Zarin Gollogly Design & Build
- Based in
- San Francisco
- On San Francisco permits
- Mar 2018 to May 2024
- Last 24 months
- 0 permits filed
10 permits since 2000: 8 completed, 1 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
3 deck permits: 3 completed. Typically 18 days from filing to permit and 235 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 1, 2022 | Completed final sign-off Jun 2023 | 58 Waller St | repairs to extg rear of building deck. relocate stairs from upper deck to lower deck. repair to extg upper deck privacy screen/dryrotDetails
repairs to extg rear of building deck. relocate stairs from upper deck to lower deck. repair to extg upper deck privacy screen/dryrot | $15,000 |
| Oct 28, 2022 | Completed final sign-off Nov 2023 | 58 Waller St | revision to existing permit # 202201216360 to reverse beam @ garage (due to obstruction) and reflect dry rot corrections in-kind at kitchen area (toward rear deck).Details
revision to existing permit # 202201216360 to reverse beam @ garage (due to obstruction) and reflect dry rot corrections in-kind at kitchen area (toward rear deck). | $7,500 |
| Mar 26, 2018 | Completed final sign-off Dec 2018 | 320 Alabama St | unit #21 - proposed 199 sf new wood deck atop (e) roof. install steel cuardrails attached to (e) bld parapets maher naDetails
unit #21 - proposed 199 sf new wood deck atop (e) roof. install steel cuardrails attached to (e) bld parapets maher na | $12,000 |