Theodore Michael Logan
- Listed as
- architect, authorized agent-others, contractor
- Firm
- Logan Design & Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2000 to Apr 2013
73 permits since 2000 (contractor on 72 permits, architect on 1 permit, authorized agent-others on 1 permit): 47 completed, 9 never finaled, 17 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 19, 2013 | Never finaled issued Apr 2013, no final | 1254 26th Av | Logan Design & Construction | replace existing bath fixtures and tile in existing 3/f bathroom, not adding or removing any walls.Details
replace existing bath fixtures and tile in existing 3/f bathroom, not adding or removing any walls. | $10,000 |
| Oct 19, 2012 | Completed final sign-off Nov 2012 | 240 Richland Av | Logan Design & Construction | remodel bathroom replace in kindDetails
remodel bathroom replace in kind | $4,000 |
| May 24, 2012 | Completed final sign-off Jan 2014 | 200 Pine St | Logan Design & Construction | 8th floor-reconfigure office space on existing floor of office buildingDetails
8th floor-reconfigure office space on existing floor of office building | $30,000 |
| Apr 12, 2012 | Completed final sign-off Jan 2013 | 175 Lundys Ln | Logan Design & Construction | remodel kitchen to include cabients, counters, flooring, appliances, fixtures, plumbing, electrical. remove non-bearing walls in existing interior space current kitchen. all new lighting must comply with cec 150(k)Details
remodel kitchen to include cabients, counters, flooring, appliances, fixtures, plumbing, electrical. remove non-bearing walls in existing interior space current kitchen. all new lighting must comply with cec 150(k) | $50,000 |
| Apr 12, 2012 | Completed final sign-off Jul 2012 | 953 York St | Logan Design & Construction | voluntary lateral strenghthening of existing rear open sunroomDetails
voluntary lateral strenghthening of existing rear open sunroom | $8,000 |
| Feb 10, 2012 | Never finaled issued Feb 2012, no final | 417 Precita Av | Logan Design & Construction | kitchen remodel to the residence at 417 precita ave on 1st floor. walls removed and replace with structure as shown.Details
kitchen remodel to the residence at 417 precita ave on 1st floor. walls removed and replace with structure as shown. | $20,000 |
| Dec 1, 2011 | Completed final sign-off Dec 2011 | 614 Guerrero St | Logan Design & Construction | work for repairs to address pest report 09866 framing by foundation, stairs, exterior work on doors, bay. raise foundation curb from at grade by 6" to reach 6" above grade, install 2-5/8" epoxy anchor bolts along a40" long sill plate with min. 7" embodment in existing concrete.Details
work for repairs to address pest report 09866 framing by foundation, stairs, exterior work on doors, bay. raise foundation curb from at grade by 6" to reach 6" above grade, install 2-5/8" epoxy anchor bolts along a40" long sill plate with min. 7" embodment in existing concrete. | $2,500 |
| Aug 10, 2011 | Completed final sign-off Apr 2012 | 334 Edinburgh St | Logan Design & Construction | renovation of existing kitchenDetails
renovation of existing kitchen | $25,000 |
| Jun 17, 2011 | Completed final sign-off Sep 2011 | 1866 41st Av | Logan Design & Construction | in-kind kitchen and bath replacement. no structural work or wall movement. new cabinets, counters, floors and appliance. enclose extg entry way hall.remove inerior non-bearing wall.Details
in-kind kitchen and bath replacement. no structural work or wall movement. new cabinets, counters, floors and appliance. enclose extg entry way hall.remove inerior non-bearing wall. | $30,000 |
| Apr 27, 2011 | Never finaled issued Apr 2011, no final | 244 Richland Av | Logan Design & Construction | dry rot repair on front facade of side alley & front steps.Details
dry rot repair on front facade of side alley & front steps. | $3,000 |
| Mar 31, 2011 | Completed final sign-off Apr 2011 | 30 Stanford Heights Av | Logan Design & Construction | dry rot repair, replace one deck joist, several deck boards, studs, sheating, shingles, 20 sf. all work in kindDetails
