Zeus Construction Corp.
- Based in
- Sausalito
- On San Francisco permits
- Sep 2007 to May 2024
- Last 24 months
- 0 permits filed
199 permits since 2000: 144 completed, 2 in progress, 42 never finaled, 11 expired or cancelled.
Of the 42 never-finaled permits, 9 are 3 to 5 years old, 21 are 5 to 10 years old, 12 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
10 stairs permits: 9 completed, 1 expired or cancelled. Typically 1 days from filing to permit and 322 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 19, 2017 | Completed final sign-off Sep 2025 | 2174 20th Av | to legalize an existing illegal second unit per ordinance 43-14. to comply with nov #201791662. install new rear spiral stairs.Details
to legalize an existing illegal second unit per ordinance 43-14. to comply with nov #201791662. install new rear spiral stairs. | |
| Feb 11, 2016 | Completed final sign-off Apr 2017 | 68 Madrone Av | foundation replacement - lowering/replacing slab. (n) internal stair between ground floor and 2nd floor. (e) bath @ 2nd floor will be demolished. adding (n) powder room @ 2nd floor and (n) full bath @ ground floor and 3rd floor. (e) master bath @ 3rd floor to be remodeled. (3) (n) windows and 2 (n)Details
foundation replacement - lowering/replacing slab. (n) internal stair between ground floor and 2nd floor. (e) bath @ 2nd floor will be demolished. adding (n) powder room @ 2nd floor and (n) full bath @ ground floor and 3rd floor. (e) master bath @ 3rd floor to be remodeled. (3) (n) windows and 2 (n) | $150,000 |
| Sep 29, 2015 | Completed final sign-off Sep 2015 | 562 33rd Av | revision to pa 2014 0605 7596: scope of work: remove (e) exterior stair & landing. no other workDetails
revision to pa 2014 0605 7596: scope of work: remove (e) exterior stair & landing. no other work | |
| Jul 21, 2015 | Expired or cancelled withdrawn Sep 2015 | 562 33rd Av | revision to existing permit 201406057596; (e) back stairway to be rebuilt.Details
revision to existing permit 201406057596; (e) back stairway to be rebuilt. | $7,000 |
| Jun 4, 2014 | Completed final sign-off Sep 2016 | 76 Bernal Heights Bl | interior remodel of 2nd floor bathroom, (n) bathroom to lower level, window & door replacement, rear deck & stairs replacement.Details
interior remodel of 2nd floor bathroom, (n) bathroom to lower level, window & door replacement, rear deck & stairs replacement. | $60,000 |
| Apr 11, 2014 | Completed final sign-off May 2014 | 86 Liberty St | exterior stairs to be corrected at rear: new handrail installation, provide max spacing of 4" at gardrails, 42" min. height, less than 50%.Details
exterior stairs to be corrected at rear: new handrail installation, provide max spacing of 4" at gardrails, 42" min. height, less than 50%. | $3,000 |
| Sep 3, 2013 | Completed final sign-off Oct 2016 | 267 Mangels Av | construction a new family room and a new toilet room at level below first floor. remove (e) rotten wood stair @ rear.Details
construction a new family room and a new toilet room at level below first floor. remove (e) rotten wood stair @ rear. | $20,000 |
| Oct 29, 2012 | Completed final sign-off Sep 2013 | 1600 Felton St | interior remodel. demo and remodel of existing kitchen and living areas on the uppper floor. relocate staircase and put additional bath and guest room on lower floor. 1 window relocated to west elevation, 1 removed from north elevationDetails
interior remodel. demo and remodel of existing kitchen and living areas on the uppper floor. relocate staircase and put additional bath and guest room on lower floor. 1 window relocated to west elevation, 1 removed from north elevation | $85,000 |
| Nov 6, 2009 | Completed final sign-off Apr 2011 | 811 Balboa St | revision to 200908134821: replace front stairs, design to be modified, tile stepsDetails
revision to 200908134821: replace front stairs, design to be modified, tile steps | |
| Oct 31, 2008 | Completed final sign-off Apr 2009 | 686 Post St | work @ unit#23,#24,& #33. 3 bathroom to be repaired due to five damege, cosmetic repairs of a stairway, exteiro siding repairs, hallway walls restoration (patching/plastering) 5 new windows in a hallway (replacement(floor 3 & 4) hallway painting.Details
work @ unit#23,#24,& #33. 3 bathroom to be repaired due to five damege, cosmetic repairs of a stairway, exteiro siding repairs, hallway walls restoration (patching/plastering) 5 new windows in a hallway (replacement(floor 3 & 4) hallway painting. | $35,000 |