Back to kitchen remodel contractors
Zotchi Builders
- Based in
- San Francisco
- On San Francisco permits
- Mar 2015 to May 2026
- Last 24 months
- 2 permits filed
9 permits since 2000: 9 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
6 kitchen remodel permits: 6 completed. Typically 0 days from filing to permit and 160 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 8, 2021 | Completed final sign-off May 2022 | 120 Hancock St | kitchen & bathroom remodel like for like. h.e. lighting and per cec 150.0(k)Details
kitchen & bathroom remodel like for like. h.e. lighting and per cec 150.0(k) | $60,000 |
| Mar 5, 2020 | Completed final sign-off Dec 2020 | 3478 22nd St | kitchen, bathroom and laundery remodelDetails
kitchen, bathroom and laundery remodel | $36,700 |
| Aug 8, 2019 | Completed final sign-off Jan 2020 | 250 Corona St | kitchen remodel 19' 8" x 15' 8"- replacing cabinets and countertops. additional recess lights. no wall alterations.Details
kitchen remodel 19' 8" x 15' 8"- replacing cabinets and countertops. additional recess lights. no wall alterations. | $25,000 |
| Jan 8, 2019 | Completed final sign-off Mar 2019 | 2154 15th St | kitchen remodel remove (e) cabinets & replace with new , install recessed lighting in kitchenDetails
kitchen remodel remove (e) cabinets & replace with new , install recessed lighting in kitchen | $22,000 |
| Apr 13, 2018 | Completed final sign-off Sep 2018 | 2152 15th St | 3rd fl unit: kitchen remodel, remove existing cabinets, replace with new. remove existing partition between kitchen and hallway, install new recessed lighting. attic level: bathroom remodel, replace existing wall and floor tile with newDetails
3rd fl unit: kitchen remodel, remove existing cabinets, replace with new. remove existing partition between kitchen and hallway, install new recessed lighting. attic level: bathroom remodel, replace existing wall and floor tile with new | $37,500 |
| Mar 2, 2015 | Completed final sign-off Apr 2015 | 18 Dorado Tr | change kitchen cabinets & countertops. reinstall kitchen sink & faucet, change existing receptacles to gfci - all in the same locationDetails
change kitchen cabinets & countertops. reinstall kitchen sink & faucet, change existing receptacles to gfci - all in the same location | $15,000 |