dry rot repair, replace one deck joist, several deck boards, studs, sheating, shingles, 20 sf. all work in kind | $2,000 |
| Mar 31, 2011 | Completed final sign-off Jul 2011 | 1827 Vallejo St | Logan Design & Construction | bathroom remodel to include shower in current closet space new fixtures, cabinetry, flooring, lighting. 3rd floor.Details
bathroom remodel to include shower in current closet space new fixtures, cabinetry, flooring, lighting. 3rd floor. | $15,000 |
| Mar 23, 2011 | Completed final sign-off Mar 2011 | 614 Guerrero St | Logan Design & Construction | dryrot repair on exterior service stair. replace 3 treads, repair stringerDetails
dryrot repair on exterior service stair. replace 3 treads, repair stringer | $400 |
| Dec 16, 2010 | Completed final sign-off Mar 2013 | 3367 21st St | Logan Design & Construction | to comply with nov #201056869. removing extg walls. remove kitchen. reconfigure layout at ground floor adding 2 bathrooms,office. stair work and landing as per plan.Details
to comply with nov #201056869. removing extg walls. remove kitchen. reconfigure layout at ground floor adding 2 bathrooms,office. stair work and landing as per plan. | $140,000 |
| Dec 8, 2010 | Completed final sign-off Mar 2013 | 56 Richland Av | Logan Design & Construction | remodel & rear addition on ground floor. to include new rooms & bath & laundry on ground floor. remodel kitchen on 1st floor with relocated bath & new deck. new stair. garage & parking to remain as configured.Details
remodel & rear addition on ground floor. to include new rooms & bath & laundry on ground floor. remodel kitchen on 1st floor with relocated bath & new deck. new stair. garage & parking to remain as configured. | $50,000 |
| Nov 24, 2010 | Expired or cancelled expired Apr 2022 | 3367 21st St | Logan Design & Construction, Castillo Family Inc Dba Castle Company | repair & legalize (e) deck. fill-in room under (e) 1st dining room. small window addition in front - lower service entrance. in kind repair of stairs leading to lower service entrance. rear facade alterations.Details
repair & legalize (e) deck. fill-in room under (e) 1st dining room. small window addition in front - lower service entrance. in kind repair of stairs leading to lower service entrance. rear facade alterations. | $5,000 |
| Nov 15, 2010 | Completed final sign-off Feb 2011 | 237 Lexington St | Logan Design & Construction | unit #237a-remodel bathroom on 1st floor condoDetails
unit #237a-remodel bathroom on 1st floor condo | $18,000 |
| Oct 29, 2010 | Expired or cancelled cancelled Jan 2011 | 3367 21st St | Logan Design & Construction | correct violation # 201056869Details
correct violation # 201056869 | $5,000 |
| Sep 8, 2010 | Never finaled issued Sep 2012, no final | 3657 Folsom St | Logan Design & Construction | remove existing winder stairs @ rear of house & replace with new deck & stairs. replace low concrete retain wall. replace 1st level porch wall. paint.Details
remove existing winder stairs @ rear of house & replace with new deck & stairs. replace low concrete retain wall. replace 1st level porch wall. paint. | $20,000 |
| Apr 27, 2010 | Completed final sign-off Oct 2010 | 230 Hermann St | Logan Design & Construction | remodeling work in 3rd. floor flat @ 232 hermann st. including; remodeled bath & kitchen, relocate laundry, remove 2-walls & replace w/ new beams.Details
remodeling work in 3rd. floor flat @ 232 hermann st. including; remodeled bath & kitchen, relocate laundry, remove 2-walls & replace w/ new beams. | $40,000 |
| Feb 10, 2010 | Never finaled issued Feb 2010, no final | 155 Evelyn Wy | Logan Design & Construction | revision to application # 200912223693. remove post & beam & repalce with steel beam & new post & figs.Details
revision to application # 200912223693. remove post & beam & repalce with steel beam & new post & figs. | $2,000 |
