Inc | one bathroom remodel like for like. replacing bathtub, wet walls. upgrade plumbing per code.Details
one bathroom remodel like for like. replacing bathtub, wet walls. upgrade plumbing per code. | $13,000 |
| Jan 9, 2023 | Expired or cancelled expired Apr 2025 | 1920 Laguna St | Green Group Remodeling Inc | remodel e kitchen. replace e water heater and furnace. replace and enlarge e windows in kitchen at back, not visible from street. remove wall and add new beam.Details
remodel e kitchen. replace e water heater and furnace. replace and enlarge e windows in kitchen at back, not visible from street. remove wall and add new beam. | $40,000 |
| Dec 22, 2022 | Completed final sign-off Aug 2023 | 2546 45th Av | Green Group Remodeling Inc | kitchen remodel: full remodel kitchen to open concept, upgrade plumbing/electrical per code, close two skylights and open new skylight. reference plans for detailed description.Details
kitchen remodel: full remodel kitchen to open concept, upgrade plumbing/electrical per code, close two skylights and open new skylight. reference plans for detailed description. | $50,000 |
| Aug 22, 2022 | Completed final sign-off Mar 2024 | 66 Cleary Ct | Green Group Remodeling Inc | unit 505: two bathroom remodels. like for like upgrade plumbing/electrical per code and add fan to each bathroom. no structural/wall/framing modificationDetails
unit 505: two bathroom remodels. like for like upgrade plumbing/electrical per code and add fan to each bathroom. no structural/wall/framing modification | $27,000 |
| Apr 7, 2022 | Never finaled issued Apr 2022, no final | 1250 Jones St | Green Group Remodeling Inc | unit #902: remodel kitchen & bathroom. kitchen: relocate stovetop & refrigerator. remove nonload bearing wall. in closet area, block in 2 doorways & remove nonload bearing wall. add lights in living room. bathroom: replace tub with shower. add washer/elec dryer.Details
unit #902: remodel kitchen & bathroom. kitchen: relocate stovetop & refrigerator. remove nonload bearing wall. in closet area, block in 2 doorways & remove nonload bearing wall. add lights in living room. bathroom: replace tub with shower. add washer/elec dryer. | $82,000 |
| Mar 21, 2022 | Completed final sign-off Jun 2022 | 229 Cortland Av | Green Group Remodeling Inc | revision to 202201246508: remodel unit 229 at street level, add resilient ceiling below (e) ceiling for sound-dampening purposes. reconfigure basement partition walls. replace portion of (e) house drain & trap.Details
revision to 202201246508: remodel unit 229 at street level, add resilient ceiling below (e) ceiling for sound-dampening purposes. reconfigure basement partition walls. replace portion of (e) house drain & trap. | $25,000 |
| Mar 18, 2022 | Completed final sign-off Apr 2023 | 725 Tehama St | Green Group Remodeling Inc | remodel like to like: 2 full bathrooms and 1 half bathroom. remodel like to like: kitchen one. upgrade plumbing and electrical to 2019 codes cbccpccec.Details
remodel like to like: 2 full bathrooms and 1 half bathroom. remodel like to like: kitchen one. upgrade plumbing and electrical to 2019 codes cbccpccec. | $50,000 |
| Feb 28, 2022 | Completed final sign-off May 2022 | 312 Edna St | Green Group Remodeling Inc | in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). | $15,000 |
| Jan 24, 2022 | Completed final sign-off Jun 2022 | 229 Cortland Av | Green Group Remodeling Inc | remodel unit 229 at street level, enlarge (e) bathroom and add a new kitchen. at basement, add partition walls, add a new tub to (e) powder room.Details
remodel unit 229 at street level, enlarge (e) bathroom and add a new kitchen. at basement, add partition walls, add a new tub to (e) powder room. | $250,000 |
| Dec 14, 2021 | Completed final sign-off Aug 2022 | 968 Guerrero St | Green Group Remodeling Inc, Moreno Construction | remodel 2nd floor bathroom, convert bathtub to shower. all elese like for like.Details
remodel 2nd floor bathroom, convert bathtub to shower. all elese like for like. | $20,000 |
