Gavin Struk
- Listed as
- contractor, designer
- Firm
- Alliance Fire Inc
- Based in
- Oakland
- On San Francisco permits
- May 2012 to Oct 2025
48 permits since 2000 (contractor on 48 permits, designer on 4 permits): 30 completed, 1 in progress, 15 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 17, 2025 | Completed final sign-off Oct 2025 | 324 03rd Av | Alliance Fire Inc | add 4 residential pendant head in new lounge room. pa##202502069809Details
add 4 residential pendant head in new lounge room. pa##202502069809 | $2,500 |
| May 23, 2024 | In progress issued May 2024 | 1390 Oakdale Av | Alliance Fire Inc | ref. pa #202202027138. as built to reflect 1 as shown on plans.Details
ref. pa #202202027138. as built to reflect 1 as shown on plans. | |
| Nov 27, 2023 | Completed final sign-off Oct 2024 | 380 21st Av | Alliance Fire Inc | install underground, backflow prevention and overhead sprinkler system on a renovated 2-story building. ref permit 202311100619Details
install underground, backflow prevention and overhead sprinkler system on a renovated 2-story building. ref permit 202311100619 | $78,000 |
| Oct 19, 2022 | Completed final sign-off Dec 2022 | 499 Alabama St | Alliance Fire Inc | relocate and raise existing pipes @ mezzanine level add 4 pendents heads + one sidewall under mezzanine level.Details
relocate and raise existing pipes @ mezzanine level add 4 pendents heads + one sidewall under mezzanine level. | $3,000 |
| Apr 25, 2022 | Completed final sign-off Jun 2024 | 1390 Oakdale Av | Alliance Fire Inc | combination fire domestic underground water main installation. ref pa# 201907236706. underground only. overhead approved under 202202027138.Details
combination fire domestic underground water main installation. ref pa# 201907236706. underground only. overhead approved under 202202027138. | $4,800 |
| Feb 2, 2022 | Completed final sign-off Jun 2024 | 1390 Oakdale Av | Alliance Fire Inc | new nfpa 13d overhead fire sprinkler system on a 2 story dwelling units. total 27 heads. ref permit 201907236706-s/r1Details
new nfpa 13d overhead fire sprinkler system on a 2 story dwelling units. total 27 heads. ref permit 201907236706-s/r1 | $6,800 |
| Jul 22, 2021 | Completed final sign-off Apr 2022 | 1557 Noe St | Alliance Fire Inc | install new nfpa 13r fire sprinkler system in lower floor and garage. ref pa 201907176166Details
install new nfpa 13r fire sprinkler system in lower floor and garage. ref pa 201907176166 | $14,800 |
| Apr 13, 2021 | Completed final sign-off Aug 2021 | 730 Euclid Av | Alliance Fire Inc | new 13 fire sprinkler system (2015-0329-5028 arch) as-builts to 2018-0814-7234 to reflect a relocated riserDetails
new 13 fire sprinkler system (2015-0329-5028 arch) as-builts to 2018-0814-7234 to reflect a relocated riser | |
| Mar 31, 2021 | Completed final sign-off Jul 2022 | 61 Henry St | Alliance Fire Inc | install new fire sprinkler system throughout all 3 residential units. 55 heads.Details
install new fire sprinkler system throughout all 3 residential units. 55 heads. | $26,000 |
| Dec 15, 2020 | Never finaled issued Apr 2021, no final | 791 San Jose Av | Alliance Fire Inc | provide overhead & underground piping on the ground level of a 3 story building-total 19 sprinkler heads... 2" dedicated underground includedDetails
provide overhead & underground piping on the ground level of a 3 story building-total 19 sprinkler heads... 2" dedicated underground included | |
| Jun 26, 2020 | Completed final sign-off Sep 2022 | 534 Texas St | J M Fire Systems, Alliance Fire Inc | install new overhead & underground fire sprinkler system per nfpa 13 2016 ref pa 2019-1119-7669Details
install new overhead & underground fire sprinkler system per nfpa 13 2016 ref pa 2019-1119-7669 | $12,000 |
| Oct 16, 2019 | Never finaled issued Oct 2019, no final | 1743 46th Av | Alliance Fire Inc | to obtain final inspection for work approved under app#201708215399. all work is complete.Details