| Feb 8, 2010 | Completed final sign-off Jul 2010 | 616 Guerrero St | Logan Design & Construction | partial voluntary seismic upgrade; (n) plywood shearwalls, (n) moment frame, (n) foundation for moment frame.Details
partial voluntary seismic upgrade; (n) plywood shearwalls, (n) moment frame, (n) foundation for moment frame. | $25,000 |
| Dec 22, 2009 | Expired or cancelled expired Dec 2012 | 155 Evelyn Wy | Logan Design & Construction | remodel first floor including new bathroom, laundry and new partitiion wall within interior space.Details
remodel first floor including new bathroom, laundry and new partitiion wall within interior space. | $30,000 |
| Jun 8, 2009 | Completed final sign-off Jul 2009 | 3983 20th St | Logan Design & Construction | repair beam @ rear sunroom; new lateral braces for lateral upgrade @ rear with post footing replacement.Details
repair beam @ rear sunroom; new lateral braces for lateral upgrade @ rear with post footing replacement. | $4,000 |
| Apr 3, 2009 | Never finaled issued Apr 2009, no final | 1907 Fillmore St | Logan Design & Construction | t.i. at clinic less than 5, add an additional exam room & office (accessible) on g/f, upgrade p. o. s. to be accessible and meet 20% disproportionate rule. expand (e) mezzanine to within 1/3 of floor area.Details
t.i. at clinic less than 5, add an additional exam room & office (accessible) on g/f, upgrade p. o. s. to be accessible and meet 20% disproportionate rule. expand (e) mezzanine to within 1/3 of floor area. | $62,000 |
| Mar 3, 2009 | Never finaled issued Mar 2009, no final | 294 Liberty St | Logan Design & Construction | replace in kind 6 windows at back of house-same size & location. no st5ructural changes.Details
replace in kind 6 windows at back of house-same size & location. no st5ructural changes. | $4,000 |
| Feb 24, 2009 | Completed final sign-off Mar 2009 | 6 Prospect Av | Logan Design & Construction | to comply with nov# 200727948, item# 2 only. to replace in kind front steps to house. to address correction notice. item# 1 addressed under pa# 2008/12/12/8384. penalty paid under pa# 2008/12/12/8384.Details
to comply with nov# 200727948, item# 2 only. to replace in kind front steps to house. to address correction notice. item# 1 addressed under pa# 2008/12/12/8384. penalty paid under pa# 2008/12/12/8384. | $1,000 |
| Dec 12, 2008 | Completed final sign-off Mar 2009 | 6 Prospect Av | Logan Design & Construction | proposed reconstruction of rear stairs in kind and compliance with notice of violation #200727948Details
proposed reconstruction of rear stairs in kind and compliance with notice of violation #200727948 | $5,000 |
| Oct 14, 2008 | Completed final sign-off Dec 2008 | 2901 Mission St | Logan Design & Construction | renew pa# 2008/04/01/8483 to obtain final inspection only.Details
renew pa# 2008/04/01/8483 to obtain final inspection only. | |
| Sep 17, 2008 | Completed final sign-off Mar 2009 | 8 Prospect Av | Logan Design & Construction | to complete work started under pa#2007/12/18/0670Details
to complete work started under pa#2007/12/18/0670 | $5,001 |
| Aug 15, 2008 | Never finaled issued Aug 2008, no final | 160 Broadmoor Dr | Logan Design & Construction | replace 13 windows in kind wood windows. 4 facing the street.Details
replace 13 windows in kind wood windows. 4 facing the street. | $5,000 |
| Jul 29, 2008 | Completed final sign-off Feb 2009 | 160 Broadmoor Dr | Logan Design & Construction | in kind replacement of master bathroom. all fixtures & windows in same location. 2 windows in bathroom. not visible from street.Details
in kind replacement of master bathroom. all fixtures & windows in same location. 2 windows in bathroom. not visible from street. | $15,715 |
| Jul 28, 2008 | Completed final sign-off Feb 2009 | 160 Broadmoor Dr | Logan Design & Construction | revision to pa# 2007/07/06/6111 to make changes per district inspector's correction notice. show revised framing details for roof deck, revise elevation plans to show all windows and change proposed wood sidding for new addition to stucco.Details
