Zepeda Construction
- Based in
- Santa Rosa
- On San Francisco permits
- Jan 2006 to Apr 2012
- Last 24 months
- 0 permits filed
4 permits since 2000: 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 expired or cancelled. Typically 266 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 19, 2006 | Expired or cancelled expired Jun 2008 | 549 28th St | demolition of rear walls exterior of garage slab at rear excavation at rear yard/new first and second master suite and bedroom floor addition at rear/new basement new rear stairDetails
demolition of rear walls exterior of garage slab at rear excavation at rear yard/new first and second master suite and bedroom floor addition at rear/new basement new rear stair | $120,000 |