Anne Torney
- License
- C24583
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- Mithum
- Based in
- San Francisco
- On San Francisco permits
- Aug 2017 to Jul 2018
2 permits since 2000 (architect on 2 permits): 2 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Cahill Const Service Inc, Cahill Contractors Llc., California Solar Integrators Inc., James E Roberts-Obayashi Corporation
- Authorized agents
- Sam Palley
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 2
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 3, 2018 | Completed final sign-off Jun 2024 | 2340 San Jose Av | California Solar Integrators Inc., Cahill Contractors Llc., Cahill Const Service Inc | per ord# 17-02, parallel process, to erect 9 stories, no basement, type i-b, 131 units residential affordable housing project. ** maher: disturbance of at least 50 cu.yd. of soil, to dph **Details
per ord# 17-02, parallel process, to erect 9 stories, no basement, type i-b, 131 units residential affordable housing project. ** maher: disturbance of at least 50 cu.yd. of soil, to dph ** | $55,000,000 |
| Aug 15, 2017 | Completed final sign-off Oct 2018 | 1036 Mission St | James E Roberts-Obayashi Corporation | clarification of the type of dimensions of the access panels at the elevator overun penthouses. revision to pa #201406269523-s2Details
clarification of the type of dimensions of the access panels at the elevator overun penthouses. revision to pa #201406269523-s2 |