revision to pa# 2007/07/06/6111 to make changes per district inspector's correction notice. show revised framing details for roof deck, revise elevation plans to show all windows and change proposed wood sidding for new addition to stucco. | |
| Jul 1, 2008 | Completed final sign-off Oct 2008 | 1211 Dolores St | Logan Design & Construction | revision to (e) pa# 2008-0610-4079-new window at rear.Details
revision to (e) pa# 2008-0610-4079-new window at rear. | $500 |
| Jun 10, 2008 | Completed final sign-off Oct 2008 | 1211 Dolores St | interior remodel, new stairs (interior) to access storage @ attic & (n) 1/2 bathroom on 2nd floor. (n) dormer, remodel (e) kitchen, remove non-bearing wall @ kitchen area.Details
interior remodel, new stairs (interior) to access storage @ attic & (n) 1/2 bathroom on 2nd floor. (n) dormer, remodel (e) kitchen, remove non-bearing wall @ kitchen area. | $60,000 | |
| Apr 1, 2008 | Completed final sign-off Apr 2008 | 1211 Dolores St | Logan Design & Construction | comply with physical inspection report# 3r-5215.Details
comply with physical inspection report# 3r-5215. | $3,000 |
| Apr 1, 2008 | Expired or cancelled expired Dec 2008 | 2901 Mission St | Logan Design & Construction | renew pa# 2005/08/18/0652 for final inspection only.Details
renew pa# 2005/08/18/0652 for final inspection only. | |
| Dec 18, 2007 | Expired or cancelled expired Feb 2009 | 8 Prospect Av | Logan Design & Construction | demolish ex. non-bearing walls. cut a new opening and install a new spiral staircase that will connect the main level with the lower level. add a shear wall. all work interior, no new glazing.Details
demolish ex. non-bearing walls. cut a new opening and install a new spiral staircase that will connect the main level with the lower level. add a shear wall. all work interior, no new glazing. | $18,000 |
| Nov 5, 2007 | Expired or cancelled expired Jun 2009 | 3983 20th St | Logan Design & Construction | replace garage slab in kind. no increase in height. minumum 3 /12" thick.Details
replace garage slab in kind. no increase in height. minumum 3 /12" thick. | $2,500 |
| Sep 17, 2007 | Expired or cancelled expired May 2008 | 1503 La Salle Av | Logan Design & Construction | replace 3 entry steps with new concrete steps and rampDetails
replace 3 entry steps with new concrete steps and ramp | $5,000 |
| Jul 6, 2007 | Completed final sign-off Feb 2009 | 160 Broadmoor Dr | Logan Design & Construction | additon to the rear of building to extend garage 14' beyond its existing location. garage level will be remodeled to include new full and 1/2 baths and new laundry area.Details
additon to the rear of building to extend garage 14' beyond its existing location. garage level will be remodeled to include new full and 1/2 baths and new laundry area. | $60,000 |
| Apr 30, 2007 | Completed final sign-off May 2007 | 19 Miramar Av | Logan Design & Construction | renew app200503258366 for final inspectionDetails
renew app200503258366 for final inspection | |
| Apr 30, 2007 | Expired or cancelled expired Jan 2010 | 9 Prospect Av | Logan Design & Construction | renew app #200608179737/200607207106/200606204468 for final inspectionDetails
renew app #200608179737/200607207106/200606204468 for final inspection | |
| Apr 30, 2007 | Completed final sign-off May 2007 | 11 Prospect Av | Logan Design & Construction | renew app 200608018159 for final inspectionDetails
renew app 200608018159 for final inspection | |
| Jan 29, 2007 | Completed final sign-off May 2007 | 117 Prospect Av | Logan Design & Construction | replace siding & some framing at garage level with in -kind. approx 50 sq. ft. work @ front, for dry rot repair.Details
replace siding & some framing at garage level with in -kind. approx 50 sq. ft. work @ front, for dry rot repair. | $5,000 |
| Jan 19, 2007 | Completed final sign-off Oct 2007 | 1262 Church St | Logan Design & Construction | remodel kichen, bathroom, and offic . all kwork to be contained in extg bldg envelope. work occurs at lower. 2 story onlyDetails
