Behnam Ashtari Jolehkaran
- Listed as
- authorized agent-others, contractor, designer
- Firm
- Ceap Construction Inc.
- Based in
- Danville
- On San Francisco permits
- Aug 2021 to Sep 2026
7 permits since 2000 (contractor on 7 permits, authorized agent-others on 1 permit, designer on 1 permit): 3 completed, 4 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. Their ranked record as a contractor is on their contractor page. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Engineers
- Hassan Nikzad, Mohamed Mahmoud, Peter Nissen
Where they worked
- Single-family 5
- Multi-family (2-family, apartments) 2
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 28, 2026 | In progress issued Nov 2026 | 1608 Fulton St | Ceap Construction Inc. | install one new 6'x 3' skylight above the shower in the top floor dwelling unit. modify existing roof framing as required. provide nw headers trimmers flashing, water proofing & safety glazing. no change of use, occupancy, footprint, dwelling unit count.Details
install one new 6'x 3' skylight above the shower in the top floor dwelling unit. modify existing roof framing as required. provide nw headers trimmers flashing, water proofing & safety glazing. no change of use, occupancy, footprint, dwelling unit count. | $4,000 |
| Jul 1, 2026 | In progress issued Jul 2026 | 433 Oak Park Dr | Ceap Construction Inc. | revision to permit number 202511240274 to relocate the laundry door and closet door. revise the electrical service for 200a main panel upgrade and add two new wall opening. no other change.Details
revision to permit number 202511240274 to relocate the laundry door and closet door. revise the electrical service for 200a main panel upgrade and add two new wall opening. no other change. | $30,000 |
| Jun 29, 2026 | In progress issued Nov 2026 | 1608 Fulton St | Ceap Construction Inc. | top floor unit: interior renovation to include kitchen relocation, adding one bathroom, installation of a new hvac system, electrical service upgrade, new skylight, insulation improvements, replacement of 5 (e) rear windows with new, like for like. no change to occupancy, bldg height, footprint.Details
top floor unit: interior renovation to include kitchen relocation, adding one bathroom, installation of a new hvac system, electrical service upgrade, new skylight, insulation improvements, replacement of 5 (e) rear windows with new, like for like. no change to occupancy, bldg height, footprint. | $197,000 |
| Dec 15, 2025 | In progress issued Jun 2026 | 433 Oak Park Dr | Ceap Construction Inc. | comply nov#202545166. interior remodel includes kitchen renovation, bathroom remodeling, garage conversion to habitable space, recessed lighting upgrades, replacement of windows, electrical panel upgrade to 125amp. no structural work, no wall removal, no roof modification. legalize 1st flr bathroom.Details
comply nov#202545166. interior remodel includes kitchen renovation, bathroom remodeling, garage conversion to habitable space, recessed lighting upgrades, replacement of windows, electrical panel upgrade to 125amp. no structural work, no wall removal, no roof modification. legalize 1st flr bathroom. | $92,000 |
| Jun 5, 2023 | Completed final sign-off Aug 2023 | 88 Saturn St | Ceap Construction Inc. | adding bathroom at ground level, converting storage area into media room.Details
adding bathroom at ground level, converting storage area into media room. | $35,000 |
| Feb 2, 2022 | Completed final sign-off Apr 2023 | 38 Aztec St | Ceap Construction Inc. | add walls and doorways in garage space to create hallway and add square footage to home. add plumbing in large storage room to create a full bathroom, update electrical in storage room.Details
add walls and doorways in garage space to create hallway and add square footage to home. add plumbing in large storage room to create a full bathroom, update electrical in storage room. | $35,000 |
| Aug 19, 2021 | Completed final sign-off Oct 2021 | 38 Aztec St | Ceap Construction Inc. | remodel kitchen, guest bath and master bath with walls, floor plan with changes to walls and floor plans, reface gas fire place, replace recessed light fixturesDetails
remodel kitchen, guest bath and master bath with walls, floor plan with changes to walls and floor plans, reface gas fire place, replace recessed light fixtures | $40,000 |