Permit GraphShortlistSan Francisco building permits since 2000

Zarin Gollogly Design & Build

Contractor license
1009077
State license record
Based in
San Francisco
On San Francisco permits
Mar 2018 to May 2024
Last 24 months
0 permits filed

10 permits since 2000: 8 completed, 1 in progress, 1 never finaled.

Of the 1 never-finaled permit, 1 is 3 to 5 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Bathroom remodel permits

AllDeck 3Stairs 2Kitchen remodel 2Bathroom remodel 3

3 bathroom remodel permits: 2 completed, 1 never finaled. Typically 1 days from filing to permit and 140 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Aug 16, 2023Completed
final sign-off Nov 2023
58 Waller Stremodel existing bathroom in garage, in-kind. no exterior changes.
Details
Permit
202308164512
Status
complete
Filed
Aug 16, 2023
Permit issued
Aug 16, 2023
Final sign-off
Nov 13, 2023
Declared cost
$25,000
Address
58 Waller St

remodel existing bathroom in garage, in-kind. no exterior changes.

Open the permit page

$25,000
Jun 5, 2023Completed
final sign-off Dec 2023
351 17th Avunit 353 (downstairs) - replace tile in two bathrooms. convert 1 tub into a shower. install new lights. install new vanity and faucets. add electrical outlets. unit 351 (upstairs) - remodel 1 bathroom in-kind: new tile. new toilet. new shower valve.
Details
Permit
202306059274
Status
complete
Filed
Jun 5, 2023
Permit issued
Jun 6, 2023
Final sign-off
Dec 13, 2023
Declared cost
$30,000
Address
351 17th Av

unit 353 (downstairs) - replace tile in two bathrooms. convert 1 tub into a shower. install new lights. install new vanity and faucets. add electrical outlets. unit 351 (upstairs) - remodel 1 bathroom in-kind: new tile. new toilet. new shower valve.

Open the permit page

$30,000
Oct 26, 2022Never finaled
issued Dec 2022, no final
610 Texas Stremodel (e) kitchen & bathroom. add half bath, remove skylight, replace skylight, add skylights (2). replace (e) stairs. remodel (e) bedroom, replace (e) bathroom & add walk in closet. replace (e) forced air heating system with heat pump system.
Details
Permit
202210265185
Status
issued
Filed
Oct 26, 2022
Permit issued
Dec 9, 2022
Declared cost
$120,000
Address
610 Texas St

remodel (e) kitchen & bathroom. add half bath, remove skylight, replace skylight, add skylights (2). replace (e) stairs. remodel (e) bedroom, replace (e) bathroom & add walk in closet. replace (e) forced air heating system with heat pump system.

Open the permit page

$120,000