Mohamed Mahmoud
- Listed as
- architect, engineer
- Firm
- Innodez
- Based in
- Pleasanton
- On San Francisco permits
- Nov 2023 to Aug 2026
10 permits since 2000 (engineer on 8 permits, architect on 2 permits): 5 completed, 5 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 12, 2026 | In progress filed Aug 2026, not yet issued | 1750 Oakdale Av | to erect 3 stories, 1 basement, type v-b, 4 units multi-family building.Details
to erect 3 stories, 1 basement, type v-b, 4 units multi-family building. | $2,050,000 | |
| Jun 29, 2026 | In progress filed Jun 2026, not yet issued | 1608 Fulton St | top floor unit: interior renovation to include kitchen relocation, adding one bathroom, installation of a new hvac system, electrical service upgrade, new skylight, insulation improvements, replacement of 5 (e) rear windows with new, like for like. no change to occupancy, bldg height, footprint.Details
top floor unit: interior renovation to include kitchen relocation, adding one bathroom, installation of a new hvac system, electrical service upgrade, new skylight, insulation improvements, replacement of 5 (e) rear windows with new, like for like. no change to occupancy, bldg height, footprint. | $197,000 | |
| Jun 2, 2026 | In progress filed Jun 2026, not yet issued | 51 06th St | new office ti within existing storefront footprint @ main level and mezzanine level floorDetails
new office ti within existing storefront footprint @ main level and mezzanine level floor | $180,000 | |
| Mar 19, 2026 | Completed final sign-off Jun 2026 | 120 Mason St | Essa's Remodeling | ti of (e) vacant car rental office to (n) cafeDetails
ti of (e) vacant car rental office to (n) cafe | $100,000 |
| Dec 2, 2025 | In progress filed Dec 2025, not yet issued | 410 24th Av | (n) wellness area w/in (e) gym/fitness facility at the main level floor & 784 sq. ft. conditioned area at the basement level floor.Details
(n) wellness area w/in (e) gym/fitness facility at the main level floor & 784 sq. ft. conditioned area at the basement level floor. | $175,000 | |
| Sep 9, 2025 | Completed final sign-off Mar 2026 | 1200 Indiana St | mep for t.i. 202408148679: install new ductwork for hvac systemDetails
mep for t.i. 202408148679: install new ductwork for hvac system | $5,000 | |
| Aug 11, 2025 | Completed final sign-off Feb 2026 | 475 Pine St | Delta Electric & Construction Services I | replace existing type 2 cooking hood with new type 1 hood at (e) restaurant. new kitchen cooking equipment. minor finishes repairs and replacement food service equipment. no structural work. new mechanical, electrical/plumbing (mep) work.Details
replace existing type 2 cooking hood with new type 1 hood at (e) restaurant. new kitchen cooking equipment. minor finishes repairs and replacement food service equipment. no structural work. new mechanical, electrical/plumbing (mep) work. | $25,000 |
| Jun 9, 2025 | Completed final sign-off Dec 2025 | 2113 Union St | Jrm General Constractor Inc | tenant improvement: paint (e) walls, add non bearing partitions, change flooring. no change of use.Details
tenant improvement: paint (e) walls, add non bearing partitions, change flooring. no change of use. | $20,000 |
| Feb 6, 2025 | In progress issued Apr 2025 | 2100 Webster St | Derry Casey Builders Inc | suite 405 on 4/f - creating new non bearing partition walls for reception desk, pre-post op and one operationg room. office includes one accessible all gender toilet. facility includes a medical gas piping system. mep work is included.Details
suite 405 on 4/f - creating new non bearing partition walls for reception desk, pre-post op and one operationg room. office includes one accessible all gender toilet. facility includes a medical gas piping system. mep work is included. | $110,696 |
| Nov 8, 2023 | Completed final sign-off Apr 2025 | 449 Turk St | 4-Mac Construction | (n)898 sqft ti; (n) non-structural finished ceiling. (n) offices staff meeting room, accessble restroom, break room (staff) storage, doors and windows, lighting, electrical fixtures, ductless hvac unit. -tenant improvement 441 turk st (same bldg)Details
(n)898 sqft ti; (n) non-structural finished ceiling. (n) offices staff meeting room, accessble restroom, break room (staff) storage, doors and windows, lighting, electrical fixtures, ductless hvac unit. -tenant improvement 441 turk st (same bldg) | $156,000 |