| Nov 1, 2021 | Completed final sign-off Dec 2022 | 2865 Washington St | Green Group Remodeling Inc | convert laundry room to hall bathroom. remodel master bathroom including relocation of toilet and shower. convert downstairs closet to laundry area.Details
convert laundry room to hall bathroom. remodel master bathroom including relocation of toilet and shower. convert downstairs closet to laundry area. | $72,000 |
| Oct 20, 2021 | Completed final sign-off Nov 2021 | 447 Orizaba Av | Green Group Remodeling Inc | one remodel bathroom like for like. no layout changes. replace plumbing fixtures, electrical gfci, replace tub & new exhaust fan.Details
one remodel bathroom like for like. no layout changes. replace plumbing fixtures, electrical gfci, replace tub & new exhaust fan. | $18,000 |
| Oct 8, 2021 | Completed final sign-off Jul 2023 | 115 Eastwood Dr | Green Group Remodeling Inc | kitchen remodel and add one full bath. rebuild stair to ground level. legalize roofdeck over garage. voluntary structural.Details
kitchen remodel and add one full bath. rebuild stair to ground level. legalize roofdeck over garage. voluntary structural. | $38,000 |
| Aug 24, 2021 | Completed final sign-off Feb 2022 | 1308 Mariposa St | Green Group Remodeling Inc | hallway bathroom and half bathroom remodel. hallway bath: replace and relocate fixtures(toilet and shower), make shower bigger. add lighting. remove extg chase. re-rate plumbig lines. half bath: like for like. add lighting. udate electrical.Details
hallway bathroom and half bathroom remodel. hallway bath: replace and relocate fixtures(toilet and shower), make shower bigger. add lighting. remove extg chase. re-rate plumbig lines. half bath: like for like. add lighting. udate electrical. | $20,000 |
| Aug 20, 2021 | Expired or cancelled cancelled Jan 2023 | 15 Cityview Wy | Green Group Remodeling Inc | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 1 shower pan(s). installing gas line.Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 1 shower pan(s). installing gas line. | $55,000 |
| Aug 10, 2021 | Completed final sign-off Oct 2021 | 65 Idora Av | Green Group Remodeling Inc | convert (e) study room into (n) bedroom and create a (n) closet, remove non-load bearing wall, remove (e) casement window and replace with same site, put egress window into new bedroom, new electrical outlets. non street facing windows.Details
convert (e) study room into (n) bedroom and create a (n) closet, remove non-load bearing wall, remove (e) casement window and replace with same site, put egress window into new bedroom, new electrical outlets. non street facing windows. | $15,000 |
| Jul 6, 2021 | Completed final sign-off Sep 2021 | 935 Filbert St | Green Group Remodeling Inc | demo,remove,and replace (e) kitchen cabinets and counter top. emo wall partition in (e) ktichen/pet area. demo (e) pet area entry door, install 1 new window. remodel 1 back window.Details
demo,remove,and replace (e) kitchen cabinets and counter top. emo wall partition in (e) ktichen/pet area. demo (e) pet area entry door, install 1 new window. remodel 1 back window. | $30,000 |
| Jul 2, 2021 | Completed final sign-off Oct 2021 | 65 Idora Av | Green Group Remodeling Inc | remodeling 2 bathrooms like for like, replace plumbing fixturse, 1 tub,1 shower, 2 toilet, 2 sinks. gfci x4.Details
remodeling 2 bathrooms like for like, replace plumbing fixturse, 1 tub,1 shower, 2 toilet, 2 sinks. gfci x4. | $18,000 |
| Jun 2, 2021 | Completed final sign-off Jul 2022 | 135 12th Av | Green Group Remodeling Inc | kitchen remodeling like for like replace all plumbing fixtures, appliances, update e/m/p up to code.Details
kitchen remodeling like for like replace all plumbing fixtures, appliances, update e/m/p up to code. | $28,000 |
| May 20, 2021 | Completed final sign-off Aug 2021 | 200 Townsend St | Green Group Remodeling Inc | unit 16:replace countertop and cabinets in kitchen; replace floor;wall tiles, (2) bathrooms; replace (1) vanity; replace living space ceiling, lights; replace (1) vanity cabinetDetails
unit 16:replace countertop and cabinets in kitchen; replace floor;wall tiles, (2) bathrooms; replace (1) vanity; replace living space ceiling, lights; replace (1) vanity cabinet | $35,000 |
