Back to kitchen remodel contractors
Zm Builders Inc
- Based in
- San Francisco
- On San Francisco permits
- Jan 2020 to Jul 2026
- Last 24 months
- 16 permits filed
22 permits since 2000: 13 completed, 8 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
8 kitchen remodel permits: 4 completed, 4 in progress. Typically 20 days from filing to permit and 320 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 6, 2026 | In progress issued Jul 2026 | 474 Valley St | revision to bpa: 202411215504 - remove the package door on the 1st floor, reconfigure the kitchen layout on the 3rd floor. add electric fireplace and steam shower room at 3rd floor. reduce size on 2 skylights on the 3rd floor. ref bpa: 202001313281Details
revision to bpa: 202411215504 - remove the package door on the 1st floor, reconfigure the kitchen layout on the 3rd floor. add electric fireplace and steam shower room at 3rd floor. reduce size on 2 skylights on the 3rd floor. ref bpa: 202001313281 | $2,000 |
| Apr 28, 2026 | In progress issued May 2026 | 2026 17th Av | replace heating to radiant heat. upgrade panel to 200a. 2/f: remove rear staircase, infill lightwell (54 sq ft). relocate interior staircase, kitchen and bathroom and add one master bath. 1/f: add 2 bedrooms, 2 bathrooms, and one media room (704 sq ft). refinished front stair.Details
replace heating to radiant heat. upgrade panel to 200a. 2/f: remove rear staircase, infill lightwell (54 sq ft). relocate interior staircase, kitchen and bathroom and add one master bath. 1/f: add 2 bedrooms, 2 bathrooms, and one media room (704 sq ft). refinished front stair. | $150,000 |
| Dec 10, 2025 | In progress issued Feb 2026 | 1378 30th Av | 2nd/f: kitchen & bathroom remodel, add 1 office, 1 master bathroom, relocate stairs. 1st/f: add 2 bedrooms, 2 bathrooms & 1 media room w/wet bar (938 sf), replace heating to radiant heat, upgrade panel to 200 ampDetails
2nd/f: kitchen & bathroom remodel, add 1 office, 1 master bathroom, relocate stairs. 1st/f: add 2 bedrooms, 2 bathrooms & 1 media room w/wet bar (938 sf), replace heating to radiant heat, upgrade panel to 200 amp | $289,158 |
| Oct 1, 2025 | Completed final sign-off Sep 2026 | 2067 20th Av | 2/f: kitchen and bathroom remodel. add (1) master bath, and (1) study room. relocate staircase. 1/f: add (2) beds, (2) baths, (1) media room with wetbar, and (1) laundry room (930 sq.ft) infill lightwell, replace all (e) windows in kind. replace water heater and furnace.Details
2/f: kitchen and bathroom remodel. add (1) master bath, and (1) study room. relocate staircase. 1/f: add (2) beds, (2) baths, (1) media room with wetbar, and (1) laundry room (930 sq.ft) infill lightwell, replace all (e) windows in kind. replace water heater and furnace. | $262,630 |
| Jun 17, 2025 | In progress issued Dec 2025 | 5549 Diamond Heights Bl | 2/f:remodel bathroom, relocate bed, add 1 full bath, office and laundry. 1/f:add great room, pantry and powder.relcoate kitchen from 2/f to 1/f.change front siding to stucco and remove decorative trims.basement: add family & media rooms. infill at rear, replace patio.Details
2/f:remodel bathroom, relocate bed, add 1 full bath, office and laundry. 1/f:add great room, pantry and powder.relcoate kitchen from 2/f to 1/f.change front siding to stucco and remove decorative trims.basement: add family & media rooms. infill at rear, replace patio. | $580,000 |
| Apr 23, 2025 | Completed final sign-off Sep 2025 | 627 16th Av | revision to pa # 2021-0715-4484 add patio at rear. 1st floor relocate landry. 2nd floor resize kitchen island, relocate pantry door, 3rd floor relocate wahser and dryer, conconfigure layout of master bath.Details
revision to pa # 2021-0715-4484 add patio at rear. 1st floor relocate landry. 2nd floor resize kitchen island, relocate pantry door, 3rd floor relocate wahser and dryer, conconfigure layout of master bath. | $8,000 |
| Aug 12, 2024 | Completed final sign-off Aug 2025 | 2015 16th Av | 1/f: add 2 bedrooms, 2 full bath, family and laundry. 2/f: remodel kitchen and bathroom. add 1 full bath and pantry. replace garage door with in-kind (wood). add new patio (less than 30" height) at rear. add new window. replace windows. remove chimneyDetails
1/f: add 2 bedrooms, 2 full bath, family and laundry. 2/f: remodel kitchen and bathroom. add 1 full bath and pantry. replace garage door with in-kind (wood). add new patio (less than 30" height) at rear. add new window. replace windows. remove chimney | $220,000 |
| Jun 12, 2024 | Completed final sign-off May 2025 | 2287 45th Av | 1st fl add 2 bedroom, 2 full bath, laundry and media. 2nd fl remodel kitchen and bath.add 1 bedrm and 1 full bath. infill lightwell. add new patio at rear. replace all windows in kindDetails
1st fl add 2 bedroom, 2 full bath, laundry and media. 2nd fl remodel kitchen and bath.add 1 bedrm and 1 full bath. infill lightwell. add new patio at rear. replace all windows in kind | $220,000 |