Adrian N. Blanco
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Blanco Architecture Inc.
- Based in
- San Rafael
- On San Francisco permits
- Jun 2012 to Aug 2023
15 permits since 2000 (architect on 14 permits, authorized agent-others on 1 permit, engineer on 1 permit): 9 completed, 1 in progress, 1 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 2, 2023 | In progress issued Nov 2025 | 900 Bush St | Saarman Construction,Ltd. | exterior common area renovation for waterproofing, associated hardscape, and associated landscape at existing plaza decks only. (not visible from street) (e) footprint of (e) building to remain no change.Details
exterior common area renovation for waterproofing, associated hardscape, and associated landscape at existing plaza decks only. (not visible from street) (e) footprint of (e) building to remain no change. | $3,000,000 |
| Mar 25, 2022 | Completed final sign-off Feb 2023 | 2006 Washington St | Moroso Construction Inc | basement: replace 5 (e) aluminum windows at managers apt. 1st fl terrace: remove & salvage 3 concrete planters. remove & salvage wrought iron terrace gate. repaid (e) concrete slab at exterior terrace.Details
basement: replace 5 (e) aluminum windows at managers apt. 1st fl terrace: remove & salvage 3 concrete planters. remove & salvage wrought iron terrace gate. repaid (e) concrete slab at exterior terrace. | $40,000 |
| Mar 11, 2022 | Completed final sign-off Nov 2022 | 2006 Washington St | Moroso Construction Inc | managers apartment basement - interior renovation includes new storage remove 1 bath, relocate bedroom, kitchen and bath remodel.Details
managers apartment basement - interior renovation includes new storage remove 1 bath, relocate bedroom, kitchen and bath remodel. | $60,000 |
| Jan 12, 2022 | Completed final sign-off Aug 2024 | 601 Van Ness Av | Centrix Builders Inc. | window replacement work : 3 year program to replace aluminium windows in-kind/like with new elastomeric coating; ext.sealast and replace interior repairs. year 1 of june 2022: west elevation - all 3 towers (108 wdw); year 2: east elev- all 3 towers (115 wdw); year 3-june 2024:north elev. (100 wdw).Details
window replacement work : 3 year program to replace aluminium windows in-kind/like with new elastomeric coating; ext.sealast and replace interior repairs. year 1 of june 2022: west elevation - all 3 towers (108 wdw); year 2: east elev- all 3 towers (115 wdw); year 3-june 2024:north elev. (100 wdw). | $2,148,195 |
| Aug 27, 2021 | Expired or cancelled cancelled Jan 2026 | 8 Russian Hill Pl | Moroso Construction Inc | unit 2: replace (e) railing at terrace. unit 1: replace (e) stair at rear garden.Details
unit 2: replace (e) railing at terrace. unit 1: replace (e) stair at rear garden. | $20,000 |
| Nov 6, 2020 | Completed final sign-off Jul 2021 | 8 Russian Hill Pl | Moroso Construction Inc | revision to pa# 202009103898 - remove wood siding at west property line, install waterproofing and stuccoDetails
revision to pa# 202009103898 - remove wood siding at west property line, install waterproofing and stucco | |
| Jul 21, 2020 | Completed final sign-off Oct 2021 | 601 Van Ness Av | Centrix Builders Inc. | south elevation of (3) towers, levels 3-13: replace (73) (e) aluminum windows in kind visible from street - u<0.58, rshgs<0.41, associated/required touch up work inside units due to window replacement; exterior elastomeric coating & all related caulkingDetails
south elevation of (3) towers, levels 3-13: replace (73) (e) aluminum windows in kind visible from street - u<0.58, rshgs<0.41, associated/required touch up work inside units due to window replacement; exterior elastomeric coating & all related caulking | $485,600 |
| Jul 19, 2017 | Completed final sign-off Oct 2018 | 2320 Hyde St | Upscale Construction Inc. | remove existing wood siding, bldg paper & damaged plywood sheating (as necessary). remove existing windows @ hyde st elevation to be replaced with in-kind. install new wood siding to match existing wood siding (in-kind replacement of siding). paint wood siding to match existing wood siding.Details