to obtain final inspection for work approved under app#201708215399. all work is complete. | |
| Jul 23, 2019 | Never finaled issued Aug 2019, no final | 815 Lyon St | Alliance Fire Inc | install new 2" underground and install 58 fire sprinkler to the entire building. ref pa #201701268022.Details
install new 2" underground and install 58 fire sprinkler to the entire building. ref pa #201701268022. | $29,870 |
| Apr 29, 2019 | Completed final sign-off Aug 2019 | 122 11th Av | Alliance Fire Inc | install new 13r fire sprinkler on 1st flr 1492308 - connect to (e) 2" fire serviceDetails
install new 13r fire sprinkler on 1st flr 1492308 - connect to (e) 2" fire service | $7,800 |
| Feb 5, 2019 | Completed final sign-off Feb 2019 | 829 Oak St | Alliance Fire Inc | as built drawing. ref app#201804237049Details
as built drawing. ref app#201804237049 | |
| Aug 14, 2018 | Completed final sign-off Sep 2023 | 730 Euclid Av | Alliance Fire Inc | new nfpa 13 underground and overhead fire sprinklers ref app#201803295028. maher naDetails
new nfpa 13 underground and overhead fire sprinklers ref app#201803295028. maher na | $21,000 |
| Jun 25, 2018 | Completed final sign-off Apr 2019 | 1 Zoo Rd | Alliance Fire Inc | fires sprinkler overload piping ti ref 201707192300 maher naDetails
fires sprinkler overload piping ti ref 201707192300 maher na | $88,000 |
| Apr 23, 2018 | Completed final sign-off Feb 2019 | 829 Oak St | Alliance Fire Inc | install new nfpa 13 fire sprinkler system. install new 4" water service underground.Details
install new nfpa 13 fire sprinkler system. install new 4" water service underground. | $21,000 |
| Aug 21, 2017 | Completed final sign-off Jan 2020 | 1743 46th Av | Alliance Fire Inc | new nfpa 13 fully sprinklered system for entire building and 2" underground dedicated fire service, copper k brazed piping connecting to 6" cwm on 46th avenue. total 39 sprinklers, demand is 332 gpm @ 49 psi ref app#201309096255Details
new nfpa 13 fully sprinklered system for entire building and 2" underground dedicated fire service, copper k brazed piping connecting to 6" cwm on 46th avenue. total 39 sprinklers, demand is 332 gpm @ 49 psi ref app#201309096255 | $12,000 |
| Jun 26, 2017 | Completed final sign-off Aug 2017 | 3491 20th St | Alliance Fire Inc | add 12 pendent sprinkler heads in new laundry tenant space. ref app#201205080026.Details
add 12 pendent sprinkler heads in new laundry tenant space. ref app#201205080026. | $900 |
| Nov 2, 2016 | Never finaled issued Nov 2016, no final | 343 Liberty St | Alliance Fire Inc | as built drawings for new nfpa 13 fire system & underground. ref pa 2014-0926-7495 & 201601157164.Details
as built drawings for new nfpa 13 fire system & underground. ref pa 2014-0926-7495 & 201601157164. | |
| Jul 11, 2016 | Completed final sign-off Jul 2016 | 149 02nd St | Alliance Fire Inc | ground floor: relocate 14 sprinkler heads. add 6 upright sprinkler heads. ref app#201604053950. n/a for maherDetails
ground floor: relocate 14 sprinkler heads. add 6 upright sprinkler heads. ref app#201604053950. n/a for maher | $5,800 |
| Jun 22, 2016 | Completed final sign-off May 2017 | 382 Texas St | Alliance Fire Inc | underground as built. ref app#201510099306Details
underground as built. ref app#201510099306 | |
| May 23, 2016 | Never finaled issued May 2016, no final | 3491 20th St | Alliance Fire Inc | voluntary fire sprinkler system per nfpa 13 in basement and 1st floor only to oh2 design; connect to extg fire system. completion of this voluntary work will result in full building sprinkler protection.Details
voluntary fire sprinkler system per nfpa 13 in basement and 1st floor only to oh2 design; connect to extg fire system. completion of this voluntary work will result in full building sprinkler protection. | $40,000 |
| Mar 22, 2016 | Never finaled issued May 2016, no final | 2028 Leavenworth St | Alliance Fire Inc | install new overhead and 2" underground fire sprinkler system (56 total heads). ref pa #201410148857r2Details
