Permit GraphShortlistSan Francisco building permits since 2000

Albert Chiang

License
C30026
Architect
About the California Architects Board
Look the license up with the state (Architects Board)
Listed as
architect
Firm
Cac Architects
On San Francisco permits
Apr 2007 to Mar 2017

8 permits since 2000 (architect on 8 permits): 4 completed, 1 never finaled, 3 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
City Building Inc. (3), Dome Construction Corp, Hathaway Dinwiddie Co.

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Mar 13, 2017Expired or cancelled
withdrawn Apr 2017
780 Brannan Strevision to 201607152511 to include flex loading spaces on 1st flr brannan st curb cuts to remain, infill of curbb cut on gilbert st only
Details
Permit
201703131268

revision to 201607152511 to include flex loading spaces on 1st flr brannan st curb cuts to remain, infill of curbb cut on gilbert st only

Open the permit page

Jul 15, 2016Completed
final sign-off Oct 2017
780 Brannan Stchange of use from auto repair to lab. convert 9,700 sq ft of (e) area as permitted under sect 890.52 of the planning code. const. includes new walls, casework, ceiling & finishes w/associated mep scope, scope also includes access compliance
Details
Permit
201607152511
Permit issued
Nov 2, 2016
Final sign-off
Oct 5, 2017

change of use from auto repair to lab. convert 9,700 sq ft of (e) area as permitted under sect 890.52 of the planning code. const. includes new walls, casework, ceiling & finishes w/associated mep scope, scope also includes access compliance

Open the permit page

$673,500
Nov 21, 2014Completed
final sign-off Jun 2015
505 Montgomery StCity Building Inc.24th flr: revisions to permit 201406279859, floor penetration reinforcing.
Details
Permit
201411212285
Permit issued
Nov 26, 2014
Final sign-off
Jun 5, 2015

24th flr: revisions to permit 201406279859, floor penetration reinforcing.

Open the permit page

Nov 7, 2014Completed
final sign-off Feb 2015
505 Montgomery StCity Building Inc.24th flr: revisions to permit 201406279859; per inspector's request the following was clarified, existing wall ratings, proximity to property line, lab noted as new and not existing, wall framing changed from full height to ceiling height, ceiling height details added, hard notes cadded.
Details
Permit
201411070994
Permit issued
Nov 10, 2014
Final sign-off
Feb 27, 2015

24th flr: revisions to permit 201406279859; per inspector's request the following was clarified, existing wall ratings, proximity to property line, lab noted as new and not existing, wall framing changed from full height to ceiling height, ceiling height details added, hard notes cadded.

Open the permit page

Jun 27, 2014Completed
final sign-off Feb 2015
505 Montgomery StCity Building Inc.24th floor. t.i. add small lab less than 470 sq ft. new work includes walls, doors, ceilings, floor finishes and fumehoops. new outlets and lights for electrical, new make up air & exhaust fan for mechanical. new sink for plumbing. n/a for the maher ordinance #155-13
Details
Permit
201406279859
Permit issued
Jul 25, 2014
Final sign-off
Feb 27, 2015

24th floor. t.i. add small lab less than 470 sq ft. new work includes walls, doors, ceilings, floor finishes and fumehoops. new outlets and lights for electrical, new make up air & exhaust fan for mechanical. new sink for plumbing. n/a for the maher ordinance #155-13

Open the permit page

$250,000
Sep 25, 2012Expired or cancelled
expired Nov 2014
185 Berry StHathaway Dinwiddie Co.records documents w/revision to detail to reflect built condition. original scope/permit was to build a mech equipment platform roof over two mech unit, existing revision requested by inspector per hddco. revision to pa# 201111189230
Details
Permit
201209250596
Permit issued
Oct 2, 2012

records documents w/revision to detail to reflect built condition. original scope/permit was to build a mech equipment platform roof over two mech unit, existing revision requested by inspector per hddco. revision to pa# 201111189230

Open the permit page

Jun 22, 2011Never finaled
issued Jul 2011, no final
185 Berry StDome Construction Corpb-occupancy t.i. for ucsf ste 240, remove offices, add furniture & (see letter on a-0.0 from state fire marshal - sffd has no jurisdiction.)
Details
Permit
201106228658
Permit issued
Jul 22, 2011

b-occupancy t.i. for ucsf ste 240, remove offices, add furniture & (see letter on a-0.0 from state fire marshal - sffd has no jurisdiction.)

Open the permit page

$384,000
Apr 13, 2007Expired or cancelled
expired May 2011
2342 21st Avhome remodel. extend into rear yard. change of use from single family residence to 2 units.(revise est. cost again to $500,000 on addendum 1 by vivian hwang)
Details
Permit
200704138717
Permit issued
Apr 9, 2008

home remodel. extend into rear yard. change of use from single family residence to 2 units.(revise est. cost again to $500,000 on addendum 1 by vivian hwang)

Open the permit page

$100,000