| May 19, 2021 | Completed final sign-off Dec 2021 | 2715 Pine St | Green Group Remodeling Inc | one kitchen remodel like for like , replace appliances, hood range relocated , replace plumbing fixtures up to code , install gfi/gfci per codeDetails
one kitchen remodel like for like , replace appliances, hood range relocated , replace plumbing fixtures up to code , install gfi/gfci per code | $18,000 |
| May 19, 2021 | Completed final sign-off Dec 2021 | 2717 Pine St | Green Group Remodeling Inc | one kitchen remodeling like for like, replace appliances, hood , range to be replace and relocated, replace all plumbing fixtures.Details
one kitchen remodeling like for like, replace appliances, hood , range to be replace and relocated, replace all plumbing fixtures. | $18,000 |
| May 5, 2021 | Completed final sign-off Aug 2021 | 2945 Lincoln Wy | Green Group Remodeling Inc | kitchen remodel like for like; replace appliances; hood, plumbing fixtures, electrical up to code; bathroom remodeling like for like replace plumbing fixture up code upgrade e/mp.Details
kitchen remodel like for like; replace appliances; hood, plumbing fixtures, electrical up to code; bathroom remodeling like for like replace plumbing fixture up code upgrade e/mp. | $18,000 |
| May 3, 2021 | Completed final sign-off Oct 2021 | 1231 44th Av | Green Group Remodeling Inc | remove closet in living room. enlarge door opening at bedroom closet.Details
remove closet in living room. enlarge door opening at bedroom closet. | $2,500 |
| Mar 18, 2021 | Completed final sign-off Apr 2021 | 785 Golden Gate Av | Green Group Remodeling Inc | full kitchen remodeling like for like. replace plumbing fixtures. add up to 4 recess lights. replace outlets up to code gfci. replace hood in kind.Details
full kitchen remodeling like for like. replace plumbing fixtures. add up to 4 recess lights. replace outlets up to code gfci. replace hood in kind. | $20,000 |
| Mar 15, 2021 | Completed final sign-off May 2021 | 310 Townsend St | Green Group Remodeling Inc | 1 bathroom remodeling like for like,replace plumbing fixtures, upgrade e/m/p up to code.Details
1 bathroom remodeling like for like,replace plumbing fixtures, upgrade e/m/p up to code. | $16,000 |
| Mar 5, 2021 | Completed final sign-off Apr 2021 | 18 Lansing St | Green Group Remodeling Inc | compplete 1 kitchen remodel like for like. no walls or layout change tub to tub shower pan. no new wll & no (e) wall relocation. new lightng shal comply with cec 15.0 (ic) 3Details
compplete 1 kitchen remodel like for like. no walls or layout change tub to tub shower pan. no new wll & no (e) wall relocation. new lightng shal comply with cec 15.0 (ic) 3 | $20,000 |
| Feb 25, 2021 | Completed final sign-off Oct 2024 | 2600 18th St | Green Group Remodeling Inc | unit #23: create new office & small closet within existing master bedroom. create walk-in closet at existing master bedroom. provide new switches & reconnect to existing light switches.Details
unit #23: create new office & small closet within existing master bedroom. create walk-in closet at existing master bedroom. provide new switches & reconnect to existing light switches. | $8,000 |
| Feb 23, 2021 | Completed final sign-off Apr 2021 | 310 Townsend St | Green Group Remodeling Inc | 2 bathroom remodeling likfe for like. 1 tub to tub,1 shower, upgrade subpanel 100-200. upgrade elec/mech/plum up to code.Details
2 bathroom remodeling likfe for like. 1 tub to tub,1 shower, upgrade subpanel 100-200. upgrade elec/mech/plum up to code. | $20,000 |
| Jan 14, 2021 | Completed final sign-off Aug 2021 | 2600 18th St | Green Group Remodeling Inc | unit 23: 2 bathroom remodel like for like replace tub, plumbing fixtures, upgrade e/m/p vpto code, replace fans. 4 r.lDetails
unit 23: 2 bathroom remodel like for like replace tub, plumbing fixtures, upgrade e/m/p vpto code, replace fans. 4 r.l | $18,000 |
| Jan 6, 2021 | Never finaled issued Feb 2021, no final | 4235 Folsom St | Green Group Remodeling Inc | revision to pa# 202012030177: removing interior post. replaceing (e) beam with new composite beam.Details
