Zhang's Building Co
- Based in
- Mountain View
- On San Francisco permits
- Aug 2014 to May 2018
- Last 24 months
- 0 permits filed
15 permits since 2000: 12 completed, 3 never finaled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
8 kitchen remodel permits: 7 completed, 1 never finaled. Typically 15 days from filing to permit and 360 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 15, 2017 | Completed final sign-off Sep 2018 | 772 28th Av | the project shall be the remodel and reconfiguration of the upper level unit from 2 bed, 1 bath to 3 bed, 2 baths. the kitchen and living/dining shall be relocated to the rear of the house. addlaundry and master bathroom. upgrade all mechanical, electrical, and plumbing systems. replace front windowDetails
the project shall be the remodel and reconfiguration of the upper level unit from 2 bed, 1 bath to 3 bed, 2 baths. the kitchen and living/dining shall be relocated to the rear of the house. addlaundry and master bathroom. upgrade all mechanical, electrical, and plumbing systems. replace front window | $75,000 |
| Jun 13, 2017 | Completed final sign-off Sep 2018 | 772 28th Av | remodel kitchen, bathroom, upgrade electrical &plumbing. (e) heaters remains. no alteration of wall, window and door.Details
remodel kitchen, bathroom, upgrade electrical &plumbing. (e) heaters remains. no alteration of wall, window and door. | $25,000 |
| May 9, 2017 | Never finaled issued May 2017, no final | 2266 38th Av | remodel kitchen, new sub panel for kitchen, change plumbing fixture, reroute gas line, no change on walls.Details
remodel kitchen, new sub panel for kitchen, change plumbing fixture, reroute gas line, no change on walls. | $10,000 |
| Mar 17, 2017 | Completed final sign-off May 2018 | 1325 San Bruno Av | remodel (e) bathroom and kitchen at ground flr. switch (e) bedroom & living locationDetails
remodel (e) bathroom and kitchen at ground flr. switch (e) bedroom & living location | $30,000 |
| Oct 3, 2016 | Completed final sign-off Oct 2017 | 181 Morningside Dr | remodel kitchen, breakfast & laundry. remodel (e) baths and create (n) walk in closet at master bedroom add new bedroom and new bath at (e) family room on ground floor level with new sliding glass door access to rear yard. upgrade mepDetails
remodel kitchen, breakfast & laundry. remodel (e) baths and create (n) walk in closet at master bedroom add new bedroom and new bath at (e) family room on ground floor level with new sliding glass door access to rear yard. upgrade mep | $87,000 |
| Jul 20, 2016 | Completed final sign-off Sep 2017 | 170 Eastwood Dr | remodel kitchen,3 baths,reconfig. bath & add closet,replace int.stair,repair ext.stair & dryrot per pest report #69086,remove shed & repair pavers, pavement & fence in backyard;relocate laundry washer/dryer to new laundry rm.,replace light fixturesDetails
remodel kitchen,3 baths,reconfig. bath & add closet,replace int.stair,repair ext.stair & dryrot per pest report #69086,remove shed & repair pavers, pavement & fence in backyard;relocate laundry washer/dryer to new laundry rm.,replace light fixtures | $75,000 |
| May 25, 2016 | Completed final sign-off Jan 2017 | 523 07th Av | alterations on 2nd floor incl addition of new laundry rm & rear yard deck & stair. (e0 living rm shall recome a (n) bedroom, (e) dining room shall become a (n) living rm & (e) sunroom shal become a (n) breakfast room; (e) kitchen & bath on 2nd floor shall be demolished & replacedDetails
alterations on 2nd floor incl addition of new laundry rm & rear yard deck & stair. (e0 living rm shall recome a (n) bedroom, (e) dining room shall become a (n) living rm & (e) sunroom shal become a (n) breakfast room; (e) kitchen & bath on 2nd floor shall be demolished & replaced | $10,000 |
| Aug 6, 2014 | Completed final sign-off Apr 2015 | 3326 Wawona St | revision to pa# 201404284369 per plan: relocate existing full bathroom, laundry & add one walk in closet on (e) g/f., revise existing 2 full bathrooms & kitchen on existing 2/f., existing rear deck to remain.Details
revision to pa# 201404284369 per plan: relocate existing full bathroom, laundry & add one walk in closet on (e) g/f., revise existing 2 full bathrooms & kitchen on existing 2/f., existing rear deck to remain. |