Hassan Nikzad
- Listed as
- engineer
- On San Francisco permits
- Aug 2021 to Aug 2021
1 permit since 2000 (engineer on 1 permit): 1 completed.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 19, 2021 | Completed final sign-off Oct 2021 | 38 Aztec St | Ceap Construction Inc. | remodel kitchen, guest bath and master bath with walls, floor plan with changes to walls and floor plans, reface gas fire place, replace recessed light fixturesDetails
remodel kitchen, guest bath and master bath with walls, floor plan with changes to walls and floor plans, reface gas fire place, replace recessed light fixtures | $40,000 |