install new overhead and 2" underground fire sprinkler system (56 total heads). ref pa #201410148857r2 | $14,000 |
| Jan 29, 2016 | Never finaled issued Jan 2016, no final | 1451 Mariposa St | Alliance Fire Inc | install new nfpa 13 fire sprinkler system underground and overhead components. ref app#201302250862-s1Details
install new nfpa 13 fire sprinkler system underground and overhead components. ref app#201302250862-s1 | $14,000 |
| Jan 15, 2016 | Completed final sign-off Oct 2016 | 343 Liberty St | Alliance Fire Inc | install new nfpa 13 fire sprinkler system & underground fire service main. ref pa 2014-0926-7495Details
install new nfpa 13 fire sprinkler system & underground fire service main. ref pa 2014-0926-7495 | $12,000 |
| Nov 24, 2015 | Completed final sign-off Dec 2016 | 51 Bernard St | Alliance Fire Inc | new overhead & undergournd fire sprinkler system new house nfpa13 throughout new house. ref; pa 201410280072.Details
new overhead & undergournd fire sprinkler system new house nfpa13 throughout new house. ref; pa 201410280072. | $14,000 |
| Oct 27, 2015 | Never finaled issued Oct 2015, no final | 1919 Mariposa St | Alliance Fire Inc | install new 2" underground combination fire main. ref app#201402108156Details
install new 2" underground combination fire main. ref app#201402108156 | $1,200 |
| Oct 9, 2015 | Never finaled issued Oct 2015, no final | 410 Pacific Av | Alliance Fire Inc | installation of new fire sprinkler system throughout building per nfpa-13. project includes 4-inch underground. monitoring under separate permit. t.i. app#2015-0929-8338Details
installation of new fire sprinkler system throughout building per nfpa-13. project includes 4-inch underground. monitoring under separate permit. t.i. app#2015-0929-8338 | $14,000 |
| Oct 9, 2015 | Completed final sign-off May 2017 | 382 Texas St | Alliance Fire Inc | installation of new fire sprinkler system in 1,2,3, and roof floor living space and underground piping. 45 heads. t.i. app #201312023086Details
installation of new fire sprinkler system in 1,2,3, and roof floor living space and underground piping. 45 heads. t.i. app #201312023086 | $9,000 |
| Jul 15, 2015 | Never finaled issued Aug 2015, no final | 3491 20th St | Alliance Fire Inc | 4'-0" underground (4")fire main. ref. appl. 2012.0508.0026.Details
4'-0" underground (4")fire main. ref. appl. 2012.0508.0026. | $3,000 |
| Jun 24, 2015 | Expired or cancelled withdrawn Jul 2018 | 760 35th Av | Alliance Fire Inc | remove extg fire sprinkler piping and replace with new per light hazard nfpa13. ref app#200908114584Details
remove extg fire sprinkler piping and replace with new per light hazard nfpa13. ref app#200908114584 | $9,200 |
| May 11, 2015 | Never finaled issued May 2015, no final | 1050 26th St | Alliance Fire Inc | modify of new fire sprinkler coverage below mezzanine. 4 relocate, 4 new, 1 replace. ref app#201411171620.Details
modify of new fire sprinkler coverage below mezzanine. 4 relocate, 4 new, 1 replace. ref app#201411171620. | $5,200 |
| Mar 10, 2015 | Completed final sign-off Apr 2015 | 2200 Jerrold Av | Alliance Fire Inc | unit z: installation & modify of (e) fire sprinkler coverag due to new ceiling 14 (n) sprinkler heads. reference ti 2015.0114.5754 maher - not req'dDetails
unit z: installation & modify of (e) fire sprinkler coverag due to new ceiling 14 (n) sprinkler heads. reference ti 2015.0114.5754 maher - not req'd | $2,000 |
| Feb 24, 2015 | Completed final sign-off Apr 2015 | 74 New Montgomery St | Alliance Fire Inc | unti #214:modify extg fire sprinkler coverage due to new walls and ceiling. relocate 1 sprinkler. remove one extg sprinkler head. ref app#201406138295. n/a for the maher.Details
unti #214:modify extg fire sprinkler coverage due to new walls and ceiling. relocate 1 sprinkler. remove one extg sprinkler head. ref app#201406138295. n/a for the maher. | $900 |