remove existing wood siding, bldg paper & damaged plywood sheating (as necessary). remove existing windows @ hyde st elevation to be replaced with in-kind. install new wood siding to match existing wood siding (in-kind replacement of siding). paint wood siding to match existing wood siding. | $28,000 |
| Sep 16, 2014 | Never finaled issued Sep 2014, no final | 314 Walnut St | Kelly Pacific Constr.,Co. | fire repair, damage framing and exterior sheathing, interior gypsum sheathing, roof repair, repair /replace ext. windows not visible from the streetDetails
fire repair, damage framing and exterior sheathing, interior gypsum sheathing, roof repair, repair /replace ext. windows not visible from the street | $60,000 |
| Jul 10, 2014 | Completed final sign-off Sep 2015 | 767 Bryant St | Axis Construction | demo and replace stucco, papaer, metal flashing (north and west wall to waterproof. remove and replace alum windows and sgda (n and w wall, like for like. new sheet metal coping, paint and elastumeric coating of new and old stucco. waterprf foundation wall (w and n wall sidewalk to wall 18" deep.Details
demo and replace stucco, papaer, metal flashing (north and west wall to waterproof. remove and replace alum windows and sgda (n and w wall, like for like. new sheet metal coping, paint and elastumeric coating of new and old stucco. waterprf foundation wall (w and n wall sidewalk to wall 18" deep. | $690,000 |
| Jul 7, 2014 | Expired or cancelled expired May 2016 | 330 02nd Av | Andrew Chekene Enterprises/ Dba Ac Enter | work to be performed in rear of bldg/common area - install new windows & doors, with new flashing, remove & replace deck membrane. remove & replace guardrails. work in common area.Details
work to be performed in rear of bldg/common area - install new windows & doors, with new flashing, remove & replace deck membrane. remove & replace guardrails. work in common area. | $65,000 |
| Apr 30, 2014 | Completed final sign-off Jan 2016 | 330 02nd Av | Andrew Chekene Enterprises/ Dba Ac Enter | remove (e) 4th floor stair that discharges onto 3rd floor deck, build new 4th floor walkway and stair that ties into main rear egress stairDetails
remove (e) 4th floor stair that discharges onto 3rd floor deck, build new 4th floor walkway and stair that ties into main rear egress stair | $20,000 |
| Jan 8, 2014 | Expired or cancelled cancelled Jan 2026 | 330 02nd Av | Andrew Chekene Enterprises/ Dba Ac Enter | install 3 new 45 min fire arated double doors, 1 new window, waterproof rear of building. modify 4th floor stair landing per detaios and install new deck waterproofing per details. common areaDetails
install 3 new 45 min fire arated double doors, 1 new window, waterproof rear of building. modify 4th floor stair landing per detaios and install new deck waterproofing per details. common area | $102,000 |
| Feb 20, 2013 | Completed final sign-off Jul 2014 | 455 Vallejo St | Axis Construction | remove & dispose of (e) wood deck, wood columns & concrete footings. install (n) piers slabs, install (n) pressure treated columns, beams, joists & associated flashing. install (n) redwood decking, install (n) glass & alum post guardrail, pressure treated & wood post w/ cable railings.Details
remove & dispose of (e) wood deck, wood columns & concrete footings. install (n) piers slabs, install (n) pressure treated columns, beams, joists & associated flashing. install (n) redwood decking, install (n) glass & alum post guardrail, pressure treated & wood post w/ cable railings. | $140,000 |
| Jun 22, 2012 | Expired or cancelled cancelled Jan 2026 | 455 Vallejo St | replace skylight per plan. replace exterior windows and sliding glass doors. replace e railing to glass/stainless steel railings. replace partial roofing, paintDetails
replace skylight per plan. replace exterior windows and sliding glass doors. replace e railing to glass/stainless steel railings. replace partial roofing, paint | $70,000 |