Permit 201705267760
600 Stockton St
installation of equipment racks inside existing storage room, includes battery rack with less than 50 gallons of electrolytes. installation of one air conditioning unit. maher ord 155-13 na.
- Outcome
- Completed (city status: complete, Oct 26, 2018)
- Filed
- May 26, 2017
- Permit issued
- Jul 11, 2017
- Final sign-off
- Oct 26, 2018
- Declared cost
- $20,000
- Building use
- tourist hotel/motel
- Neighborhood
- Financial District/South Beach (how long permits take there)
- Contractor
- Mc Millan Electric (license 268179)
- Property
- All permits at this address (block 0257, lot 012)
Everyone on the permit
The parties and license numbers written on the permit, as the city lists them; not a check with any state board. The person who paid the fee and the project contact are not shown.
- Contractor
- Mc Millan Electric (license 268179), applicant
- Authorized agent
- Michael Mcauliffe, Mcmillan Electric (no license listed)
- Designer
- Albert Teng, Delta Groups Engineering Inc. (license C41170)
- Lessee
- At&T Mobility (no license listed)