Andrew Chen
- Listed as
- architect
- Firm
- Tectonics Architects
- Based in
- Emeryville
- On San Francisco permits
- Dec 2007 to Jun 2025
8 permits since 2000 (architect on 8 permits): 5 completed, 1 in progress, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 5, 2025 | In progress filed Jun 2025, not yet issued | 728 20th St | work to include replacement of 2 existing sinks w 1 3 comp sink. 1 handwash sink, 1 kitchen sink, 2 floor sinks, 1 grease interceptor. addl work includes in kind replacment of flooring and wall finishes. no change to range, exhaust hood, dishwashers and lightingDetails
work to include replacement of 2 existing sinks w 1 3 comp sink. 1 handwash sink, 1 kitchen sink, 2 floor sinks, 1 grease interceptor. addl work includes in kind replacment of flooring and wall finishes. no change to range, exhaust hood, dishwashers and lighting | $59,743 | |
| May 21, 2020 | Never finaled issued Jul 2020, no final | 851 Tennessee St | Rinaldi Construction | interior remodel of converting three rooms into one classroom, about 711 sq.ft. and turning the staff restroom into a storage room by removing existing plumb. fixtures and caping all plumb. pipes as needed. additional structural support will be provided. mech, plumb & elec modifications included.Details
interior remodel of converting three rooms into one classroom, about 711 sq.ft. and turning the staff restroom into a storage room by removing existing plumb. fixtures and caping all plumb. pipes as needed. additional structural support will be provided. mech, plumb & elec modifications included. | $92,000 |
| Feb 4, 2014 | Completed final sign-off Apr 2014 | 200 Kansas St | Swinerton Builders | revision to appl #2013.0910.6386 -day care center. revise playground area, add sewer connection at vermont street, incorp miscellaneous interior design changes. revised 4'o" ht. metal fence on 24" high concrete wall along driveway back to property line.Details
revision to appl #2013.0910.6386 -day care center. revise playground area, add sewer connection at vermont street, incorp miscellaneous interior design changes. revised 4'o" ht. metal fence on 24" high concrete wall along driveway back to property line. | |
| Nov 13, 2013 | Never finaled issued Dec 2013, no final | 345 Spear St | Bay Area Builders Inc. | gr fl, suite 124: childcare center, demo 1/2 wall, rebuild full height wall to 1/2 height, sheetrock and paint. reelocate 1 light switch if neededDetails
gr fl, suite 124: childcare center, demo 1/2 wall, rebuild full height wall to 1/2 height, sheetrock and paint. reelocate 1 light switch if needed | $10,500 |
| Sep 10, 2013 | Completed final sign-off Apr 2014 | 200 Kansas St | Swinerton Builders | tenant improvement of 1st floor of (e) design warehouse building. construction of a day care center for 126 children.Details
tenant improvement of 1st floor of (e) design warehouse building. construction of a day care center for 126 children. | $1,581,483 |
| Apr 15, 2013 | Completed final sign-off Nov 2014 | 851 Tennessee St | Rinaldi Construction | to erect 1 story educational building.Details
to erect 1 story educational building. | $250,000 |
| Aug 25, 2010 | Completed final sign-off Sep 2010 | 728 20th St | Rinaldi Construction | title 24 re-submittal. ref# pa# 2010.0726.7407 & #2010.0603.3725.Details
title 24 re-submittal. ref# pa# 2010.0726.7407 & #2010.0603.3725. | |
| Dec 31, 2007 | Completed final sign-off Jun 2008 | 303 02nd St | Swinerton Builders | suite #201- change of use from office to child care center. interior ti for activity rooms, offices, restrooms and new kitchen. construct new exterior door and ramp to playground & exterior door replacement.Details
suite #201- change of use from office to child care center. interior ti for activity rooms, offices, restrooms and new kitchen. construct new exterior door and ramp to playground & exterior door replacement. | $1,200,000 |