remodel kichen, bathroom, and offic . all kwork to be contained in extg bldg envelope. work occurs at lower. 2 story only | $40,000 |
| Aug 17, 2006 | Expired or cancelled expired May 2008 | 9 Prospect Av | Logan Design & Construction | (n) 1 hr fire wall along front facade of building to be changed to typical framing because 1 hr wall is not required by building code. revision to app#200607207106.Details
(n) 1 hr fire wall along front facade of building to be changed to typical framing because 1 hr wall is not required by building code. revision to app#200607207106. | |
| Aug 1, 2006 | Completed final sign-off May 2007 | 11 Prospect Av | Logan Design & Construction | replace existing foundatio wall on north side of building, approx 19' 6"Details
replace existing foundatio wall on north side of building, approx 19' 6" | $8,000 |
| Aug 1, 2006 | Completed final sign-off Mar 2007 | 5325 California St | Logan Design & Construction | remodel existing kitchen. n property line window along west wall in kitchen. n slider door to access rear yardDetails
remodel existing kitchen. n property line window along west wall in kitchen. n slider door to access rear yard | $20,000 |
| Jul 20, 2006 | Expired or cancelled expired May 2008 | 9 Prospect Av | Logan Design & Construction | revision to pa#2006/06/20/4468. replace (e) foundation along front wall & portion of north side wall. replace (e) s.o.g. at stair landing. rebuild in kind.Details
revision to pa#2006/06/20/4468. replace (e) foundation along front wall & portion of north side wall. replace (e) s.o.g. at stair landing. rebuild in kind. | $10,000 |
| Jun 20, 2006 | Expired or cancelled expired May 2007 | 9 Prospect Av | Logan Design & Construction | rebuild existing external stairs, move garage door wall back to cantilever (e) bay above, remove (e) front balcony.Details
rebuild existing external stairs, move garage door wall back to cantilever (e) bay above, remove (e) front balcony. | $10,000 |
| Mar 7, 2006 | Completed final sign-off Mar 2007 | 123 Clearfield Dr | Logan Design & Construction | remodel existing kitchen, remodel existing lounge & add full bath on lower level. new stair to conect main level and lower leve.Details
remodel existing kitchen, remodel existing lounge & add full bath on lower level. new stair to conect main level and lower leve. | $40,000 |
| Dec 1, 2005 | Completed final sign-off Jun 2006 | 31 Camp St | Logan Design & Construction | remodel kitchen & bathroom to 6 apartments.new kitchen cabinets in all 6 units.new laundry room/closet in all 6 units.6 electricl washer/dryer in all 6 units.demo/build partitions & add doors to create access to front bedroom (n) & closet.Details
remodel kitchen & bathroom to 6 apartments.new kitchen cabinets in all 6 units.new laundry room/closet in all 6 units.6 electricl washer/dryer in all 6 units.demo/build partitions & add doors to create access to front bedroom (n) & closet. | $78,000 |
| Oct 31, 2005 | Completed final sign-off May 2006 | 31 Camp St | Logan Design & Construction | structural upgrade to ground floor. remove (e) wood posts & beams & replace with steel structural.Details
structural upgrade to ground floor. remove (e) wood posts & beams & replace with steel structural. | $30,000 |
| Aug 15, 2005 | Expired or cancelled expired Jan 2010 | 9 Prospect Av | Logan Design & Construction | retaining wall & particial foundation replacementDetails
retaining wall & particial foundation replacement | $20,000 |
| Aug 12, 2005 | Completed final sign-off Mar 2006 | 186 Granville Wy | Logan Design & Construction | eliminate steel beam over lounge & replace with (e) wood beam.Details
eliminate steel beam over lounge & replace with (e) wood beam. | |
| Jun 22, 2005 | Expired or cancelled expired Sep 2013 | 1541 Filbert St | Logan Design & Construction | remodel kitchen & bathroom, plumbing & electrical work.Details
