Zhuo Zhang
- Based in
- San Francisco
- On San Francisco permits
- Jan 2012 to Feb 2016
- Last 24 months
- 0 permits filed
5 permits since 2000: 5 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 4 days from filing to permit and 212 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 6, 2015 | Completed final sign-off Mar 2016 | 781 Chenery St | interior remodel on kitchen. relocate bath. add plugs and lighting. no addtn sq ft or change in footprint.new sliding doors at (e) opening. move (2) window openings at rear wall to ceiling deckDetails
interior remodel on kitchen. relocate bath. add plugs and lighting. no addtn sq ft or change in footprint.new sliding doors at (e) opening. move (2) window openings at rear wall to ceiling deck | $18,000 |