| Nov 25, 2014 | Never finaled issued May 2015, no final | 1919 Mariposa St | Alliance Fire Inc | install new fire sprinkler system--nfpa-13 in garage, nfpa-13r in residence. 32 heads. underground by plumber.Details
install new fire sprinkler system--nfpa-13 in garage, nfpa-13r in residence. 32 heads. underground by plumber. | $11,000 |
| Sep 24, 2014 | Never finaled issued Sep 2014, no final | 1656 Powell St | Alliance Fire Inc | replace 3 sprinkler heads on the 2nd fl. ref app#201408123650Details
replace 3 sprinkler heads on the 2nd fl. ref app#201408123650 | $900 |
| Sep 2, 2014 | Completed final sign-off Nov 2014 | 2200 Jerrold Av | Alliance Fire Inc | suite z:installation and modification to existing fire sprinkler coverage due to new walls and ceiling. 30 new sprinkler headsDetails
suite z:installation and modification to existing fire sprinkler coverage due to new walls and ceiling. 30 new sprinkler heads | $4,800 |
| May 27, 2014 | Completed final sign-off Apr 2015 | 919 Church St | Alliance Fire Inc | installing new fire sprinkler system per nfpa 13. 61 heads total. installing new 2" copper 'k' underground w/2" dedicated fire service. sprinkler monitoring under separate permit. ref app#2012 1221 6781Details
installing new fire sprinkler system per nfpa 13. 61 heads total. installing new 2" copper 'k' underground w/2" dedicated fire service. sprinkler monitoring under separate permit. ref app#2012 1221 6781 | $9,000 |
| May 21, 2014 | Completed final sign-off Jun 2014 | 1146 Castro St | Alliance Fire Inc | sprinkler underground for 13 d sprinkler job under 201309066167. 1 inch comboDetails
sprinkler underground for 13 d sprinkler job under 201309066167. 1 inch combo | $800 |
| May 16, 2014 | Completed final sign-off Jun 2014 | 1496 Minnesota St | Alliance Fire Inc | extend (e) fire sprinkler system under new mezzanine. adding 28 new heads. n/a for the maher ordinance #155-13Details
extend (e) fire sprinkler system under new mezzanine. adding 28 new heads. n/a for the maher ordinance #155-13 | $9,700 |
| Oct 8, 2013 | Completed final sign-off May 2014 | 324 03rd Av | Alliance Fire Inc | install new fire sprinkler system 13r per dbi memo. 45 sprinklers - ug under separate permitDetails
install new fire sprinkler system 13r per dbi memo. 45 sprinklers - ug under separate permit | $8,900 |
| Sep 6, 2013 | Expired or cancelled cancelled Sep 2023 | 161 Henry St | Alliance Fire Inc | remove extg piping and replace with new.Details
remove extg piping and replace with new. | $1,400 |
| Sep 6, 2013 | Never finaled issued Sep 2013, no final | 2342 Market St | Alliance Fire Inc | add one new sprinkler head at entry.Details
add one new sprinkler head at entry. | $800 |
| Sep 6, 2013 | Completed final sign-off Jun 2014 | 1146 Castro St | Alliance Fire Inc | install new 13d fire sprinkler system, single family residence. total of 35 sprinkler heads. underground to be installed by others under a separate permit. pw 20130925642 ref. arch. app# 2012-0719-5186Details
install new 13d fire sprinkler system, single family residence. total of 35 sprinkler heads. underground to be installed by others under a separate permit. pw 20130925642 ref. arch. app# 2012-0719-5186 | $11,000 |
| Apr 4, 2013 | Completed final sign-off May 2014 | 780 Ashbury St | Alliance Fire Inc | sprinkler system-new 13 system in garage, new 13d system throughout property. new 4" u.g main supplyDetails
sprinkler system-new 13 system in garage, new 13d system throughout property. new 4" u.g main supply | $14,000 |
| May 8, 2012 | Never finaled issued Jan 2013, no final | 3491 20th St | Alliance Fire Inc | to comply w/nov dated 200448143, 3-3-04 : new 13 fire sprinkler system, 238 heads on 2nd floor only. underground included. to meet sbo ordinance.Details
to comply w/nov dated 200448143, 3-3-04 : new 13 fire sprinkler system, 238 heads on 2nd floor only. underground included. to meet sbo ordinance. | $24,000 |