remodel kitchen & bathroom, plumbing & electrical work. | $60,000 |
| Mar 25, 2005 | Completed final sign-off May 2007 | 19 Miramar Av | Logan Design & Construction | addition to (e)structure including new relocated kitchen,master bedroom,bath,new deck.Details
addition to (e)structure including new relocated kitchen,master bedroom,bath,new deck. | $150,000 |
| Jan 26, 2005 | Never finaled issued Jan 2005, no final | 186 Granville Wy | Logan Design & Construction | remodel 2nd fl kitchen (0 & downstairs den (e) bath & laundry, (e) area. replace wdbeam (e) w/ newDetails
remodel 2nd fl kitchen (0 & downstairs den (e) bath & laundry, (e) area. replace wdbeam (e) w/ new | $100,000 |
| Nov 17, 2004 | Completed final sign-off May 2005 | 1245 16th Av | Logan Design & Construction | remodel kitchen & add bathroom where (e) closet is.Details
remodel kitchen & add bathroom where (e) closet is. | $35,000 |
| Nov 17, 2004 | Completed final sign-off Nov 2004 | 261 Dalewood Wy | Logan Design & Construction | renew pa# 2003/11/13/0085.Details
renew pa# 2003/11/13/0085. | |
| Sep 1, 2004 | Completed final sign-off Oct 2004 | 1541 Filbert St | Logan Design & Construction | kitchen remodel including counters, floors & cabinets. no structural work.Details
kitchen remodel including counters, floors & cabinets. no structural work. | $20,000 |
| Nov 13, 2003 | Completed final sign-off Oct 2004 | 67 Marne Av | Logan Design & Construction | add new master bath & bed on 1st floor/1 additional room and interior stairDetails
add new master bath & bed on 1st floor/1 additional room and interior stair | $30,000 |
| Nov 13, 2003 | Expired or cancelled expired Oct 2009 | 261 Dalewood Wy | Logan Design & Construction | remodel kitchen w/in current perimeter, remove & seal off 1 kitchen windowDetails
remodel kitchen w/in current perimeter, remove & seal off 1 kitchen window | $10,000 |
| Oct 22, 2003 | Expired or cancelled expired Jun 2004 | 9 Prospect Av | Logan Design & Construction | reroofingDetails
reroofing | $2,000 |
| Apr 16, 2003 | Completed final sign-off Dec 2003 | 261 Dalewood Wy | Logan Design & Construction | remodel 1 bath, add 1 bath within existing structure on 2nd floor of building.Details
remodel 1 bath, add 1 bath within existing structure on 2nd floor of building. | $20,000 |
| Oct 28, 2002 | Completed final sign-off Aug 2003 | 298 Juanita Wy | Logan Design & Construction | minor interior remodel with (e)bldg. envelope, legalize basement, add bathroom in same area,Details
minor interior remodel with (e)bldg. envelope, legalize basement, add bathroom in same area, | $100,000 |
| May 22, 2002 | Completed final sign-off Dec 2002 | 4655 18th St | Logan Design & Construction | to renew app#9921603 & reduce scope of work per new plan.Details
to renew app#9921603 & reduce scope of work per new plan. | $15,000 |
| May 15, 2002 | Expired or cancelled expired Jun 2004 | 297 Juanita Wy | Logan Design & Construction | kitchen remodel, master bath remodel. add interior stair, laundry room, & lounge remodel gusep bathDetails
kitchen remodel, master bath remodel. add interior stair, laundry room, & lounge remodel gusep bath | $200,000 |
| Jan 14, 2002 | Completed final sign-off Feb 2003 | 4635 18th St | Logan Design & Construction | correct bldg. & plumbing inspection report #3r-3435 condo converionDetails
correct bldg. & plumbing inspection report #3r-3435 condo converion | $5,000 |
| Jul 24, 2001 | Completed final sign-off Nov 2001 | 2686 23rd Av | Logan Design & Construction | remodel of extg bthrm/rearrange fixturs within extg bthrm wallsDetails
remodel of extg bthrm/rearrange fixturs within extg bthrm walls | $5,000 |
| Jun 20, 2001 | Expired or cancelled expired Oct 2001 | 4655 18th St | Logan Design & Construction | renew extg app #9921603sDetails
renew extg app #9921603s | |
| Jun 9, 2000 | Completed final sign-off Jun 2000 | 730 Pine St | Logan Design & Construction | renew expired appl #9910471Details
renew expired appl #9910471 |