revision to pa# 202012030177: removing interior post. replaceing (e) beam with new composite beam. | |
| Dec 8, 2020 | Completed final sign-off Feb 2021 | 1177 California St | Green Group Remodeling Inc | complete bathroom remodel like for like tub to shower (shower pan) no walls or layout change , unit #932 onlyDetails
complete bathroom remodel like for like tub to shower (shower pan) no walls or layout change , unit #932 only | $20,000 |
| Dec 3, 2020 | Never finaled issued Dec 2020, no final | 4235 Folsom St | Green Group Remodeling Inc | kitchen remodeling. like for like. upgrade mep up to code. remove support wall by plans and buliding island. replacing bearing wall with post & beam @ kitchen / living room.Details
kitchen remodeling. like for like. upgrade mep up to code. remove support wall by plans and buliding island. replacing bearing wall with post & beam @ kitchen / living room. | $20,000 |
| Nov 24, 2020 | Never finaled issued Nov 2020, no final | 58 Naples St | Green Group Remodeling Inc | re-roofing.Details
re-roofing. | $6,000 |
| Nov 12, 2020 | Never finaled issued Nov 2020, no final | 4235 Folsom St | Green Group Remodeling Inc | bathroom remodeling like for like replacement shower, fan, 2 recess lights, upgrade electrical, plumbing up to code, replace toilet and sink.Details
bathroom remodeling like for like replacement shower, fan, 2 recess lights, upgrade electrical, plumbing up to code, replace toilet and sink. | $15,000 |
| Nov 4, 2020 | Completed final sign-off Mar 2021 | 703 Crescent Av | Green Group Remodeling Inc | complete bathroom remodel like for like. adding 2 recessed lights and exhaust fan, no walls or layout change. 45 sq ft.Details
complete bathroom remodel like for like. adding 2 recessed lights and exhaust fan, no walls or layout change. 45 sq ft. | $20,000 |
| Oct 22, 2020 | Completed final sign-off Mar 2021 | 703 Crescent Av | Green Group Remodeling Inc | add subpanel. add 4 recessed lights. complete kitchen remodel like for like. no layout/wall changesDetails
add subpanel. add 4 recessed lights. complete kitchen remodel like for like. no layout/wall changes | $20,000 |
| Oct 13, 2020 | Completed final sign-off Dec 2020 | 2715 Pine St | Green Group Remodeling Inc | master bath remodel complete (shower pan) 10'x10'. like for like, no layout/wall changeDetails
master bath remodel complete (shower pan) 10'x10'. like for like, no layout/wall change | $20,000 |
| Aug 15, 2020 | Expired or cancelled cancelled Jan 2026 | 601 Van Ness Av | Green Group Remodeling Inc | unit #552: bathroom (~5'x8') remodel like for like- replace tub, toilet, vanity and tile. no change to existing layout or walls.Details
unit #552: bathroom (~5'x8') remodel like for like- replace tub, toilet, vanity and tile. no change to existing layout or walls. | $12,000 |
| Aug 12, 2020 | Never finaled issued Aug 2020, no final | 601 Van Ness Av | Green Group Remodeling Inc | hallway bathroom remodel in-kind. upgrade electrical and plumbing. no structural work.Details
hallway bathroom remodel in-kind. upgrade electrical and plumbing. no structural work. | $10,000 |
| Aug 7, 2020 | Completed final sign-off Oct 2020 | 3446 Clay St | Green Group Remodeling Inc | bathroom remodel in kind. walking shower, toilet, and vanity. adding subpanel.Details
bathroom remodel in kind. walking shower, toilet, and vanity. adding subpanel. | $5,000 |
| Mar 5, 2020 | Never finaled issued Mar 2020, no final | 601 Van Ness Av | Green Group Remodeling Inc | kitchen remodel: cabinet, counter top new appliances, sink and faucet, bathroom remodel: sink, counter, replace toilet bowl, update tub & faucet, replace carpet to hardwood, tile in bathroom and kitchen, patch sheetrock, painting, fix any broken outlet. in kind. same layout remodel n/a maherDetails
kitchen remodel: cabinet, counter top new appliances, sink and faucet, bathroom remodel: sink, counter, replace toilet bowl, update tub & faucet, replace carpet to hardwood, tile in bathroom and kitchen, patch sheetrock, painting, fix any broken outlet. in kind. same layout remodel n/a maher | $20,000 |