Back to kitchen remodel contractors
Zooey Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Nov 2000 to Sep 2010
- Last 24 months
- 0 permits filed
30 permits since 2000: 24 completed, 2 never finaled, 4 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
5 kitchen remodel permits: 5 completed. Typically 4 days from filing to permit and 140 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 21, 2010 | Completed final sign-off Dec 2010 | 1551 25th Av | 1)comply with nov #2010068198.2)replace sheetrock at 2nd floor through out. remodel kitchen and 2 bathroomsDetails
1)comply with nov #2010068198.2)replace sheetrock at 2nd floor through out. remodel kitchen and 2 bathrooms | $25,000 |
| Nov 29, 2007 | Completed final sign-off Apr 2008 | 2586 15th Av | remodel (e) bath,add a new bath, convert (e)kitchen to study room, convert(e) den to kitchen, add 2 skylights on 2nd fl, build 2 bedrooms, 2 baths and a family room at ground floor. open upinterior (e)stair from 2nd fl to ground floorDetails
remodel (e) bath,add a new bath, convert (e)kitchen to study room, convert(e) den to kitchen, add 2 skylights on 2nd fl, build 2 bedrooms, 2 baths and a family room at ground floor. open upinterior (e)stair from 2nd fl to ground floor | $35,000 |
| Jan 12, 2005 | Completed final sign-off Jul 2007 | 801 Holloway Av | adding & converting (e) single family residence to 2 unit residence. unit#1 family room on 1st fl., kitchen, dining, living, 2 baths & 3 bedrooms on 2/f. unit 2 on 3/f consists of kitchen, living room, dining room, 2 baths & 2 bedrooms.Details
adding & converting (e) single family residence to 2 unit residence. unit#1 family room on 1st fl., kitchen, dining, living, 2 baths & 3 bedrooms on 2/f. unit 2 on 3/f consists of kitchen, living room, dining room, 2 baths & 2 bedrooms. | $280,000 |
| Nov 16, 2004 | Completed final sign-off Apr 2009 | 1783 32nd Av | horizontal & vertical addition to (e) single family residence & commercial space to convert bldg into a 3 unit residential bldg consists of each unit to have living room, dining room, kitchen, 2 bedrooms, study room and 2 bathrooms. 3 parking spaces are located in the basement.Details
horizontal & vertical addition to (e) single family residence & commercial space to convert bldg into a 3 unit residential bldg consists of each unit to have living room, dining room, kitchen, 2 bedrooms, study room and 2 bathrooms. 3 parking spaces are located in the basement. | $550,000 |
| Oct 29, 2001 | Completed final sign-off Dec 2001 | 251 Vicente St | replace new tile on stair which is infront of house, replace 7 windows on 2nd fl.remodel kitchen....Details
replace new tile on stair which is infront of house, replace 7 windows on 2nd fl.remodel kitchen.... | $10,000 |