Zarc Construction Inc

Contractor license
1038989
State license record
Based in
San Francisco
On San Francisco permits
Jul 2018 to Aug 2026
Last 24 months
13 permits filed

66 permits since 2000: 48 completed, 7 in progress, 7 never finaled, 4 expired or cancelled.

Of the 7 never-finaled permits, 3 are 3 to 5 years old, 4 are 5 to 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Deck permits

AllRoof deck 1Deck 1Stairs 9Kitchen remodel 24Bathroom remodel 29

1 deck permit: 1 completed. Typically 84 days from filing to permit and 562 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Mar 17, 2021Completed
final sign-off Dec 2022
77 Christopher Dr2nd floor remodel. 3 bed/2 bath, kitchen, dining, living reconfiguration. add deck at 2nd floor with structural strengthening. new skylights above kitchen.
Details
Permit
202103176728
Status
complete
Filed
Mar 17, 2021
Permit issued
Jun 9, 2021
Final sign-off
Dec 23, 2022
Declared cost
$189,000
Address
77 Christopher Dr

2nd floor remodel. 3 bed/2 bath, kitchen, dining, living reconfiguration. add deck at 2nd floor with structural strengthening. new skylights above kitchen.

Open the permit page

$189,000